NL2028011B1 - Pile assembly, gripping member for a vibratory hammer assembly and method for driving a pile assembly into the ground - Google Patents

Pile assembly, gripping member for a vibratory hammer assembly and method for driving a pile assembly into the ground Download PDF

Info

Publication number
NL2028011B1
NL2028011B1 NL2028011A NL2028011A NL2028011B1 NL 2028011 B1 NL2028011 B1 NL 2028011B1 NL 2028011 A NL2028011 A NL 2028011A NL 2028011 A NL2028011 A NL 2028011A NL 2028011 B1 NL2028011 B1 NL 2028011B1
Authority
NL
Netherlands
Prior art keywords
pile
sleeve
shaft
assembly
tip
Prior art date
Application number
NL2028011A
Other languages
Dutch (nl)
Inventor
Albertus Antonius Nijhof Jeroen
Original Assignee
Tybasi B V
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tybasi B V filed Critical Tybasi B V
Priority to NL2028011A priority Critical patent/NL2028011B1/en
Priority to PCT/EP2022/060155 priority patent/WO2022223481A1/en
Priority to EP22723124.8A priority patent/EP4189173A1/en
Priority to KR1020237039436A priority patent/KR20240024051A/en
Priority to US18/555,740 priority patent/US20240200298A1/en
Application granted granted Critical
Publication of NL2028011B1 publication Critical patent/NL2028011B1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/52Piles composed of separable parts, e.g. telescopic tubes ; Piles composed of segments
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D13/00Accessories for placing or removing piles or bulkheads, e.g. noise attenuating chambers
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/50Anchored foundations
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2600/00Miscellaneous
    • E02D2600/20Miscellaneous comprising details of connection between elements
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2600/00Miscellaneous
    • E02D2600/30Miscellaneous comprising anchoring details
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/42Foundations for poles, masts or chimneys
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/54Piles with prefabricated supports or anchoring parts; Anchoring piles
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D7/00Methods or apparatus for placing sheet pile bulkheads, piles, mouldpipes, or other moulds
    • E02D7/18Placing by vibrating

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

Pile assembly to be vibratorily driven into soil for a foundation, the pile assembly comprising a pile shaft, a pile tip, a mounting member and a pile sleeve. The pile tip is mountable to a bottom end of the pile shaft, wherein the pile tip has at least one pair of radial tip fins, the tip fins being arranged along a length of the pile tip. The mounting member being provided on a top end of the pile shaft and/or the pile sleeve. The pile sleeve being adapted to be arranged coaxially with the pile shaft, wherein the pile shaft extends through the pile sleeve, such that the pile sleeve and pile shaft are axially movable with respect to each other. The pile sleeve is adapted to be coupled with the pile shaft in an installed state of the pile assembly, wherein the pile assembly has been driven into the soil to a predetermined depth. The sleeve has at least a pair of radial sleeve fins, the sleeve fins being predominantly extending along a length of the sleeve. At least the pile shaft, the pile tip and the pile sleeve of the pile assembly a

