[go: up one dir, main page]

Iabbassen et al., 2022 - Google Patents

Reduce Collision Risk and make Informed Decision with Cost Effective Well Placement Database for Abu Dhabi Exploration Blocks

Iabbassen et al., 2022

Document ID
2759336937484023667
Author
Iabbassen N
El Youssef B
Al Shamsi A
Al Marzouqi M
Publication year
Publication venue
Abu Dhabi International Petroleum Exhibition and Conference

External Links

Snippet

The well-collision-avoidance management principles in this paper are a summit of the work and guidelines of industry specialists from both oil operating companies and directional drilling service providers. This well-known subject in the drilling domain, the objective is to …
Continue reading at onepetro.org (other versions)

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING; COUNTING
    • G06FELECTRICAL DIGITAL DATA PROCESSING
    • G06F17/00Digital computing or data processing equipment or methods, specially adapted for specific functions
    • G06F17/20Handling natural language data
    • G06F17/21Text processing
    • G06F17/24Editing, e.g. insert/delete
    • GPHYSICS
    • G06COMPUTING; CALCULATING; COUNTING
    • G06FELECTRICAL DIGITAL DATA PROCESSING
    • G06F17/00Digital computing or data processing equipment or methods, specially adapted for specific functions
    • G06F17/20Handling natural language data
    • G06F17/21Text processing
    • G06F17/22Manipulating or registering by use of codes, e.g. in sequence of text characters
    • GPHYSICS
    • G06COMPUTING; CALCULATING; COUNTING
    • G06FELECTRICAL DIGITAL DATA PROCESSING
    • G06F17/00Digital computing or data processing equipment or methods, specially adapted for specific functions
    • G06F17/30Information retrieval; Database structures therefor; File system structures therefor
    • G06F17/30861Retrieval from the Internet, e.g. browsers
    • GPHYSICS
    • G06COMPUTING; CALCULATING; COUNTING
    • G06FELECTRICAL DIGITAL DATA PROCESSING
    • G06F17/00Digital computing or data processing equipment or methods, specially adapted for specific functions
    • G06F17/30Information retrieval; Database structures therefor; File system structures therefor
    • G06F17/30286Information retrieval; Database structures therefor; File system structures therefor in structured data stores
    • GPHYSICS
    • G06COMPUTING; CALCULATING; COUNTING
    • G06QDATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
    • G06Q10/063Operations research or analysis
    • GPHYSICS
    • G06COMPUTING; CALCULATING; COUNTING
    • G06QDATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation, e.g. computer aided management of electronic mail or groupware; Time management, e.g. calendars, reminders, meetings or time accounting
    • GPHYSICS
    • G06COMPUTING; CALCULATING; COUNTING
    • G06FELECTRICAL DIGITAL DATA PROCESSING
    • G06F11/00Error detection; Error correction; Monitoring
    • GPHYSICS
    • G06COMPUTING; CALCULATING; COUNTING
    • G06QDATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for a specific business sector, e.g. utilities or tourism
    • G06Q50/08Construction

Similar Documents

Publication Publication Date Title
Grindrod et al. OWSG standard survey tool error model set for improved quality and implementation in directional survey management
de Wardt et al. Well bore collision avoidance and interceptions-state of the art
Flores et al. Relief well planning
Kayely et al. A Revolutionary Digital Twin of Autonomous Hydraulic Simulation on Largest and Most Complex Pipeline Network in Indonesia (Case Studies in Rokan Block)
Dorey et al. Offshore Complex Decommissioning Utilizing Non-Access Magnetic Ranging Methods for Subsurface Intervention
CA2841283C (en) Data initialization for a subterranean operation
Iabbassen et al. Reduce Collision Risk and make Informed Decision with Cost Effective Well Placement Database for Abu Dhabi Exploration Blocks
Hummes et al. Executing the Digital Well Plan-Enhancing Process Automation
Cayeux et al. A new paradigm for automatic well path generation using multidisciplinary constraints
Cao et al. Digital transformation strategy enables automated real-time torque-and-drag modeling
Poedjono et al. Anti-collision risk management for real-world well placement
Sawaryn et al. Some Technical and Economic Consequences of Directional Drilling and Surveying Progress and Success
Houbiers et al. Practical Implementation of Combining Wellbore Survey Tools for Optimized Wellbore Position Accuracy
Dorey et al. Advancements in techniques for complex plug and abandonment using survey management and magnetic ranging methods
Naschenveng et al. Definitive Survey Methodology–Update to an Old Concept for Higher Reliability
Tymons et al. Enabling Collaboration and Empowering Data-Driven Decisions for Well Interventions Through the Adoption of a Fully Integrated, Cloud-Based Data Delivery Platform
Girling et al. Optimisation of well placement and improved well planning within a collaborative 3D environment employing real-time data: a case study from the Visund Field, Norway
Ness et al. Leveraging Flexible Digital Approach to Enhance Wellbore Survey Data Management and Collision Avoidance in Offshore Fields, Abu Dhabi
Javid et al. Smart reservoir management with real-time monitoring in an offshore carbonate digital oil field under miscible gas injection
Lim et al. Methods to establish GIS for planning cost-effective geotechnical site investigations
Márquez et al. Integrated Operation Performance and Optimization Analysis Based on Technical Limit and Invisible Lost Time
Wang et al. Study on Digital Twin Technology to Drilling Performance Improvement and Risk Reduction
Elrefai et al. Inhouse design and implementation of well integrity database management system
Kolosov et al. Transforming Real Time Intelligence: A Case Study on Multidisciplinary Integration Through Collaborative Planning Environment in Onshore Abu Dhabi Fields
Chatar et al. Anti-collision considerations for arctic and other high latitude locations