AR103486A1 - Sistema de control y método de operaciones de retorno de flujo para yacimientos de esquistos bituminosos - Google Patents
Sistema de control y método de operaciones de retorno de flujo para yacimientos de esquistos bituminososInfo
- Publication number
- AR103486A1 AR103486A1 ARP160100176A ARP160100176A AR103486A1 AR 103486 A1 AR103486 A1 AR 103486A1 AR P160100176 A ARP160100176 A AR P160100176A AR P160100176 A ARP160100176 A AR P160100176A AR 103486 A1 AR103486 A1 AR 103486A1
- Authority
- AR
- Argentina
- Prior art keywords
- flow return
- return
- flow
- skis
- bituminous
- Prior art date
Links
- 238000000034 method Methods 0.000 title abstract 3
- 239000012530 fluid Substances 0.000 abstract 2
- 230000015572 biosynthetic process Effects 0.000 abstract 1
- 230000015556 catabolic process Effects 0.000 abstract 1
- 238000006731 degradation reaction Methods 0.000 abstract 1
- 238000005259 measurement Methods 0.000 abstract 1
- 230000000116 mitigating effect Effects 0.000 abstract 1
- 239000011435 rock Substances 0.000 abstract 1
- 239000007787 solid Substances 0.000 abstract 1
- 239000000126 substance Substances 0.000 abstract 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B49/00—Testing the nature of borehole walls; Formation testing; Methods or apparatus for obtaining samples of soil or well fluids, specially adapted to earth drilling or wells
- E21B49/008—Testing the nature of borehole walls; Formation testing; Methods or apparatus for obtaining samples of soil or well fluids, specially adapted to earth drilling or wells by injection test; by analysing pressure variations in an injection or production test, e.g. for estimating the skin factor
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B34/00—Valve arrangements for boreholes or wells
- E21B34/02—Valve arrangements for boreholes or wells in well heads
- E21B34/025—Chokes or valves in wellheads and sub-sea wellheads for variably regulating fluid flow
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B41/00—Equipment or details not covered by groups E21B15/00 - E21B40/00
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/12—Methods or apparatus for controlling the flow of the obtained fluid to or in wells
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/25—Methods for stimulating production
- E21B43/26—Methods for stimulating production by forming crevices or fractures
- E21B43/267—Methods for stimulating production by forming crevices or fractures reinforcing fractures by propping
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B47/00—Survey of boreholes or wells
- E21B47/06—Measuring temperature or pressure
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B49/00—Testing the nature of borehole walls; Formation testing; Methods or apparatus for obtaining samples of soil or well fluids, specially adapted to earth drilling or wells
- E21B49/005—Testing the nature of borehole walls or the formation by using drilling mud or cutting data
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B47/00—Survey of boreholes or wells
- E21B47/10—Locating fluid leaks, intrusions or movements
- E21B47/107—Locating fluid leaks, intrusions or movements using acoustic means
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01V—GEOPHYSICS; GRAVITATIONAL MEASUREMENTS; DETECTING MASSES OR OBJECTS; TAGS
- G01V9/00—Prospecting or detecting by methods not provided for in groups G01V1/00 - G01V8/00
- G01V9/02—Determining existence or flow of underground water
Landscapes
- Engineering & Computer Science (AREA)
- Geology (AREA)
- Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Physics & Mathematics (AREA)
- Geochemistry & Mineralogy (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- Chemical & Material Sciences (AREA)
- Analytical Chemistry (AREA)
- Geophysics (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- General Engineering & Computer Science (AREA)
- Operations Research (AREA)
- Testing Of Devices, Machine Parts, Or Other Structures Thereof (AREA)
- Pipeline Systems (AREA)
- Physical Or Chemical Processes And Apparatus (AREA)
- Aerodynamic Tests, Hydrodynamic Tests, Wind Tunnels, And Water Tanks (AREA)
Abstract
Un sistema y método de retorno de flujo emplean un modelo de retorno de flujo que caracteriza las propiedades del fluido y las propiedades mecánicas de la roca del yacimiento durante el retorno del flujo junto con la medición y el análisis químico y la producción de sólidos con respecto al fluido de retorno a los efectos de maximizar la eficacia durante las operaciones de retorno de flujo, mientras que se mitigan los daños de la formación y la degradación de la conductividad de la fractura hidráulica. La metodología puede definir una zona segura de operación de abatimiento para conducir las operaciones de retorno de flujo.
