Ekkawong et al., 2015 - Google Patents
Automated Optimization of Interdependent Artificial Lifting Fields Using Integrated Response Surface Model and Hybrid Heuristic-Gradient Algorithm: A Field Case …Ekkawong et al., 2015
- Document ID
- 10918010967345573628
- Author
- Ekkawong P
- Kritsadativud P
- Lerlertpakdee P
- Publication year
- Publication venue
- SPE Asia Pacific Oil and Gas Conference and Exhibition
External Links
Snippet
The generic characteristic of producing fields in Gulf of Thailand (GOT) is that oil wells are also developed on the same facilities as gas wells when possible. Different efforts are taken to optimize both oil and gas wells together. Gas-lift is one of the examples of artificial lift that …
- 238000005457 optimization 0 title description 67
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06F—ELECTRICAL DIGITAL DATA PROCESSING
- G06F17/00—Digital computing or data processing equipment or methods, specially adapted for specific functions
- G06F17/50—Computer-aided design
- G06F17/5009—Computer-aided design using simulation
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06F—ELECTRICAL DIGITAL DATA PROCESSING
- G06F17/00—Digital computing or data processing equipment or methods, specially adapted for specific functions
- G06F17/50—Computer-aided design
- G06F17/5086—Mechanical design, e.g. parametric or variational design
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06F—ELECTRICAL DIGITAL DATA PROCESSING
- G06F17/00—Digital computing or data processing equipment or methods, specially adapted for specific functions
- G06F17/30—Information retrieval; Database structures therefor; File system structures therefor
- G06F17/30861—Retrieval from the Internet, e.g. browsers
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
- G06Q10/063—Operations research or analysis
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06F—ELECTRICAL DIGITAL DATA PROCESSING
- G06F17/00—Digital computing or data processing equipment or methods, specially adapted for specific functions
- G06F17/30—Information retrieval; Database structures therefor; File system structures therefor
- G06F17/30286—Information retrieval; Database structures therefor; File system structures therefor in structured data stores
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/16—Enhanced recovery methods for obtaining hydrocarbons
- E21B43/166—Injecting a gaseous medium; Injecting a gaseous medium and a liquid medium
- E21B43/168—Injecting a gaseous medium
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06F—ELECTRICAL DIGITAL DATA PROCESSING
- G06F17/00—Digital computing or data processing equipment or methods, specially adapted for specific functions
- G06F17/20—Handling natural language data
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/04—Forecasting or optimisation, e.g. linear programming, "travelling salesman problem" or "cutting stock problem"
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/14—Obtaining from a multiple-zone well
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06F—ELECTRICAL DIGITAL DATA PROCESSING
- G06F2217/00—Indexing scheme relating to computer aided design [CAD]
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| Cao et al. | Development of a fully coupled two-phase flow based capacitance resistance model CRM | |
| Awotunde | On the joint optimization of well placement and control | |
| Zou et al. | Integrated framework for constrained optimization of horizontal/deviated well placement and control for geological CO2 storage | |
| Aliyev et al. | Multilevel field-development optimization using a sequence of upscaled models | |
| Gaspar et al. | UNISIM-IM: Benchmark case proposal for oil reservoir management decision-making | |
| Kosmala et al. | Coupling of a surface network with reservoir simulation | |
| Pinto et al. | Short-term and long-term optimizations for reservoir management with intelligent wells | |
| Sampaio et al. | Optimization of Proactive Control Valves of Producer and Injector Intelligent Wells under Economic Uncertainty | |
| Darche et al. | Integrated asset modeling of a deep-offshore subsea development using 2 complementary reservoir-surface coupling workflows | |
| Zhou et al. | Openness in Reservoir Simulation: Empowering Flexible Field Management | |
| Prakash et al. | Data-driven steam optimization for SAGD | |
| Zou et al. | Integrated framework for optimization of horizontal/deviated well placement and control for geological CO2 storage | |
| Vasper et al. | Efficient optimization strategies for developing intelligent well business cases | |
| Kumar et al. | Field surveillance and ai based steam allocation optimization workflow for mature brownfield steam floods | |
| Nagao et al. | Distributed Agent Optimization for Large-Scale Network Models | |
| Ekkawong et al. | Automated Optimization of Interdependent Artificial Lifting Fields Using Integrated Response Surface Model and Hybrid Heuristic-Gradient Algorithm: A Field Case Study | |
| Ekkawong et al. | Innovative and Automated Workflow for Fast Production Optimization and Forecast in Gulf of Thailand Gas Fields Using Linear Programing Optimization | |
| Stevenson et al. | Lessons Learned from Building a Large Integrated Production Model for Offshore Assets in Nigeria | |
| Kritsadativud et al. | Fast Production Optimization with Decline Curve Analysis Under Facility Constraints: A Field Case Study | |
| Kumar et al. | Leveraging integrated production modeling and digital platforms to maximize liquid yield and reduce opex from liquid-rich marcellus reservoirs–a field study | |
| BuKhamseen et al. | Validating hydraulic fracturing properties in reservoir simulation using artificial neural networks | |
| Sifuentes et al. | Samarang Integrated Operations (IO): Integrated Asset Modeling-An Innovative Approach For Long Term Production Planning Focused On Enhance Oil Recovery | |
| Park et al. | Production-system optimization of gas fields using hybrid fuzzy/genetic approach | |
| Siew Hiang et al. | Adoption of Integrated Asset Modeling Approach to Kick-Start the Corporate Digital Transformation Strategy | |
| Tilke et al. | High-speed field development planning in the presence of uncertainty and risk through the use of constrained numerical optimization and analytical simulation |