Description

P35026NLOO/CHO/FKE Title: Pile assembly, gripping member for a vibratory hammer assembly and method for driving a pile assembly into the ground The invention relates to the field of piles for foundations, wherein the piles are vibratorily driven into the ground e.g. by a vibratory pile hammer. Such piles may be called displacement piles, as when the piles are driven into the ground, the soil they are driven through is displaced.
The piles may form a foundation, or may be part of a foundation. As such the piles are designed to carry a load (and/or weight) of the structure that is to be supported. These loads may also be lateral forces and/or moments of the forces the pile is required to withstand. Yet, in practice the pile’s ability to correctly carry the load depends on the condition of the soil and the surrounding layers. This is because the soil and the surrounding layers determine the stability of the pile in its installed position. The soil conditions and/or the load to be supported are however rarely the same. Thus, this may require a newly designed and manufactured pile for each situation. This is not cost effective from a manufacturing point of view. Furthermore, the condition of the soil and the layers may e.g. be uncertain prior to installation of the piles and/or not be uniform across the foundation area. Disadvantageously, current displacement piles to be vibratorily driven into the ground — such as shown in KR102115707 — do not offer the flexibility to deal with such issues. It is an object of the invention to provide a pile assembly which can be used in a wide range of conditions. It is a further object of the invention to provide an alternative pile assembly. This object is achieved with a pile assembly which is to be vibratorily driven into soil for a foundation, the pile assembly comprising: - a pile shaft, - a pile tip mountable to a bottom end of the pile shaft, the pile tip having at least one pair of radial tip fins, the tip fins being arranged along a length of the pile tip, - amounting member provided on a top end of the pile shaft and/or the pile sleeve, - apile sleeve adapted to be arranged coaxially with the pile shaft, wherein the pile shaft extends through the pile sleeve, such that the pile sleeve and pile shaft are axially movable with respect to each other, the pile sleeve being adapted to be
2. coupled with the pile shaft in an installed state of the pile assembly, wherein the pile assembly has been driven into the soil to a predetermined depth, wherein the sleeve has at least a pair of radial sleeve fins, the sleeve fins being predominantly extending along a length of the sleeve, wherein at least the pile shaft, the pile tip and the pile sleeve are independently exchangeable.
The pile assembly is to be vibratorily driven into soil for a foundation. Typically that means the assembly is vibrated into the ground by means of a vibration device. This vibration device may be a vibratory hammer, e.g. a so-called variable moment vibratory hammer. Such a variable moment vibratory hammer is first accelerated to a certain frequency, e.g. 2000-2500 rpm, before the pile assembly to be driven by the vibratory hammer assembly is made to vibrate. This is achieved by adjusting eccentrically rotating weights.
Due to the high frequencies with which the variable moment vibratory hammer - and thus the driven pile assembly - vibrate, the soil around the pile assembly will become plastic. The resistance that the pile assembly has to overcome in order to be installed in the subsoil is thus significantly lower and the vibrations generated in the soil are also greatly reduced.
The pile shaft of the pile assembly is to be driven into the soil in a predominantly vertical manner. Then, the pile shaft forms a vertical structural component to carry vertical loads. With the pile shaft being an independently exchangeable component of the assembly, the dimensioning - e.g. length, diameter, thickness — and/or materials of the pile shaft can be chasen according to the application at hand and/or the conditions encountered in the field.
For example, the length of the pile shaft can be such that the pile tip mounted thereon is installed in a load-bearing layer of the soil.
The pile tip being mountable to the bottom end of the shaft, it is driven into the soil as an extension of the shaft. The radial tip fins arranged along the length of the pile tip provide lateral stability to the pile tip in that in the installed state more surface area — in a lateral direction - is in contact with the soil. By extension it provides lateral stability to the pile shaft and/or the structure to be supported thereby. With the pile tip being an independently exchangeable component of the assembly, the dimensioning and/or materials of the pile tip can be chosen according to the application at hand and/or the conditions as encountered in the field. For example, when installing the pile assembly in soil having a strong soil structure, the tip fins may be relatively small. Alternatively, when the pile assembly is to be installed into soil of a relatively weak structure, the tip fins may be relatively large.
-3- The pile sleeve is adapted to be arranged around the pile shaft. The radial sleeve fins arranged along the length of the pile sleeve provide lateral stability to the pile assembly in that in the installed state more surface area — in a lateral direction - is in contact with the soil. With the pile sleeve being an independently exchangeable component of the assembly, the dimensioning and/or materials of the pile sleeve can be chosen according to the application at hand and/or the conditions as encountered in the field. For example, when installing the pile assembly in soil having a strong soil structure, the sleeve fins may be relatively small. Alternatively, when the pile assembly is to be installed into soil of a relatively weak structure, the sleeve fins may be relatively large.
Should the soil layers in which the pile assembly is to be installed for example be non-uniform in terms of ‘structural strength’ then the dimensioning of the tip fins and sleeve fins can be arranged accordingly by independently selecting the appropriate tip fins and/or sleeve fins for the soil layer they are to be installed in.
As such it is an advantage of the pile shaft, the pile tip and the pile sleeve being independently exchangeable that the pile assembly according to the invention allows for constructing a pile assembly that befits a wide range of conditions. This constructing of the pile assembly can be done by changing components of the pile assembly, rather than manufacturing a new complete pile. This makes the pile assembly, and a foundation system based thereon, highly adaptable. As a result the pile assembly is more cost effective in use and manufacturing.
The wide range of conditions may relate to the soil conditions, and/or lateral loads and/or moments to be borne by the pile assembly. In a pile assembly according to the invention these requirements can be met by selecting the appropriate pile shaft, pile tip and/or pile sleeve. This means that by matching local conditions the use of materials can be optimised. This leads to a cheaper and/or more sustainable pile assembly.