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| US201562107157P | 2015-01-23 | 2015-01-23 |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| AR103486A1 true AR103486A1 (es) | 2017-05-10 |
Family
ID=56417774
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| ARP160100176A AR103486A1 (es) | 2015-01-23 | 2016-01-22 | Sistema de control y método de operaciones de retorno de flujo para yacimientos de esquistos bituminosos |
Country Status (6)
| Country | Link |
|---|---|
| US (2) | US11111784B2 (es) |
| EP (1) | EP3247879B1 (es) |
| AR (1) | AR103486A1 (es) |
| CA (1) | CA2973875A1 (es) |
| SA (1) | SA517381975B1 (es) |
| WO (2) | WO2016118807A1 (es) |
Families Citing this family (68)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US10151737B2 (en) * | 2015-04-08 | 2018-12-11 | King Fahd University Of Petroleum And Minerals | Method for permeability prediction of shale gas |
| WO2017014732A1 (en) * | 2015-07-17 | 2017-01-26 | Halliburton Energy Services Inc. | Structure for fluid flowback control decision making and optimization |
| GB2557752B (en) * | 2015-09-09 | 2021-03-31 | Halliburton Energy Services Inc | Methods to image acoustic sources in wellbores |
| US10422220B2 (en) * | 2016-05-03 | 2019-09-24 | Schlumberger Technology Corporation | Method and systems for analysis of hydraulically-fractured reservoirs |
| CN106501146B (zh) * | 2016-10-08 | 2019-12-10 | 中国石油天然气股份有限公司 | 一种致密油藏物性上限确定方法及装置 |
| CN106526694A (zh) * | 2016-10-08 | 2017-03-22 | 中国石油天然气股份有限公司 | 一种致密油藏识别方法及装置 |
| CN108021728B (zh) * | 2016-10-28 | 2021-06-25 | 中国石油化工股份有限公司 | 一种压裂液返排制度的计算方法 |
| JP6991209B2 (ja) * | 2016-10-31 | 2022-01-12 | アブ ダビ ナショナル オイル カンパニー(エーディーエヌオーシー) | 油及びガス井からの生産流体等の流体をサンプリング及び/又は分析するための方法及びシステム |
| CA3050922C (en) * | 2017-02-08 | 2024-01-09 | Gas Technology Institute | Detection and quantification of proppant for optimized fracture treatment design in in-fill and new wells |
| US11365626B2 (en) * | 2017-03-01 | 2022-06-21 | Proptester, Inc. | Fluid flow testing apparatus and methods |
| CN110520717A (zh) * | 2017-03-03 | 2019-11-29 | 斯伦贝谢技术有限公司 | 电导探针流体性质测量系统和相关方法 |
| US11236603B2 (en) * | 2017-06-26 | 2022-02-01 | Conocophillips Company | Dynamic interpretation of data from hydraulic fracturing |
| WO2019015749A1 (en) * | 2017-07-19 | 2019-01-24 | Schlumberger Technology Corporation | FLUID FLOW PRIMING IN FLUID FLOW MODELS |
| US11151454B2 (en) * | 2017-09-28 | 2021-10-19 | Landmark Graphics Corporation | Multi-stage placement of material in a wellbore |
| US10519768B2 (en) | 2018-02-21 | 2019-12-31 | Saudi Arabian Oil Company | Systems and methods for operating hydrocarbon wells to inhibit breakthrough based on reservoir saturation |
| CN110309518B (zh) * | 2018-03-20 | 2022-03-01 | 中国石油化工股份有限公司 | 缝洞型碳酸盐岩油藏溶蚀孔洞分级分类建模方法 |
| US11225855B2 (en) * | 2018-03-21 | 2022-01-18 | ResFrac Corporation | Systems and methods for hydraulic fracture and reservoir simulation |
| IT201800004181A1 (it) * | 2018-04-03 | 2019-10-03 | Colonna Francesco Masi | Sistema di misura portata e quantità (metering) di fluidi |
| CN108875148B (zh) * | 2018-05-28 | 2021-01-19 | 中国石油大学(北京) | 缝洞型碳酸盐岩油藏缝洞分布图的建立方法及模型和应用 |
| US11808615B2 (en) * | 2018-07-26 | 2023-11-07 | Schlumberger Technology Corporation | Multiphase flowmeters and related methods |
| WO2020046105A1 (es) * | 2018-08-30 | 2020-03-05 | Instituto Mexicano Del Petróleo | Dispositivo para fondo de pozos productores de hidrocarburos sin tubería de producción convencional |
| CN109490507B (zh) * | 2018-10-18 | 2019-11-22 | 西南石油大学 | 页岩气井体积压裂后压裂液返排率的实验测试装置及方法 |
