Shr et al., 2006 - Google Patents
A heuristic load balancing scheduling method for dedicated machine constraintShr et al., 2006
- Document ID
- 15238925547663323708
- Author
- Shr A
- Liu A
- Chen P
- Publication year
- Publication venue
- International Conference on Industrial, Engineering and Other Applications of Applied Intelligent Systems
External Links
Snippet
The dedicated machine constraint for the photolithography process in semiconductor manufacturing is one of the new challenges introduced in photolithography machinery due to natural bias. With this constraint, the wafers passing through each photolithography …
- 235000012431 wafers 0 abstract description 68
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
- G06Q10/063—Operations research or analysis
- G06Q10/0631—Resource planning, allocation or scheduling for a business operation
- G06Q10/06311—Scheduling, planning or task assignment for a person or group
- G06Q10/063116—Schedule adjustment for a person or group
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06F—ELECTRICAL DIGITAL DATA PROCESSING
- G06F9/00—Arrangements for programme control, e.g. control unit
- G06F9/06—Arrangements for programme control, e.g. control unit using stored programme, i.e. using internal store of processing equipment to receive and retain programme
- G06F9/46—Multiprogramming arrangements
- G06F9/48—Programme initiating; Programme switching, e.g. by interrupt
- G06F9/4806—Task transfer initiation or dispatching
- G06F9/4843—Task transfer initiation or dispatching by program, e.g. task dispatcher, supervisor, operating system
- G06F9/4881—Scheduling strategies for dispatcher, e.g. round robin, multi-level priority queues
- G06F9/4887—Scheduling strategies for dispatcher, e.g. round robin, multi-level priority queues involving deadlines, e.g. rate based, periodic
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
- G06Q10/063—Operations research or analysis
- G06Q10/0633—Workflow analysis
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06F—ELECTRICAL DIGITAL DATA PROCESSING
- G06F9/00—Arrangements for programme control, e.g. control unit
- G06F9/06—Arrangements for programme control, e.g. control unit using stored programme, i.e. using internal store of processing equipment to receive and retain programme
- G06F9/46—Multiprogramming arrangements
- G06F9/50—Allocation of resources, e.g. of the central processing unit [CPU]
- G06F9/5005—Allocation of resources, e.g. of the central processing unit [CPU] to service a request
- G06F9/5027—Allocation of resources, e.g. of the central processing unit [CPU] to service a request the resource being a machine, e.g. CPUs, Servers, Terminals
- G06F9/5038—Allocation of resources, e.g. of the central processing unit [CPU] to service a request the resource being a machine, e.g. CPUs, Servers, Terminals considering the execution order of a plurality of tasks, e.g. taking priority or time dependency constraints into consideration
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B19/00—Programme-control systems
- G05B19/02—Programme-control systems electric
- G05B19/418—Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS], computer integrated manufacturing [CIM]
- G05B19/41865—Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS], computer integrated manufacturing [CIM] characterised by job scheduling, process planning, material flow
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B2219/00—Program-control systems
- G05B2219/30—Nc systems
- G05B2219/32—Operator till task planning
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/04—Forecasting or optimisation, e.g. linear programming, "travelling salesman problem" or "cutting stock problem"
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B2219/00—Program-control systems
- G05B2219/30—Nc systems
- G05B2219/45—Nc applications
- G05B2219/45031—Manufacturing semiconductor wafers
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| Zhou et al. | Real-time scheduling of cloud manufacturing services based on dynamic data-driven simulation | |
| Johri | Practical issues in scheduling and dispatching in semiconductor wafer fabrication | |
| US7668614B2 (en) | Optimization-based process scheduling method and system | |
| Leachman et al. | SLIM: Short cycle time and low inventory in manufacturing at Samsung Electronics | |
| US20080195241A1 (en) | Method and system for wafer lot order | |
| Chiang et al. | Modeling, scheduling, and performance evaluation for wafer fabrication: a queueing colored Petri-net and GA-based approach | |
| Sadeghi et al. | A multi-method simulation modelling for semiconductor manufacturing | |
| Yoon et al. | A multiagent-based decision-making system for semiconductor wafer fabrication with hard temporal constraints | |
| Fu et al. | Batch production scheduling for semiconductor back-end operations | |
| Chern et al. | Family-based scheduling rules of a sequence-dependent wafer fabrication system | |
| Shr et al. | A heuristic load balancing scheduling method for dedicated machine constraint | |
| Shr et al. | Load Balancing Among Photolithography Machines in the Semiconductor Manufacturing System. | |
| Shr et al. | A load balancing method for dedicated photolithography machine constraint | |
| Shr et al. | A load balancing scheduling approach for dedicated machine constraint | |
| Gupta et al. | Single machine scheduling with multiple objectives in semiconductor manufacturing | |
| Shr et al. | A heuristic scheduling approach to the dedicated machine constraint | |
| CN1720488B (en) | Method and apparatus for determining on-station item distribution in a station system | |
| Qiao et al. | Scheduling of semiconductor manufacturing systems using Petri nets | |
| Zhang et al. | Time bound control in a stochastic dynamic wafer fab | |
| Tao et al. | Petri net and GASA based approach for dynamic JSP | |
| Shr et al. | Load Balancing among Photolithography Machines in Semiconductor Manufacturing | |
| DeJong et al. | Simulating the transport and scheduling of priority lots in semiconductor factories | |
| Shr et al. | Scheduling for Dedicated Machine Constraint | |
| Huang et al. | Modeling, scheduling, and prediction for wafer fabrication: queueing colored Petri-net and GA based approach | |
| Shr et al. | A Solution for Dedicated Machine Constraint in Semiconductor Manufacturing |