To facilitate matching these local conditions, at an installation site for a pile assembly a range may be provided for the pile shafts, pile sleeves and/or pile tips. Then, an appropriate pile assembly can be constructed on-site, for example if the on-site local conditions turn out differently than anticipated.
Itis an advantage of the sleeve being arranged around the pile shaft such that the pile sleeve and pile shaft are axially movable with respect to each other that then the pile shaft may be driven into the soil prior to driving the pile sleeve into the soil. This makes it easier to drive the
-4- pile assembly into the soil. Furthermore, this allows for positioning of the pile assembly with a high level of precision. When the pile assembly has been driven into the soil to a predetermined depth, the pile sleeve is adapted to be coupled with the pile shaft in the installed state of the pile assembly. This can e.g. be done by connecting a top end of the pile sleeve to the top end of the pile shaft. As the pile sleeve and pile shaft are coupled in the installed state, loads can be transferred from the pile tip and/or shaft into the pile sleeve, or vice versa.
In the installed state the pile assembly provides ‘ground anchoring’. That is, the pile assembly can transmit loads of the structure that is to be installed thereon — e.g. loads of a tensile nature - to deeper, stable areas within the ground.
In an embodiment, the sleeve fin at the trailing edge thereof branches off into two edges, both edges extending in opposite — at least partially - circumferential directions so as to define a Y- shaped cross-section. These edges increase the cross-section of the pile assembly that is to ‘cut’ the soil so as to be lowered into said soil. As such the two edges increase the resistance encountered by the pile assembly when it is being driven. Firstly, this provides further stability to the pile assembly in the circumferential direction. Secondly, this increased resistance may aid in slowing down the pile assembly when it is being driven into the soil, e.g. so as not the drive the pile assembly beyond a predetermined depth.
In a further embodiment, the sleeve fins have a slanting leading edge extending under an angle a with respect to the longitudinal axis of the sleeve, for example with an angle of 30°< a < 90°. This slanting leading edge aids in installing the pile assembly into the soil, in that the bottom of the leading edge defines the smallest cross-section to come in contact with the soil. After the leading edge has cut an initial path through the soil, the fins’ increasing cross- section can be driven into the ground with less resistance.
In another embodiment, the sleeve fins have a slanting trailing edge extending under an angle B with respect to the longitudinal axis of the sleeve.
In another embodiment, the sleeve fins are uniformly distributed along the circumference of the sleeve.
-5- In a practical embodiment, the sleeve fins extend in diametrically opposite radial directions. In a further embodiment, the pile sleeve has multiple pairs, preferably two pairs, of radial sleeve fins, wherein the fins of each of the pairs extend in diametrically opposite radial directions. In yet another practical embodiment, the tip fins have a slanting leading edge. In a further embodiment, the tip fins are uniformly distributed along the circumference of the sleeve.
In another practical embodiment, the tip fins extend in diametrically opposite radial directions. In a further embodiment, the pile tip has multiple pairs, preferably two pairs, of radial tip fins wherein the fins of each of the pairs extend in diametrically opposite radial directions.
In yet a further embodiment, the assembly comprises at least one guiding element for centring the pile shaft within the sleeve.
In an embodiment, the guiding element comprises a ring mounted to an inner side of the sleeve. The pile shaft can then be arranged coaxially with the ring. Such a ring may be provided with ribs to increase stiffness thereof. The ring being mounted to the inner side of the sleeve and being arranged coaxially with the pile shaft, it may aid in transferring loads and moments from the pile shaft to the pile sleeve, and vice versa.
In another embodiment, the guiding element is provided with a friction preventive measure. Should the guiding element be embodied as a ring mounted to the inner side of the sleeve, then said ring may be provided with a friction preventive measure on an inner side thereof. This may for example be an inner ring to be mounted in the ring, e.g. a Teflon ring.
In yet another embodiment, the guiding element comprises two axially spaced rings.
In a further embodiment, the pile shaft is provided with a dedicated connection element adapted to be engaged by a vibratory device used for driving the pile assembly.
In a further embodiment, the pile sleeve is provided with a dedicated connection element adapted to be engaged by a vibratory device used for driving the pile assembly.
-6- In a further embodiment, in a driving state, wherein the pile shaft and the pile sleeve are both driven into soil by means of a vibratory device, the connection element of the pile shaft and the connection element of the sleeve form a mutual connection element engageable by the vibratory device.
In embodiments, - the pile shaft and pile sleeve are axially movable with respect to each other in a pre-installation state wherein the pile shaft is arranged coaxially in the pile sleeve and positioned such that the tip member engages the ground surface, - the pile shaft and pile sleeve are axially movable with respect to each other in in a first driving state wherein the pile shaft is being driven into the sail by means of a vibratory device and the pile shaft is arranged coaxially in the pile sleeve, - the pile shaft and the pile sleeve are coupled in a second driving state, wherein the pile shaft and the pile sleeve are driven together into soil by means of a vibratory device, - the pile shaft is fixed to the pile sleeve, such that they form a unit, in an installed state wherein the pile assembly has been driven into the soil to a predetermined depth.
The invention also relates to a gripping member for a vibratory hammer assembly for driving a pile assembly according to the invention, the gripping member comprising a main body having dedicated pile shaft grippers and dedicated pile sleeve grippers.
In an embodiment, the pile shaft grippers and/or the pile sleeve grippers are hooks that are pivotably arranged in or on said main body. The invention also relates to a method for driving a pile assembly according to the invention into the ground. The method comprises the steps of: - arranging the pile shaft coaxially in the pile sleeve, - positioning the pile shaft such that the tip member engages the ground surface, - gripping the pile shaft with one or more grippers of a vibratory hammer assembly to drive the pile shaft into the soil in a first stroke, - gripping the sleeve with one or more grippers of the vibratory hammer assembly to drive the sleeve and the shaft together into the soil in a second stroke, - fixing the pile shaft to the pile sleeve such that they form a unit.