| US11035210B2 (en) * | 2018-10-22 | 2021-06-15 | Halliburton Energy Services, Inc. | Optimized foam application for hydrocarbon well stimulation |
| GB2594187B (en) * | 2018-12-21 | 2023-03-01 | Schlumberger Technology Bv | Determining reservoir fluid properties from downhole fluid analysis data using machine learning |
| US12254246B2 (en) * | 2019-01-18 | 2025-03-18 | Baker Hughes Oilfield Operations Llc | Graphical user interface for uncertainty analysis using mini-language syntax |
| CN109933844A (zh) * | 2019-01-28 | 2019-06-25 | 西南石油大学 | 一种基于分形维数的岩石破裂复杂程度表征方法 |
| WO2020161518A1 (en) * | 2019-02-05 | 2020-08-13 | Abu Dhabi National Oil Company | Method of detection of hydrocarbon horizontal slippage passages |
| CN111852426B (zh) * | 2019-04-24 | 2023-04-07 | 中国石油天然气股份有限公司 | 井间压裂缝缝间干扰的测试方法 |
| CO2019004629A1 (es) * | 2019-05-06 | 2020-11-10 | Ecopetrol Sa | Proceso de control de inyección de diluyente en fondo de pozo para dilucion de crudo extrapesado |
| US20200355838A1 (en) * | 2019-05-10 | 2020-11-12 | Halliburton Energy Services, Inc. | Detection and quantification of sand flows in a borehole |
| CN111950111B (zh) * | 2019-05-16 | 2024-04-05 | 中国石油化工股份有限公司 | 一种适用于底部开放的碳酸盐岩储层动态分析方法 |
| CN110306971A (zh) * | 2019-07-01 | 2019-10-08 | 中国石油天然气股份有限公司大港油田分公司 | 一种高含水后期油藏流场分级评价方法 |
| US11499397B2 (en) | 2019-10-31 | 2022-11-15 | Saudi Arabian Oil Company | Dynamic calibration of reservoir simulation models using flux conditioning |
| US11501038B2 (en) | 2019-10-31 | 2022-11-15 | Saudi Arabian Oil Company | Dynamic calibration of reservoir simulation models using pattern recognition |
| US11466557B2 (en) * | 2019-11-04 | 2022-10-11 | Chevron U.S.A. Inc. | Determining proppant distribution for a plurality of clusters within a fracture stage |
| CN111257202B (zh) * | 2020-04-07 | 2022-03-18 | 西南石油大学 | 一种含吸附气条件下页岩压裂液强制渗吸及返排实验方法 |
| US11952868B2 (en) * | 2020-04-07 | 2024-04-09 | Saudi Arabian Oil Company | Methods for generating synthetic production logs for perforated intervals of a plurality of wells |
| US11180982B2 (en) | 2020-04-21 | 2021-11-23 | Saudi Arabian Oil Company | Systems and methods to safeguard well integrity from hydraulic fracturing |
| US11333010B2 (en) | 2020-05-13 | 2022-05-17 | Saudi Arabian Oil Company | Smart choke valve to regulate well sand production |
| CN111396003B (zh) * | 2020-05-15 | 2022-03-15 | 中国石油天然气集团有限公司 | 一种常压页岩气水平井压裂后排液测试油嘴调整方法 |
| US11414954B2 (en) | 2020-07-06 | 2022-08-16 | Saudi Arabian Oil Company | Smart choke valve to assess and regulate production flow |
| US11434759B2 (en) | 2020-07-07 | 2022-09-06 | Saudi Arabian Oil Company | Optimization of discrete fracture network (DFN) using streamlines and machine learning |
| CN111914494B (zh) * | 2020-07-08 | 2024-03-26 | 长江大学 | 一种致密储层水平井压后压裂液返排率预测方法及系统 |
| CN114059981B (zh) * | 2020-07-30 | 2024-05-28 | 中国石油天然气股份有限公司 | 水平井重复压裂选层及压裂方式的选取方法 |
| CN112001134B (zh) * | 2020-09-04 | 2021-09-07 | 北京科技大学 | 一种非常规气藏流场结构识别方法及装置 |
| RU2745684C1 (ru) * | 2020-10-16 | 2021-03-30 | Общество с ограниченной ответственностью «Газпромнефть Научно-Технический Центр» | Способ сохранения безопасного диапазона проводимости трещины при выводе на режим скважины с ГРП |
| CN114510853B (zh) * | 2020-11-17 | 2024-06-28 | 中国石油化工股份有限公司 | 一种基于缝洞型油藏三维地应力场分布的井型优化设计方法 |
| CN112593921A (zh) * | 2020-12-15 | 2021-04-02 | 安徽理工大学 | 一种页岩气开采过断层套管变化模拟方法 |
| US20220213775A1 (en) * | 2021-01-04 | 2022-07-07 | Saudi Arabian Oil Company | Determining composite matrix-fracture properties of naturally fractured reservoirs in numerical reservoir simulation |
| US11702924B2 (en) * | 2021-01-08 | 2023-07-18 | Aramco Services Company | Determination of stimulated reservoir volume and estimated ultimate recovery of hydrocarbons for unconventional reservoirs |
