Langvik et al., 2012 - Google Patents
Optimization of oil production-applied to the marlim fieldLangvik et al., 2012
View PDF- Document ID
- 16981749472907825972
- Author
- Langvik A
- Dzubur L
- Publication year
External Links
Snippet
This thesis considers short-term petroleum production planning at the Marlim field operated by the Brazilian energy company, Petrobras. The production asset to be optimized is an Floating Production and Storage Operating unit, including several oil producing wells and …
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
- G06Q10/063—Operations research or analysis
- G06Q10/0639—Performance analysis
- G06Q10/06393—Score-carding, benchmarking or key performance indicator [KPI] analysis
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06F—ELECTRICAL DIGITAL DATA PROCESSING
- G06F17/00—Digital computing or data processing equipment or methods, specially adapted for specific functions
- G06F17/50—Computer-aided design
- G06F17/5009—Computer-aided design using simulation
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/16—Enhanced recovery methods for obtaining hydrocarbons
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06F—ELECTRICAL DIGITAL DATA PROCESSING
- G06F17/00—Digital computing or data processing equipment or methods, specially adapted for specific functions
- G06F17/30—Information retrieval; Database structures therefor; File system structures therefor
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/04—Forecasting or optimisation, e.g. linear programming, "travelling salesman problem" or "cutting stock problem"
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US20130246032A1 (en) | Optimal Design System for Development Planning of Hydrocarbon Resources | |
| Wang | Development and applications of production optimization techniques for petroleum fields | |
| EP2465073A1 (en) | Optimizing well management policy | |
| Rotondi et al. | The benefits of integrated asset modeling: Lesson learned from field cases | |
| González et al. | Decision support method for early-phase design of offshore hydrocarbon fields using model-based optimization | |
| Kosmala et al. | Coupling of a surface network with reservoir simulation | |
| Barragán-Hernández et al. | A strategy for simulation and optimization of gas and oil production | |
| Hohendorff Filho et al. | Effect of reservoir and production system integration on field production strategy selection | |
| Darche et al. | Integrated asset modeling of a deep-offshore subsea development using 2 complementary reservoir-surface coupling workflows | |
| Khan et al. | Integrated Field Management System for LNG Assets: Optimising Recovery and Managing Deliverability under Complex Constraints | |
| Langvik et al. | Optimization of oil production-applied to the marlim field | |
| Nazarov et al. | Integrated Asset Modeling in Mature Offshore Fields: Challenges and Successes | |
| Hoda et al. | Successful Implementations of Integrated Asset Modeling | |
| Binder | Production optimization in a cluster of gas-lift wells | |
| Gonzalez | Methodologies to determine cost-effective development strategies for offshore fields during early-phase studies using proxy models and optimization | |
| Vazquez-Roman et al. | A new approach for continuous gas lift simulation and optimization | |
| Cotrim et al. | Production optimization considering interaction between reservoirs and constrained surface facilities | |
| von Hohendorff Filho et al. | Evaluation of reservoir and production system integration in production strategy selection | |
| Foss | Real-time production optimization and reservoir management at the IO center | |
| Abbas et al. | An Efficient Method to Control Oilfield Wells Through Advanced Field Management Ensemble Based Optimization Capabilities | |
| Vinogradov et al. | Adaptive approach to integrated modeling of development and exploitation of group of gas-condensate fields with a single production gathering and processing system | |
| Storvold | Optimization of investment decisions and production planning in aging offshore petroleum fields | |
| Campozana et al. | Optimization of surface network and platform location using a next generation reservoir simulator coupled with an integrated asset optimizer—an application to an offshore deep water oil field in Brazil | |
| von Hohendorff Filho et al. | Influence of well management in the development of multiple reservoir sharing production facilities | |
| Farooq et al. | Improving the Value: A Case Study of Integrated Asset Modelling of a Giant Contaminated Gas Field |