-7- In embodiments, the method comprises the steps of: - gripping the pile shaft with grippers of the vibratory hammer assembly to drive the pile shaft into the soil until the top end of the pile shaft is near to or aligned with a top end of the sleeve, - gripping the sleeve with the vibratory hammer assembly in addition to the gripping of the pile shaft, so as to drive the pile shaft and the sleeve into the soil as a unit.
In embodiments, the gripping of the pile shaft is done using dedicated pile shaft grippers of the vibratory hammer assembly and/or wherein gripping of the pile sleeve is done using dedicated pile sleeve grippers of the vibratory hammer assembly.
In embodiments, the method comprises the steps of: - providing a range for at least one of the pile shaft, pile tip and pile sleeve - determining soil conditions at an installation site for the pile assembly - selecting from at least one of the provided ranges the respective pile shaft, pile tip and/or pile sleeve that match the soil conditions - constructing the pile assembly with the selected pile shaft, pile tip and/or pile
The method may further involve determining design requirements for the pile assembly, these may e.g. be design requirements relating to the structural loads, lateral forces and/or moments to be carried by the pile assembly and/or requirements relating to the soil conditions, and/or requirements as a result of interaction between the structural loads and the soil conditions.
The invention will now be described with reference to the figures, in which like reference symbols designate like parts.
In these figures: Fig. 1 schematically shows a frontal view and side view, respectively, of a pile assembly according to the invention in an installed state in the soil, Fig. 2A-2B schematically show a frontal view and side view of a pile sleeve for the pile assembly of Fig. 1,
Fig. 2C schematically shows the pile shaft for the pile assembly of Fig.1,
-8- Fig. 3 schematically shows in perspective the pile assembly of Fig. 1 in a first driving state, Fig. 4 schematically shows in perspective the pile assembly of Fig. 1 in a second driving state,
Fig. 5 schematically shows in perspective the pile assembly of Fig. 1 in an advanced second driving state, Fig. 6A-6B schematically show side-by-side the pile assembly of Fig. 1 in the installed state in perspective and in a frontal view another pile assembly according to the invention in the installed state; Fig. 7A-7B schematically show in perspective the pile sleeve of Fig. 1,
Fig. 8 schematically shows in perspective a pile tip for a pile assembly according to the invention, Fig. 9A schematically shows a detail of the pile assembly of Figs. 3-5,
Fig.
SB schematically shows in perspective the guiding mechanism of Fig. 9A, Fig. 9C schematically shows in perspective a friction preventive measure for a pile assembly according to the invention,
Fig. 10 schematically shows in perspective a gripping member for a vibratory hammer assembly in the first driving state, Fig. 11 schematically shows in perspective a gripping member for a vibratory hammer assembly in the second driving state,
Fig. 12A schematically shows in perspective a main body for the gripping member of Fig. 11 Fig. 12B schematically shows in perspective a hook for the gripping member of Fig. 11, and
Fig. 13 schematically shows in perspective a structure mounted on a pile assembly according to the invention.
-9.- In Fig. 1 is shown a frontal view and side view, respectively, of a pile assembly 1 according to the invention. The assembly 1 in Fig. 1 is in an installed state in the soil. That is the assembly is installed in the sail in a position below ground level 2. To achieve this position, the pile assembly 1 has been driven into the soil to a predetermined depth.
The pile assembly 1 comprises a pile shaft 10, a pile tip 30 and a pile sleeve 20. As at least the pile shaft, the pile tip and the pile sleeve are independently exchangeable, the shaft 10, tip 30 and sleeve 20 shown in Fig. 1 and Figs. 2A-2C may have been selected so as to optimise the pile assembly 1 for use in the installation site of Fig. 1.
The pile tip 30 in Fig 1 comprises a tip shaft 32. This tip shaft 32 is mounted to a bottom end 11 of the pile shaft 10 by means of fastening means 33. The pile tip 30 has at least one pair of radial tip fins 31, 33 the tip fins 31,33 being arranged along a length LT1, LT2 of the pile tip
30.
The pile assembly 1 further comprises a mounting member 40 provided on a top end 3 of the pile assembly 1. This mounting member 40 may be used for installing a structure on the pile assembly 1. The mounting member 40 may form an integral part of the pile sleeve 20 (as shown in Figs. 2A, 2B).
The pile sleeve 20 shown in Fig. 1 is arranged coaxially with the pile shaft 10, wherein the pile shaft 10 extends through the pile sleeve 20. In the installed state as shown the pile sleeve 20 is coupled to the pile shaft 10 by means of a top plate 50 and fastening means 51. Thus, the pile sleeve 20 and pile shaft 10 are fixed to one another and may be used to support, hold and/or restrain a structure installed thereupon as a unit. It should be appreciated that the pile sleeve 20 and pile shaft 10 may equally be coupled in different ways for which a structure installed thereupon can be supported, held or restrained as a unit. The pile sleeve 20 has a pair of radial sleeve fins 21, with each of the sleeve fins 21 extending outwardly from the sleeve 20 in diametrically opposite radial directions. The sleeve fins 21 have a slanting leading edge 22. The leading edge 22 extends under an angle a with respect to the longitudinal axis A of the sleeve 20. This angle may for example be in the range of 30°< a < 80°.
The sleeve fins 21 have a slanting trailing edge 23 extending under an angle B with respect to the longitudinal axis of the sleeve 20.
-10- It can be seen in the side view of Fig. 1 that the sleeve fins 21 predominantly extend along a length LS of the sleeve 20. The sleeve fins 21 - at the trailing edge 23 thereof branch off into two edges 25, 26. The edges 25,26 extend in opposite — at least partially - circumferential directions so as to define a Y-shaped cross-section (see the side view of Fig 1). The pile sleeve 20 and the edges 25, 26 can also be seen in Figs. 7A-7B, in respectively a predominantly frontal view and a perspective side view. The assembly 1 comprises guiding elements 60, 65. These guiding elements can be used for centring the pile shaft 10 within the sleeve 20. In Fig. 1 there are two guiding elements 60, 65 which are axially spaced. That is, the guiding element 80 is provided near the top end 3 of the pile sleeve 20, and the guiding element 65 is provided near the bottom end 4 of the sleeve