| WO2022159567A1 (en) * | 2021-01-21 | 2022-07-28 | Schlumberger Technology Corporation | Autonomous valve system |
| US11976540B2 (en) * | 2021-02-05 | 2024-05-07 | Saudi Arabian Oil Company | Fracturing a subsurface formation based on a probabilistic determination of the required breakdown pressure |
| CN113092337B (zh) * | 2021-04-08 | 2022-01-28 | 西南石油大学 | 一种建立原地条件下致密岩心初始含水饱和度的方法 |
| US12241361B2 (en) * | 2021-08-24 | 2025-03-04 | Saudi Arabian Oil Company | Method and system to determine optimal perforation orientation for hydraulic fracturing slant wells |
| US12204061B2 (en) | 2021-09-30 | 2025-01-21 | Saudi Arabian Oil Company | Method and system for determining coarsened grid models using machine-learning models and fracture models |
| US20230186184A1 (en) * | 2021-12-09 | 2023-06-15 | Saudi Arabian Oil Company | Estimated ultimate recovery forecasting in unconventional reservoirs |
| CN114320249B (zh) * | 2021-12-28 | 2023-11-07 | 中国科学院广州能源研究所 | 一种水平井内氮气二氧化碳混合气射流装置及开采方法 |
| CN116411953A (zh) * | 2021-12-29 | 2023-07-11 | 中国石油天然气股份有限公司 | 一种基于返排液浓度曲线评价页岩气储层缝网形态的方法 |
| CN114810026B (zh) * | 2022-04-20 | 2023-11-03 | 中海油田服务股份有限公司 | 气井返排设置方法及装置 |
| WO2023214958A1 (en) * | 2022-05-02 | 2023-11-09 | Chevron U.S.A. Inc. | Evaluating choke valve performance during subterranean field operations |
| US12378881B2 (en) | 2022-05-26 | 2025-08-05 | Saudi Arabian Oil Company | Method for determining rock matrix and fracture permeability by using poroelastodynamics and density averaging schemes |
| CN114991747B (zh) * | 2022-05-26 | 2023-06-30 | 长江大学 | 一种基于环形阵列探针测量的页岩油产量解释方法 |
| US20240077348A1 (en) * | 2022-09-06 | 2024-03-07 | Saudi Arabian Oil Company | Measuring multiphase flows from wells |
| CN116359297B (zh) * | 2023-04-11 | 2025-07-22 | 中国石油化工股份有限公司 | 长岩心co2驱相前缘与组分前缘运移规律研究方法及装置 |
| US20240426202A1 (en) * | 2023-06-22 | 2024-12-26 | Conocophillips Company | Proppant flowback mitigation |
| WO2024264045A2 (en) * | 2023-06-23 | 2024-12-26 | Schlumberger Technology Corporation | Iterative ml powered horizon interpretation workflow |
| CN117807912B (zh) * | 2024-01-17 | 2024-07-30 | 西南石油大学 | 一种缝洞体油藏单井井壁垮塌判断方法 |
| CN119355834B (zh) * | 2024-12-24 | 2025-03-21 | 成都大数据产业技术研究院有限公司 | 一种基于物联感知设备的排水管网监测方法及系统 |
Family Cites Families (30)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US3224506A (en) * | 1963-02-18 | 1965-12-21 | Gulf Research Development Co | Subsurface formation fracturing method |
| US4630868A (en) * | 1979-05-11 | 1986-12-23 | Terra Tek, Inc. | Process for solution mining |
| US5353637A (en) * | 1992-06-09 | 1994-10-11 | Plumb Richard A | Methods and apparatus for borehole measurement of formation stress |
| US9863240B2 (en) * | 2004-03-11 | 2018-01-09 | M-I L.L.C. | Method and apparatus for drilling a probabilistic approach |
| WO2006039665A2 (en) * | 2004-10-01 | 2006-04-13 | Complete Production Services, Inc. | Apparatus and method for well completion |
| US20080000637A1 (en) | 2006-06-29 | 2008-01-03 | Halliburton Energy Services, Inc. | Downhole flow-back control for oil and gas wells by controlling fluid entry |
| US7472748B2 (en) * | 2006-12-01 | 2009-01-06 | Halliburton Energy Services, Inc. | Methods for estimating properties of a subterranean formation and/or a fracture therein |
| US7577527B2 (en) * | 2006-12-29 | 2009-08-18 | Schlumberger Technology Corporation | Bayesian production analysis technique for multistage fracture wells |
| US7806202B2 (en) | 2007-02-27 | 2010-10-05 | Precision Energy Services, Inc. | System and method for reservoir characterization using underbalanced drilling data |
