[go: up one dir, main page]

Carpenter, 2022 - Google Patents

Barge LNG Offers Benefits in Deepwater and Onshore Developments

Carpenter, 2022

Document ID
8379973675299374784
Author
Carpenter C
Publication year
Publication venue
Journal of Petroleum Technology

External Links

Snippet

This article, written by JPT Technology Editor Chris Carpenter, contains highlights of paper OTC 30871,“Could Barge LNG Replace FLNG?” by Edward A. Hernandez, Timothy D. Highfield, and Thomas G. Forbes, io consulting, et al. The paper has not been peer …
Continue reading at onepetro.org (other versions)

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
    • B63B21/00Tying-up; Shifting, towing, or pushing equipment; Anchoring
    • B63B21/50Anchoring arrangements or methods for special vessels, e.g. for floating drilling platforms or dredgers
    • B63B21/507Anchoring arrangements or methods for special vessels, e.g. for floating drilling platforms or dredgers with mooring turrets
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
    • B63B35/00Vessels or like floating structures adapted for special purposes
    • B63B35/44Floating buildings, stores, drilling platforms, or workshops, e.g. carrying water-oil separating devices
    • B63B35/4413Floating drilling platforms, e.g. carrying water-oil separating devices
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
    • B63B9/00Methods of designing, building, maintaining, converting, refitting, repairing, or determining properties of vessels, not otherwise provided for
    • B63B9/06Methods of building hulls
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
    • B63B27/00Loading or unloading cargo or passengers
    • B63B27/20Loading or unloading cargo or passengers with continuous action
    • B63B27/24Loading or unloading fluids
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
    • B63B22/00Buoys
    • B63B22/02Buoys specially adapted for mooring a vessel
    • B63B2022/028Buoys specially adapted for mooring a vessel submerged, e.g. fitting into ship-borne counterpart with or without rotatable turret, or being releasably connected to moored vessel

Similar Documents

Publication Publication Date Title
KR101797199B1 (en) Systems and methods for floating dockside liquefaction of natural gas
CN103697326A (en) Transporting and managing liquefied natural gas
Duggal et al. The Floating Production, Storage and Offloading system–past, present and future
Carpenter Barge LNG Offers Benefits in Deepwater and Onshore Developments
Vernes et al. Aasta Hansteen Hull-Topsides Dry Transport and Dual Barge Mating Operations
Ronalds et al. FPSO trends
CN217422917U (en) Floating offshore CO 2 Liquefaction storage and transportation system
Boekhorst et al. FLNG: Applying Advanced Technology to bring more natural gas to market
Van Wijngaarden et al. Upgrading and conversion opportunities for floating offshore units
Hernandez et al. Could Barge LNG Replace FLNG?
Poldervaart et al. Offshore LNG transfer: a worldwide review of offloading availability
Hernandez et al. BLNG: The Future of FLNG?
AU2012207058A1 (en) Sheltered LNG production facility
Hoog et al. LNG transfer in harsh environments-introduction of a new concept
Mastrangelo One company's experience on ship-based production system
Sarv Large-scale CO2 transportation and deep ocean sequestration
Witthohn Offshore work
de Ruyter et al. The Sanha LPG FPSO
Wodehouse et al. The Development of an FPSO for the Deepwater Gulf of Mexico
Henriques et al. From P-34 to P-50: FPSO Evolution
KR20130128872A (en) A floating facility for processing gas
Terpstra et al. Offshore dry-docking of FPSOs; a response to industry needs
Yussoff PFLNG1-Completing the LNG Value Chain Through Technology
van Wijngaarden OPPORTUNITIES FOR OFFSHORE VESSELS UPGRADING AND CONVERSION
Pike Economic benefits of FPSO construction and deployment in the Gulf of Mexico