20. In Fig. 3 is schematically shown in perspective the pile assembly 1 in a first driving state. In this state, the pile shaft 10 and pile sleeve 20 are axially movable with respect to each other and the pile shaft 10 is being driven into the soil 8 by means of a vibratory device. The pile shaft 10 is arranged coaxially in the pile sleeve 20. In Fig. 3 the pile shaft has been gripped by a gripping member 100 of a vibratory hammer assembly — e.g. by means of grippers on or in the gripping member 100 - and the pile shaft 10 has been positioned so as to engage the ground surface 2 with the pile tip 30. Vibrations induced by the vibratory hammer assembly are transferred from the gripping member 100 to the pile shaft 10, as a result of which the pile shaft 10 and the pile tip 30 will provide pressure onto the soil so as to displace the soil and to be lowered underground. The state shown in Fig. 3 prior to any driving of the vibratory hammer assembly may be called a pre-installation state. In a first stroke the pile shaft is driven into the soil. The result of this stroke can be seen in Fig. 4, where the pile shaft 10, and the pile tip 30 mounted thereto, have been driven into the ground. Yet, the pile sleeve 20 is still positioned above ground. In Fig. 4 in a second driving state, the pile shaft 10 and the pile sleeve 20 are to be driven together into soil 8 in a second stroke by means of the vibratory hammer assembly. To effect this second stroke the gripping member 100 grips the sleeve 20 with one or more grippers. This can be done in the current embodiment, as the pile shaft has been driven into the ground until the top end of the pile shaft 10 is near to or aligned with the top end of the sleeve 20.
-11- As the pile shaft 10 and sleeve 20 are driven together, they — at least temporarily — form a unit due to the mutual gripping of the shaft 10 and sleeve 20 by the gripping member 100. That is, the sleeve 20 and shaft 10 are coupled due to the mutual gripping. The sleeve 20 has been gripped by gripping member 100 in addition to retaining the grip on to pile shaft 10. The result of the second stroke can be seen in Fig. 5, where the pile shaft 10 and pile sleeve 20 are both positioned underground after having been driven into the soil as a unit. Gripping of the pile shaft 20 can be done using dedicated pile shaft grippers of the vibratory hammer assembly and/or gripping of the pile sleeve can be done using dedicated pile sleeve grippers of the vibratory hammer assembly. Such dedicated grippers can be seen in Figs. 10-
11. In Figs. 6A-6B the installed state of the pile assemblies 1 and 101 is shown. Here, the pile shaft 10 has been fixed to the pile sleeve 20 by a top plate 50 such that they form a unit. The difference between the pile assemblies 1 and 101 being that assembly 101 has a pile tip 130 with tip fins 131 that are smaller than the tip fins 31 of assembly 1. The tip fins 131 may e.g. more suited to soil layers of a stronger structure and/or for a structure for which smaller moments and/or loads are to be borne. Whereas the tip fins 31 may be more suited to soil layers of a weaker structure and/or for a structure for which larger moments and/or loads are to be borne. This underlines the independent exchangeability of the pile tips 30, 130. A similar principle may apply to the pile sleeve 20 with its sleeve fins 21 and/or the pile shaft 10. To construct, or assemble, a pile assembly such as pile assemblies 1 or 101 a range may be provided for at least one of the pile shaft, pile tip and pile sleeve. Then, for certain soil conditions at an installation site for the pile assembly and/or design requirements for the pile assembly in those soil conditions the appropriate pile shaft, pile tip and/or pile sleeve may be selected. That is, these components can be selected such that the pile assembly is appropriate for use in the installation site and for carrying the loads of the structure to be mounted thereupon.
In Fig. 8 is schematically shown in perspective a pile tip 230 for a pile assembly according to the invention. The pile tip 230 comprises a tip shaft 234 which is adapted to be mounted to a pile shaft. The tip shaft 234 being mounted on a ring 235. The pile tip 230 is shown to have radial tip fins 231, 232, 233 for which the fins 232 and 321 can be seen to be formed as a diametrically opposed pair of fins. The fin 233 may also be
-12- one of a pair of fins, e.g. a diametrically opposed pair. Then, the fins of pile tip 230 are uniformly distributed along the circumference thereof. The fins at a top end 235, 236 of the pile 230 extend along the tip shaft 234. At a lower end 237 of the pile tip 230 the fins 231, 232, 233 form a pointed end. In Fig. 9A is schematically shown a detail of the pile assembly 1 of Figs. 3-5. The pile shaft 10 of the assembly 1 is coaxially arranged in the pile sleeve 20 and has a pile tip 30 mounted thereto. The detail of Fig. 9A shows that the pile shaft 10 is arranged coaxially in a guiding mechanism 150. This guiding mechanism is shown in perspective in Fig. 9B.
Fig. 9B schematically shows in perspective the guiding mechanism 150 of Fig. 9A. The guiding mechanism 150 is embodied as a ring 151 having ribs 152, which ring is mounted on an inner side of the pile sleeve 20. The ring may be provided with a friction preventive measure. An example of such a measure is shown in Fig. 9C . There a ring 180 of low friction material, e.g. of Teflon, is shown which can be mounted in the ring 150. This ring 180 is also used in the assembly of Fig. 9A. There it can be seen that the lower end 181 of ring 180 protrudes out of the guiding mechanism 150.
In Fig. 10 is schematically shown in perspective a gripping member 200 for a vibratory hammer assembly in the first driving state. That is, the gripping member has gripped the pile shaft 310. It can be seen that pile shaft 310 is provided with a dedicated connection element 330 adapted to be engaged by the vibratory hammer assembly used for driving the pile assembly, i.e. in this case by means of the gripping member 200.
The gripping member 200 is embodied as comprising a main body 220 having dedicated pile shaft grippers 250 and dedicated pile sleeve grippers 270. In Fig. 10 these pile shaft grippers 250 and the pile sleeve grippers 270 are hooks that are pivotably arranged in or on said main body 220. The pile shaft grippers 250 of Fig. 10 pivot so as to hook their lower end 251 over protruding edge of the dedicated connection element 330. An example of an embodiment of the hooks 250, 270 can be seen in more detail in Fig. 12B. Provisions 255, 275 for arranging the hooks in the main body 220 can be seen in Fig. 12A.
In Fig. 11 is schematically shown in perspective the gripping member 200 for a vibratory hammer assembly in the first driving state. That is, the pile shaft 310 and the pile sleeve 320 are both driven into soil by means of the vibratory hammer assembly. In Fig. 11 the pile sleeve 320 is provided with a dedicated connection element 350 adapted to be engaged by
-13- the gripping member 200 of the vibratory hammer assembly used for driving the pile assembly.
The pile sleeve grippers 270 have now pivoted with respect to their position of Fig. 10 so as to hook their lower end 271 over a protruding edge of the dedicated connection element 350 of the pile sleeve 320. In the state shown in Fig. 11 the connection element 330 of the pile shaft and the connection element 350 of the sleeve 320 form a mutual connection element engageable by the vibratory hammer assembly.
Then, the pile sleeve 320 and pile shaft 310 can be driven into the soil as a unit.
In Fig. 13 is schematically shown in perspective a structure 400 mounted on a pile assembly 500 according to the invention.
A pile shaft (not shown) arranged in the pile sleeve 520 is coupled therewith via fastening 550. A mounting member 450 of the structure 400 is fixed to a mounting member 525 of the pile assembly 500 by means of fasteners 600.

