Linn et al., 1993 - Google Patents
A simulation analysis of sequencing rules for ASRS in a pull-based assembly facilityLinn et al., 1993
- Document ID
- 15141839582961247242
- Author
- Linn R
- Xie X
- Publication year
- Publication venue
- International Journal of Production Research
External Links
Snippet
Just-in-time (JIT) systems operate on a pull-based production control. The material needed is expected to be at its production site when and only when it is needed. When an automated storage retrieval system (ASRS) is used as a valve warehouse to support JIT …
- 238000004458 analytical method 0 title abstract description 14
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
- G06Q10/063—Operations research or analysis
- G06Q10/0631—Resource planning, allocation or scheduling for a business operation
- G06Q10/06315—Needs-based resource requirements planning or analysis
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/08—Logistics, e.g. warehousing, loading, distribution or shipping; Inventory or stock management, e.g. order filling, procurement or balancing against orders
- G06Q10/087—Inventory or stock management, e.g. order filling, procurement, balancing against orders
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B19/00—Programme-control systems
- G05B19/02—Programme-control systems electric
- G05B19/418—Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS], computer integrated manufacturing [CIM]
- G05B19/41865—Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS], computer integrated manufacturing [CIM] characterised by job scheduling, process planning, material flow
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06F—ELECTRICAL DIGITAL DATA PROCESSING
- G06F9/00—Arrangements for programme control, e.g. control unit
- G06F9/06—Arrangements for programme control, e.g. control unit using stored programme, i.e. using internal store of processing equipment to receive and retain programme
- G06F9/46—Multiprogramming arrangements
- G06F9/48—Programme initiating; Programme switching, e.g. by interrupt
- G06F9/4806—Task transfer initiation or dispatching
- G06F9/4843—Task transfer initiation or dispatching by program, e.g. task dispatcher, supervisor, operating system
- G06F9/4881—Scheduling strategies for dispatcher, e.g. round robin, multi-level priority queues
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06F—ELECTRICAL DIGITAL DATA PROCESSING
- G06F9/00—Arrangements for programme control, e.g. control unit
- G06F9/06—Arrangements for programme control, e.g. control unit using stored programme, i.e. using internal store of processing equipment to receive and retain programme
- G06F9/46—Multiprogramming arrangements
- G06F9/50—Allocation of resources, e.g. of the central processing unit [CPU]
- G06F9/5083—Techniques for rebalancing the load in a distributed system
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US12084279B2 (en) | Control system for storage and retrieval systems | |
| Van Den Berg | A literature survey on planning and control of warehousing systems | |
| US7197469B2 (en) | Method for allocating limited component supply and capacity to optimize production scheduling | |
| Bozer et al. | Design and performance models for end-of-aisle order picking systems | |
| US6463346B1 (en) | Workflow-scheduling optimization driven by target completion time | |
| Saad et al. | Performance evaluation of contract net-based heterarchical scheduling for flexible manufacturing systems | |
| Linn et al. | A simulation analysis of sequencing rules for ASRS in a pull-based assembly facility | |
| Bobrowski et al. | Work release strategies in a dual resource constrained job shop | |
| CN110390498B (en) | Order distribution method and device | |
| Babiceanu et al. | Real-time holonic scheduling of material handling operations in a dynamic manufacturing environment | |
| Chan | Effects of dispatching and routeing decisions on the performance of a flexible manufacturing system | |
| Yang et al. | Comparison of make-to-order job shops with different machine layouts and production control systems | |
| Veeravalli et al. | Design and analysis of optimal material distribution policies in flexible manufacturing systems using a single AGV | |
| Chincholkar et al. | Stochastic coloured Petri nets for modelling and evaluation, and heuristic rule base for scheduling of FMS | |
| JP2003502877A (en) | Pre-positioning of robot in wafer processing system | |
| Azadivar | A simulation optimization approach to optimum storage and retrieval policies in an automated warehousing system | |
| Bocewicz et al. | TOWARDS THE LEVELING OF MULTI-PRODUCT BATCH PRODUCTION FLOWS. A MULTIMODAL NETWORKS PERSPECTIVE. | |
| CN113191704A (en) | Goods delivery control method and device and computer readable storage medium | |
| JPH0561507A (en) | Jyobushiyo Production Control System | |
| US7409351B2 (en) | Method and system for splitting an order in a flexible order transaction system | |
| Piplani et al. | Launching and dispatching strategies for multi-criteria control of closed manufacturing systems with flexible routeing capability | |
| Kong et al. | Methods for design and management of a fast-pick area in a warehouse | |
| Jeroen et al. | A literature survey on planning and control of warehousing systems | |
| Vargas et al. | Managing uncertainty in multilevel manufacturing systems | |
| Newman et al. | Examining the use of dedicated and general purpose pallets in a dedicated flexible manufacturing system |