| US8424599B2 (en) * | 2007-03-29 | 2013-04-23 | Fracmaster, Llc | Automated closed loop flowback and separation system |
| EA017146B1 (ru) * | 2007-07-26 | 2012-10-30 | Эксонмобил Апстрим Рисерч Компани | Способ регулирования поглощения бурового раствора |
| WO2009029135A1 (en) * | 2007-08-24 | 2009-03-05 | Exxonmobil Upstream Research Company | Method for predicting well reliability by computer simulation |
| BRPI0820870A2 (pt) * | 2007-12-13 | 2015-06-16 | Exxonmobil Upstream Res Co | Método para simular um modelo de reservatório. |
| US20110011595A1 (en) | 2008-05-13 | 2011-01-20 | Hao Huang | Modeling of Hydrocarbon Reservoirs Using Design of Experiments Methods |
| US8047284B2 (en) * | 2009-02-27 | 2011-11-01 | Halliburton Energy Services, Inc. | Determining the use of stimulation treatments based on high process zone stress |
| US8498852B2 (en) * | 2009-06-05 | 2013-07-30 | Schlumberger Tehcnology Corporation | Method and apparatus for efficient real-time characterization of hydraulic fractures and fracturing optimization based thereon |
| WO2011019565A2 (en) * | 2009-08-14 | 2011-02-17 | Bp Corporation North America Inc. | Reservoir architecture and connectivity analysis |
| US8567525B2 (en) * | 2009-08-19 | 2013-10-29 | Smith International, Inc. | Method for determining fluid control events in a borehole using a dynamic annular pressure control system |
| MY149416A (en) * | 2009-11-17 | 2013-08-30 | Petroliam Nasional Berhad Petronas | Enhanced dynamic well model for reservoir pressure determination |
| CA2829378A1 (en) * | 2011-03-09 | 2012-09-13 | Prad Research And Development Limited | Method for charcterizing subsurface formations using fluid pressure response during drilling operations |
| RU2552471C1 (ru) * | 2011-05-27 | 2015-06-10 | Эм-Ай Эл.Эл.Си. | Дезинфицирующая вода, используемая в операции гидравлического разрыва пласта |
| EP2570589A1 (en) * | 2011-09-16 | 2013-03-20 | Vetco Gray Controls Limited | Setting the value of an operational parameter of a well |
| GB2497321B (en) * | 2011-12-06 | 2014-06-18 | Senico Ltd | Multi-phase metering of fluid flows |
| GB201122027D0 (en) * | 2011-12-20 | 2012-02-01 | Bp Exploration Operating | Estimating flow in production well |
| US20140083687A1 (en) * | 2012-09-27 | 2014-03-27 | Schlumberger Technology Corporation | Production in fractured systems |
| US8812238B2 (en) | 2012-10-31 | 2014-08-19 | Halliburton Energy Services, Inc. | Systems and methods for analyzing flowback compositions in real time |
| WO2014182739A2 (en) * | 2013-05-07 | 2014-11-13 | Services Petroliers Schlumberger | Closed chamber impulse test with downhole flow rate measurement |
| US20140352968A1 (en) * | 2013-06-03 | 2014-12-04 | Cameron International Corporation | Multi-well simultaneous fracturing system |
| US10196888B2 (en) * | 2014-10-01 | 2019-02-05 | Baker Hughes, A Ge Company, Llc | Placement and uses of lateral assisting wellbores and/or kick-off wellbores |
| US10489523B2 (en) * | 2014-10-22 | 2019-11-26 | Board Of Supervisors Of Louisiana State University And Agricultural And Mechanical College | Apparatuses, systems and methods for performing remote real-time experiments |
-
2016
- 2016-01-22 AR ARP160100176A patent/AR103486A1/es unknown
- 2016-01-22 WO PCT/US2016/014431 patent/WO2016118807A1/en not_active Ceased
- 2016-01-22 WO PCT/US2016/014424 patent/WO2016118802A1/en not_active Ceased
- 2016-01-22 EP EP16740803.8A patent/EP3247879B1/en active Active
- 2016-01-22 US US15/545,771 patent/US11111784B2/en active Active