Claims (25)

-14 - CONCLUSIES-14 - CONCLUSIONS 1. Paalsamenstel om door middel van vibraties in de grond te worden gedreven voor een fundering, waarbij het paalsamenstel omvat: - een paalschacht, - een paalpunt die monteerbaar is op een onderste einde van de paalschacht, waarbij de paalpunt ten minste één paar radiale puntvinnen heeft, waarbij de puntvinnen zijn aangebracht langs een lengte van de paalpunt, - een montageelement dat is voorzien op een bovenste einde van de paalschacht en/of de paalhuls, - een paalhuls die is ingericht om coaxiaal met de paalschacht te worden aangebracht, waarbij de paalschacht zich uitstrekt door de paalhuls, zodanig dat de paalhuls en paalschacht axiaal beweegbaar zijn ten opzichte van elkaar, waarbij de paalhuls is ingericht om met de paalschacht te worden gekoppeld in een geïnstalleerde toestand van het paalsamenstel, waarbij het paalsamenstel in de grond is gedreven tot een vooraf bepaalde diepte, waarbij de huls ten minste een paar radiale hulsvinnen heeft, waarbij de hulsvinnen zich in hoofdzaak langs een lengte van de huls uitstrekken, waarbij ten minste de paalschacht, de paalpunt en de paalhuls onafhankelijk uitwisselbaar zijn.Pile assembly to be driven into the ground by vibration for a foundation, the pile assembly comprising: - a pile shaft, - a pile tip mountable on a lower end of the pile shaft, the pile tip having at least one pair of radial tip fins with the tip fins arranged along a length of the pile tip, - a mounting element provided on an upper end of the pile shaft and/or the pile sleeve, - a pile sleeve adapted to be fitted coaxially with the pile shaft, the pile shaft extending through the pile sleeve such that the pile sleeve and pile shaft are axially movable relative to each other, the pile sleeve adapted to be coupled to the pile shaft in an installed condition of the pile assembly, the pile assembly being driven into the ground until a predetermined depth, the sleeve having at least a pair of radial sleeve fins, the sleeve fins being substantially extend along a length of the sleeve, wherein at least the pile shaft, pile tip and pile sleeve are independently interchangeable. 2. Paalsamenstel volgens conclusie 1, waarbij de hulsvin aan een achterrand daarvan vertakt in twee randen, waarbij beide randen zich in tegenovergestelde — ten minste gedeeltelijke — omtreksrichtingen uitstrekken om zo een Y-vormige doorsnede te definiëren.Pole assembly according to claim 1, wherein the sleeve fin branches at a rear edge thereof into two edges, both edges extending in opposite - at least partial - circumferential directions so as to define a Y-shaped cross-section. 3. Paalsamenstel volgens een van de voorgaande conclusies, waarbij de hulsvinnen een schuine voorrand hebben die zich onder een hoek a uitstrekt ten opzichte van de longitudinale as van de huls.3. Pole assembly according to one of the preceding claims, in which the sleeve fins have a sloping front edge which extends at an angle α with respect to the longitudinal axis of the sleeve. 4. Paalsamenstel volgens een van de voorgaande conclusies, waarbij de hulsvinnen een schuine achterrand hebben die zich onder een hoek B uitstrekt ten opzichte van de longitudinale as van de huls.4. Pole assembly according to one of the preceding claims, in which the sleeve fins have a sloping trailing edge which extends at an angle B relative to the longitudinal axis of the sleeve. 5. Paalsamenstel volgens een van de voorgaande conclusies, waarbij de hulsvinnen uniform verdeeld zijn rond de omtrek van de huls.A post assembly according to any one of the preceding claims, wherein the sleeve fins are uniformly distributed around the circumference of the sleeve. 6. Paalsamenstel volgens een van de voorgaande conclusies, waarbij de hulsvinnen zich in diametraal tegenovergestelde radiale richtingen uitstrekken.6. Pole assembly according to one of the preceding claims, in which the sleeve fins extend in diametrically opposite radial directions. -15--15- 7. Paalsamenstel volgens een van de voorgaande conclusies, waarbij de paalhuls meerdere paren, bij voorkeur twee paren, van radiale hulsvinnen heeft, waarbij de vinnen van elk van de paren zich in diametraal tegenovergestelde radiale richtingen uitstrekken.Pile assembly according to any of the preceding claims, wherein the pile sleeve has several pairs, preferably two pairs, of radial sleeve fins, the fins of each of the pairs extending in diametrically opposite radial directions. 8. Paalsamenstel volgens een van de voorgaande conclusies, waarbij de puntvinnen een schuine voorrand hebben.8. Pole assembly according to one of the preceding claims, in which the point fins have a sloping front edge. 9. Paalsamenstel volgens een van de voorgaande conclusies, waarbij de puntvinnen uniform verdeeld zijn rond de omtrek van de punt.A post assembly according to any one of the preceding claims, wherein the tip fins are uniformly distributed around the circumference of the tip. 10. Paalsamenstel volgens een van de voorgaande conclusies, waarbij de puntvinnen zich in diametraal tegenovergestelde radiale richtingen uitstrekken.10. Pile assembly according to one of the preceding claims, in which the tip fins extend in diametrically opposite radial directions. 11. Paalsamenstel volgens een van de voorgaande conclusies, waarbij de paalpunt meerdere paren, bij voorkeur twee paren, van radiale puntvinnen heeft, waarbij de vinnen van elk van de paren zich in diametraal tegenovergestelde radiale richtingen uitstrekken.Pile assembly according to one of the preceding claims, wherein the pile tip has several pairs, preferably two pairs, of radial tip fins, the fins of each of the pairs extending in diametrically opposite radial directions. 12. Paalsamenstel volgens een van de voorgaande conclusies, waarbij het samenstel ten minste één geleidingselement omvat om de paalschacht te centreren in de huls.12. Pile assembly according to one of the preceding claims, wherein the assembly comprises at least one guide element for centering the pile shaft in the sleeve. 13. Paalsamenstel volgens conclusie 12, waarbij het geleidingselement een ring omvat die is gemonteerd op een binnenste zijde van de huls.13. Pole assembly according to claim 12, wherein the guide element comprises a ring mounted on an inner side of the sleeve. 14. Paalsamenstel volgens conclusie 12 of 13, waarbij het geleidingselement is voorzien van een preventieve maatregel tegen frictie.14. Pile assembly according to claim 12 or 13, wherein the guide element is provided with a preventive measure against friction. 15. Paalsamenstel volgens een van de conclusie 12-14, waarbij het geleidingselement twee axiaal op afstand van elkaar geplaatste ringen omvat.15. Pile assembly according to one of claims 12-14, in which the guide element comprises two axially spaced apart rings. 16. Paalsamenstel volgens een van de voorgaande conclusies, waarbij de paalschacht is voorzien van een specifiek verbindingselement dat is ingericht om aangegrepen te worden door een vibrerend apparaat dat wordt gebruikt om een paalsamenstel te drijven.A pile assembly according to any one of the preceding claims, wherein the pile shaft is provided with a specific connecting element adapted to be engaged by a vibrating device used to drive a pile assembly. 