Marbun et al., 2023 - Google Patents
Lesson learned from the assessment of planned converted CO2 injection well integrity in Indonesia–CCUS projectMarbun et al., 2023
View HTML- Document ID
- 9214643597675486726
- Author
- Marbun B
- Sinaga S
- Purbantanu B
- Santoso D
- Kadir W
- Sule R
- Prasetyo D
- Prabowo H
- Susilo D
- Firmansyah F
- Palilu J
- Saprudin W
- Andhika B
- Publication year
- Publication venue
- Heliyon
External Links
Snippet
The risk of CO 2 leakage from carbon capture, utilization, and storage (CCUS) wells and geological storage sites must be properly assessed before the implementation of CO 2 injection. According to ISO 27914 and ISO/FDIS 27916, the design and construction of an …
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B47/00—Survey of boreholes or wells
- E21B47/10—Locating fluid leaks, intrusions or movements
- E21B47/1015—Locating fluid leaks, intrusions or movements using tracers: using radioactivity
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/25—Methods for stimulating production
- E21B43/26—Methods for stimulating production by forming crevices or fractures
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B33/00—Sealing or packing boreholes or wells
- E21B33/10—Sealing or packing boreholes or wells in the borehole
- E21B33/12—Packers; Plugs
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B47/00—Survey of boreholes or wells
- E21B47/10—Locating fluid leaks, intrusions or movements
- E21B47/102—Locating fluid leaks, intrusions or movements using electrical indications: using light radiations
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B33/00—Sealing or packing boreholes or wells
- E21B33/02—Surface sealing or packing
- E21B33/03—Well heads; Setting-up thereof
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B33/00—Sealing or packing boreholes or wells
- E21B33/10—Sealing or packing boreholes or wells in the borehole
- E21B33/13—Methods or devices for cementing, for plugging holes, crevices, or the like
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/14—Obtaining from a multiple-zone well
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B49/00—Testing the nature of borehole walls; Formation testing; Methods or apparatus for obtaining samples of soil or well fluids, specially adapted to earth drilling or wells
- E21B49/08—Obtaining fluid samples or testing fluids, in boreholes or wells
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/16—Enhanced recovery methods for obtaining hydrocarbons
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/12—Methods or apparatus for controlling the flow of the obtained fluid to or in wells
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B47/00—Survey of boreholes or wells
- E21B47/12—Means for transmitting measuring-signals or control signals from the well to the surface or from the surface to the well, e.g. for logging while drilling
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/02—Subsoil filtering
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B17/00—Drilling rods or pipes; Flexible drill strings; Kellies; Drill collars; Sucker rods; Cables; Casings; Tubings
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B41/00—Equipment or details not covered by groups E21B15/00 - E21B40/00
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| Bai et al. | A review on well integrity issues for CO2 geological storage and enhanced gas recovery | |
| Bai et al. | Well completion and integrity evaluation for CO2 injection wells | |
| Kang et al. | Effective permeabilities of abandoned oil and gas wells: Analysis of data from Pennsylvania | |
| Marbun et al. | Lesson learned from the assessment of planned converted CO2 injection well integrity in Indonesia–CCUS project | |
| Laumb et al. | Wellbore corrosion and failure assessment for CO2 EOR and storage: Two case studies in the Weyburn field | |
| Huerta et al. | Utilizing sustained casing pressure analog to provide parameters to study CO2 leakage rates along a wellbore | |
| US20120109611A1 (en) | System and Method for Performing Wellsite Containment Operations | |
| Marbun et al. | Well integrity evaluation prior to converting a conventional gas well to CO2 injector well–Gundih CCS pilot project in Indonesia (phase 1) | |
| Johns et al. | Well integrity analysis in Gulf of Mexico wells using passive ultrasonic leak detection method | |
| Patil et al. | Safeguarding CO2 storage by restoring well integrity using leakage rate modeling LRM along wellbore in depleted gas fields offshore Sarawak | |
| Wood | Well integrity for underground gas storage relating to natural gas, carbon dioxide, and hydrogen | |
| Tao et al. | Estimating CO2 fluxes along leaky wellbores | |
| Gardner et al. | Barrier verification during plug and abandonment using spectral noise logging technology, reference cells yard test | |
| Alsubaih et al. | A Comprehensive review of well integrity challenges and digital twin applications across conventional, unconventional, and storage wells | |
| Valstar et al. | Importance of Well Integrity Measurements Throughout the CCS Project Lifecycle | |
| Aditama et al. | Evaluation of A Passive Ultrasonic Log Application for Casing Integrity Assessment: A Case Study in A South Oman Field | |
| Guo et al. | Statistical analysis of CO2 exposed wells to predict long term leakage through the development of an integrated neural-genetic algorithm | |
| Elyas et al. | Well Integrity Catastrophe Avoided Through Advanced Well Integrity and Reservoir Monitoring Analysis, a Case Study | |
| On et al. | Risk Analysis for Wells in an Active CO2-Enhanced Oil Recovery Field in Farnsworth Unit, Anadarko Basin, Texas | |
| Nowamooz et al. | Evaluation of the potential for gas leakage along wellbores in the St. Lawrence Lowlands basin, Quebec, Canada | |
| Checkai | Estimating permeability distribution of leakage pathways along existing wellbores | |
| Patil et al. | Subsea Re-abandonment strategies for high-risk wells to minimize leakage risk in a depleted field for CO2 storage | |
| Locke et al. | Verification Well# 1: How a deep monitoring well was used and adapted to meet the evolving monitoring needs and challenges at the Illinois Basin–Decatur Project | |
| Tao et al. | Frequency distributions of effective permeability and gas flux in leaky wellbores | |
| Snasiri et al. | Well Integrity Diagnosis in an Aging Onshore Field Using Modern Diagnostic Tools to Remediate Risk & Inform Completion Strategy |