- 2016-01-22 US US15/542,816 patent/US20180010429A1/en not_active Abandoned
- 2016-01-22 CA CA2973875A patent/CA2973875A1/en not_active Abandoned
-
2017
- 2017-07-23 SA SA517381975A patent/SA517381975B1/ar unknown
Also Published As
| Publication number | Publication date |
|---|---|
| US20180010429A1 (en) | 2018-01-11 |
| WO2016118807A1 (en) | 2016-07-28 |
| EP3247879A1 (en) | 2017-11-29 |
| CA2973875A1 (en) | 2016-07-28 |
| SA517381975B1 (ar) | 2022-12-14 |
| US11111784B2 (en) | 2021-09-07 |
| US20180016897A1 (en) | 2018-01-18 |
| EP3247879A4 (en) | 2018-12-05 |
| EP3247879B1 (en) | 2020-09-30 |
| WO2016118802A1 (en) | 2016-07-28 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| AR103486A1 (es) | Sistema de control y método de operaciones de retorno de flujo para yacimientos de esquistos bituminosos | |
| AR103562A1 (es) | Sistema y método para el fracturamiento hidráulico con nanopartículas | |
| AR097542A1 (es) | Métodos y sistemas para la evaluación de la permeabilidad y la porosidad de la roca y la composición de los fluidos | |
| CO2017006514A2 (es) | Composiciones y métodos para mejorar una red de fracturas hidráulicas | |
| AR096088A1 (es) | Operaciones de facturación que emplean dióxido de cloro | |
| BR112019000843A2 (pt) | método para intensificar complexidade de fratura usando sistemas de desvio de campo distante | |
| AR095788A1 (es) | Método para incrementar la complejidad y conductividad de la red de fracturas | |
| AR099425A1 (es) | Método para proveer fracturas múltiples en una formación | |
| BR112017006302A2 (pt) | composição de circulação perdida, método para obstruir uma zona de circulação perdida e sistema para obstruir uma zona de circulação perdida | |
| AR094687A1 (es) | Métodos y composiciones para el tratamiento de formaciones subterráneas con materiales de circulación de pérdida hinchables | |
| BR112017014049A2 (pt) | método para reduzir a perda de circulação em uma formação subterrânea, fluido de tratamento e sistema para obstrução de uma zona de perda de circulação | |
| AR107988A1 (es) | Métodos de uso de polímeros superabsorbentes para aplicaciones de fracturamiento y control de arena | |
| MX394304B (es) | Acelerador de cemento pasivado. | |
| MX388483B (es) | Método para el diseño mejorado de la altura de fractura hidráulica en una formación de roca laminada subterránea. | |
| DK3108090T3 (da) | Hydraulic cutting tool, system and method for controlled hydraulic cutting through a pipe wall in a well, and also uses of the cutting tool and the system | |
| AR094475A1 (es) | Ruptor de baja temperatura para fluidos de pozo con su viscosidad aumentada por una poliacrilamida | |
| AR095599A1 (es) | Métodos, sistemas y composiciones para la reticulación controlada de líquidos para el servicio de pozos | |
| BR112017007463A2 (pt) | método de perfuração de um poço em uma formação subterrânea, sistema de poço, e, fluido de tratamento de poço. | |
| CL2017001226A1 (es) | Disposición de pernos de roca y un método para el uso de la disposición, y un sistema de reforzamiento que comprende dicha disposición. | |
| MX2016013856A (es) | Formacion de pozos multilaterales. | |
| BR112017010387A2 (pt) | método e sistema | |
| AR099547A1 (es) | Sistema y metodología para el tratamiento de pozos | |
| AR096173A1 (es) | Rompedores que contienen composiciones de hierro y sus métodos de uso | |
| GB2547566A (en) | Monitoring of the oil to water ratio for drilling fluids | |
| PE20171127A1 (es) | Sistemas y metodos para monitoreo de sistemas de recuperacion de metales |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| FB | Suspension of granting procedure |