17. Paalsamenstel volgens een van de voorgaande conclusies, waarbij de paalhuls is voorzien van een specifiek verbindingselement dat is ingericht om aangegrepen te 40 worden door een vibrerende inrichting die wordt gebruikt om een paalsamenstel te drijven.17. Pile assembly according to any of the preceding claims, wherein the pile sleeve is provided with a specific connecting element adapted to be engaged by a vibrating device used to drive a pile assembly. -16 --16- 18. Paalsamenstel volgens conclusie 16 en 17, waarbij in een drijvingstoestand, waarin de paalschacht en de paalhuls beide de grond in worden gedreven door middel van een vibrerende inrichting, het verbindingselement van de paalschacht en het verbindingselement van de huls een onderling verbindingselement vormen dat aangegrepen kan worden door de vibrerende inrichting.18. Pile assembly according to claims 16 and 17, wherein in a driving condition, in which the pile shaft and the pile sleeve are both driven into the ground by means of a vibrating device, the connecting element of the pile shaft and the connecting element of the sleeve form an inter-connecting element which is engaged can be controlled by the vibrating device. 19. Paalsamenstel volgens een van de voorgaande conclusies, waarbij: - paalschacht en paalhuls axiaal beweegbaar zijn ten opzichte van elkaar in een pre-installatie toestand waarin de paalschacht coaxiaal in de paalhuls in aangebracht en zo is gepositioneerd dat de punt ingrijpt op het grondoppervlak, - de paalschacht en de paalhuls axiaal beweegbaar zijn ten opzichte van elkaar in een eerste drijvingstoestand waarin de paalschacht de grond in wordt gedreven door middel van een vibrerende inrichting en de paalschacht coaxiaal in de paalhuls in aangebracht, - de paalschacht en de paalhuls gekoppeld zijn in een tweede drijvingstoestand, waarin de paalschacht en de paalhuls samen de grond in worden gedreven door middel van een vibrerende inrichting, - de paalschacht is bevestigd aan de paalhuls, zodat ze een eenheid vormen, in een geïnstalleerde toestand waarin het paalsamenstel de grond in is gedreven tot een vooraf bepaalde diepte.19. Pile assembly according to one of the preceding claims, wherein: - pile shaft and pile sleeve are axially movable relative to each other in a pre-installation condition in which the pile shaft is arranged coaxially in the pile sleeve and is positioned such that the tip engages the ground surface, - the pile shaft and the pile sleeve are axially movable relative to each other in a first driving condition in which the pile shaft is driven into the ground by means of a vibrating device and the pile shaft is coaxially arranged in the pile sleeve, - the pile shaft and the pile sleeve are coupled in a second driving state, in which the pile shaft and the pile sleeve are driven together into the ground by means of a vibrating device, - the pile shaft is attached to the pile sleeve so that they form a unit, in an installed condition in which the pile assembly is driven into the ground to a predetermined depth. 20. Aangrijpingsorgaan voor een trilbloksamenstel om een paalsamenstel volgens een van de conclusies 1-19 te drijven, waarbij het aangrijpingsorgaan een hoofdlichaam omvat met specifieke paalschachtgrijpers en specifieke paalhulsgrijpers.An engagement member for a vibratory hammer assembly to drive a pile assembly according to any one of claims 1-19, wherein the engagement member comprises a main body having specific pile shaft grippers and specific pile sleeve grippers. 21. Aangrijpingsorgaan volgens conclusie 20, waarbij de paalschachtgrijpers en/of de paalhulsgrijpers haken zijn die scharnierbaar zijn aangebracht in of op het hoofdlichaam.The engagement member of claim 20, wherein the pile shaft grippers and/or the pile sleeve grippers are hooks pivotally mounted in or on the main body. 22. Werkwijze voor het in de grond drijven van een paalsamenstel volgens een van de conclusies 1-19, waarbij de werkwijze de stappen omvat van: - het coaxiaal aanbrengen van de paalschacht in de paalhuls, - het zodanig positioneren van de paalschacht dat het puntorgaan ingrijpt op het grondoppervlak,22. Method for driving a pile assembly according to any one of claims 1-19 into the ground, the method comprising the steps of: - arranging the pile shaft coaxially in the pile sleeve, - positioning the pile shaft such that the point member intervenes on the ground surface, -17 - - het grijpen van de paalschacht met één of meer grijpers van het trilbloksamenstel om de paalschacht de grond in te drijven in een eerste slag, - het grijpen van de huls met één of meer grijpers van het trilbloksamenstel om de huls en de schacht samen de grond in te drijven in een tweede slag, - het bevestigen van de paalschacht aan de paalhuls zodat ze een eenheid vormen.-17 - - gripping the pile shaft with one or more grippers of the vibratory hammer assembly to drive the pile shaft into the ground in a first stroke, - gripping the sleeve with one or more grippers of the vibratory hammer assembly about the sleeve and shaft driving them into the ground together in a second stroke, - attaching the pile shaft to the pile sleeve so that they form a unit. 23. Werkwijze volgens conclusie 22, waarbij de werkwijze de stappen omvat van: - het grijpen van de paalschacht met de grijpers van het trilbloksamenstel om de paalschacht de grond in te drijven tot een bovenste einde van de paalschacht dichtbij of in lijn is met een bovenste einde van de huls, - het grijpen van de huls met het trilbloksamenstel in aanvulling op het grijpen van de paalschacht, om zo de paalschacht en de huls als een eenheid de grond in te drijven.A method according to claim 22, wherein the method comprises the steps of: - gripping the pile shaft with the grippers of the vibratory hammer assembly to drive the pile shaft into the ground until an upper end of the pile shaft is close to or in line with an upper end of the sleeve, gripping the sleeve with the vibratory hammer assembly in addition to gripping the pile shaft, so as to drive the pile shaft and sleeve into the ground as a unit. 24. Werkwijze volgens conclusie 22 of 23, waarbij het grijpen van de paalschacht wordt gedaan middels de specifieke paalschachtgrijpers van het trilbloksamenstel en/of waarbij het grijpen van de paalhuls wordt gedaan middels de specifieke paalhulsgrijpers van het trilbloksamenstel.A method according to claim 22 or 23, wherein the gripping of the pile shaft is done by means of the specific pile shaft grippers of the vibratory hammer assembly and/or wherein the gripping of the pile sleeve is done by means of the specific pile sleeve grippers of the vibratory hammer assembly. 25. Werkwijze volgens een van de conclusies 22-24, waarbij de werkwijze de stappen omvat van: - het voorzien van een reeks voor ten minste één van de paalschacht, paalpunt en paalhuls, - het vaststellen van de bodemgesteldheid op een installatieplaats voor het paalsamenstel, - het selecteren van de respectieve paalschacht, paalpunt en/of paalhuls die overeenkomen met de bodemgesteldheid uit ten minste één van de voorziene reeksen, - het construeren van het paalsamenstel met de geselecteerde paalschacht, paalpunt en/of paalhuls.A method according to any one of claims 22-24, wherein the method comprises the steps of: - providing a sequence for at least one of the pile shaft, pile tip and pile sleeve, - determining the soil conditions at an installation site for the pile assembly - selecting the respective pile shaft, pile tip and/or pile sleeve that correspond to the soil conditions from at least one of the foreseen ranges, - constructing the pile assembly with the selected pile shaft, pile tip and/or pile sleeve.
NL2028011A 2021-04-19 2021-04-19 Pile assembly, gripping member for a vibratory hammer assembly and method for driving a pile assembly into the ground NL2028011B1 (en)

Priority Applications (5)

Application Number Priority Date Filing Date Title
NL2028011A NL2028011B1 (en) 2021-04-19 2021-04-19 Pile assembly, gripping member for a vibratory hammer assembly and method for driving a pile assembly into the ground
PCT/EP2022/060155 WO2022223481A1 (en) 2021-04-19 2022-04-15 Pile assembly, gripping member for a vibratory hammer assembly and method for driving a pile assembly into the ground
EP22723124.8A EP4189173A1 (en) 2021-04-19 2022-04-15 Pile assembly, gripping member for a vibratory hammer assembly and method for driving a pile assembly into the ground
KR1020237039436A KR20240024051A (en) 2021-04-19 2022-04-15 Pile assembly, gripping member for vibrating hammer assembly and method for driving the pile assembly into the ground
US18/555,740 US20240200298A1 (en) 2021-04-19 2022-04-15 Pile assembly, gripping member for a vibratory hammer assembly and method for driving a pile assembly into the ground

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
NL2028011A NL2028011B1 (en) 2021-04-19 2021-04-19 Pile assembly, gripping member for a vibratory hammer assembly and method for driving a pile assembly into the ground

Publications (1)

Publication Number Publication Date
NL2028011B1 true NL2028011B1 (en) 2022-10-31

Family

ID=77519698

Family Applications (1)

Application Number Title Priority Date Filing Date
NL2028011A NL2028011B1 (en) 2021-04-19 2021-04-19 Pile assembly, gripping member for a vibratory hammer assembly and method for driving a pile assembly into the ground

Country Status (5)

Country Link
US (1) US20240200298A1 (en)
EP (1) EP4189173A1 (en)
KR (1) KR20240024051A (en)
NL (1) NL2028011B1 (en)
WO (1) WO2022223481A1 (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US249803A (en) * 1881-11-22 Metallic fence-post
EP0590367A1 (en) * 1992-09-15 1994-04-06 Gebr. Sträb Gmbh + Co. Anchor to be driven into the ground
US20040206020A1 (en) * 2003-02-05 2004-10-21 Stuart Ian Matear Post anchor
GB2426777A (en) * 2005-06-04 2006-12-06 Screwfast Foundations Ltd A pile sleeve
US20110047896A1 (en) * 2009-08-26 2011-03-03 Zenith Innovation, Llc Centering ground spike for supporting a vertical pole
KR102115707B1 (en) 2019-10-04 2020-06-02 유성우 Multiaxial Foundation Pile

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3530947A (en) * 1968-11-27 1970-09-29 Raymond Int Inc Clamping arrangement for double walled shells to be driven into the earth
JPS5894523A (en) * 1981-12-01 1983-06-04 Tadano Tekkosho:Kk Driving of both end-opened hollow pile into ground
US20100257794A1 (en) * 2009-04-10 2010-10-14 Stark N Daniel W Lateral support device
WO2015059579A2 (en) * 2013-10-23 2015-04-30 Anchor Systems (Europe) Ltd. Anchor post
CN106638602A (en) * 2016-12-19 2017-05-10 上海市基础工程集团有限公司 Arc-shaped double-clamp system required by high-frequency vibration of steel pipe pile
CN107237327B (en) * 2017-07-28 2022-09-09 广东水电二局股份有限公司 Sleeve clamp type prefabricated pipe pile vibroflotation clamp

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US249803A (en) * 1881-11-22 Metallic fence-post
EP0590367A1 (en) * 1992-09-15 1994-04-06 Gebr. Sträb Gmbh + Co. Anchor to be driven into the ground
US20040206020A1 (en) * 2003-02-05 2004-10-21 Stuart Ian Matear Post anchor
GB2426777A (en) * 2005-06-04 2006-12-06 Screwfast Foundations Ltd A pile sleeve
US20110047896A1 (en) * 2009-08-26 2011-03-03 Zenith Innovation, Llc Centering ground spike for supporting a vertical pole
KR102115707B1 (en) 2019-10-04 2020-06-02 유성우 Multiaxial Foundation Pile

Also Published As

Publication number Publication date
US20240200298A1 (en) 2024-06-20
EP4189173A1 (en) 2023-06-07
KR20240024051A (en) 2024-02-23
WO2022223481A1 (en) 2022-10-27

Similar Documents

Publication Publication Date Title
US7059263B1 (en) Gravity installed anchor
AU2014246612B2 (en) Helical screw pile and soil displacement device with curved blades
EP2042659A1 (en) Post anchor
US20160024740A1 (en) Flat plate foundation supports
US10378171B2 (en) Method and apparatus for improved installation of caissons
NL2028011B1 (en) Pile assembly, gripping member for a vibratory hammer assembly and method for driving a pile assembly into the ground
Zhao et al. Ultimate lateral bearing capacity of tetrapod jacket foundation in clay
KR20050059183A (en) Internal excavation method through pile, and foundation pile structure
KR20180018241A (en) vibrating Pile driver
AU2017219459B2 (en) Apparatus and method for fastening a composite pole to the ground
CN210737554U (en) Foundation ditch supporting device for highway construction
AU2022100125A4 (en) Lifting device
NL2018390B1 (en) Auger and method for manufacturing a drill pile
JP2017206816A (en) Base member for pile foundation
JP2020033822A (en) Reinforcing-bar cage insertion device and reinforcing-bar cage insertion method
JP5424699B2 (en) Steel pipe pile construction jig, steel pipe pile construction device, and steel pipe pile construction method
NL2009214C2 (en) Method for laying a pipeline.
NL2033553B1 (en) Vibration device and method for inserting into the ground or removing from the ground a foundation element with base frame
SE541862C2 (en) Rig mounted compactor
JP7473425B2 (en) Concrete casting machine
EP3006627B1 (en) Screw pile
JP2018197453A (en) Steel pipe pile placing method, steel pipe pile used for the placing method, and placing apparatus
KR102573225B1 (en) Drilling device for earth drill and the method for ground strengthening using the device
JPH0345167B2 (en)
JP2014114571A (en) Steel pipe pile construction jig and steel pipe pile construction device

Legal Events

Date Code Title Description
RE Seizure

Free format text: SEIZURE, ENFORCEABLE ATTACHEMENT

Effective date: 20240925

QB Registration of licences with regard to patents

Free format text: DETAILS LICENCE OR PLEDGE: LICENCE, NEW LICENCE REGISTRATION

Name of requester: GSF RAIL INFRA GMBH I. GR.

Effective date: 20250226

RF Pledge or confiscation terminated

Free format text: RIGHT OF PLEDGE, REMOVED

Effective date: 20250220