[go: up one dir, main page]

Zimmermann et al., 2020 - Google Patents

Using an Existing Tunnel to Dewater the St. Peter Sandstone

Zimmermann et al., 2020

Document ID
6239258602130649982
Author
Zimmermann J
Pullen T
Publication year
Publication venue
Geo-Congress 2020

External Links

Snippet

Many of the stormwater tunnels in the Twin Cities area are within the weakly cemented St. Peter sandstone. Although its friable nature makes it conducive for tunneling, the presence of water flow induced piping features can result in unpredictable groundwater behavior and …
Continue reading at ascelibrary.org (other versions)

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B33/00Sealing or packing boreholes or wells
    • E21B33/10Sealing or packing boreholes or wells in the borehole
    • E21B33/13Methods or devices for cementing, for plugging holes, crevices, or the like
    • E21B33/14Methods or devices for cementing, for plugging holes, crevices, or the like for cementing casings into boreholes
    • E21B33/143Methods or devices for cementing, for plugging holes, crevices, or the like for cementing casings into boreholes for underwater installations
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/02Subsoil filtering
    • E21B43/04Gravelling of wells
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B7/00Special methods or apparatus for drilling
    • E21B7/04Directional drilling
    • E21B7/046Directional drilling horizontal drilling
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B7/00Special methods or apparatus for drilling
    • E21B7/20Driving or forcing casings or pipes into boreholes, e.g. sinking; Simultaneously drilling and casing boreholes
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B47/00Survey of boreholes or wells
    • E21B47/10Locating fluid leaks, intrusions or movements
    • E21B47/1015Locating fluid leaks, intrusions or movements using tracers: using radioactivity
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/045Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B21/00Methods or apparatus for flushing boreholes, e.g. by use of exhaust air from motor
    • E21B21/12Methods or apparatus for flushing boreholes, e.g. by use of exhaust air from motor using drilling pipes with plural fluid passages, e.g. closed circulation systems
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F15/00Methods or devices for placing filling-up materials in underground workings
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21CMINING OR QUARRYING
    • E21C41/00Methods of underground or surface mining; Lay-outs therefor
    • E21C41/16Methods of underground mining; Layouts therefor
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING

Similar Documents

Publication Publication Date Title
Cheng et al. Recent massive incidents for subway construction in soft alluvial deposits of Taiwan: a review
CN101672197A (en) Processing method for high-pressure water-enriched filling karst cavity
Wei et al. Seepage in Water‐Rich Loess Tunnel Excavating Process and Grouting Control Effect
Peng et al. Water inrush-induced failure during deep excavation for a metro station in karst regions in Shenzhen, China: Cause diagnosis and post-accident restoration
Warren et al. Comparison of earth pressure balance and slurry tunnel boring machines used for tunnelling in chalk
Wang Tunnelling and technological progress in tunnelling in China
Davis et al. Groundwater control and stability in an excavation in Magnesian Limestone near Sunderland, NE England
Sopko et al. Investigative and remedial methods for breach in a frozen shaft
CN115324592B (en) Dynamic monitoring and dynamic response control method of aquifer for well construction
Edmonds Induced subsurface movements associated with the presence of natural and artificial underground openings in areas underlain by Cretaceous Chalk
Zimmermann et al. Using an Existing Tunnel to Dewater the St. Peter Sandstone
Brawner Groundwater and coal mining
Boon et al. Protection of buildings and structures within the influence of tunnelling works
Cashman et al. Groundwater control for tunnelling projects
Soe et al. Groundwater control measures implemented in Singapore's deep tunnel sewerage system phase 2 (DTSS2) project
Farshbar et al. Sealing of huge water ingress in headrace tunnel of Uma Oya Project, Sri Lanka
Bar et al. Ground Characterization and Design of a Drainage Gallery Tunnel Network for a Large Open Pit Mine in a High Rainfall Environment
Chella et al. Selection of a Suitable and Cost Effective Method for Dewatering Deep Orebodies (below 1040mL) at Konkola Mine-Zambia
Cashman et al. Methods for Exclusion of Groundwater
Chen et al. TBM Construction in Special Stratum
Sullivan et al. Design and Construction of the South Hartford CSO Tunnel
Cashman et al. Groundwater Problems for Excavations in Rock
Tian et al. Influence of underground engineering on surrounding water environment in sedimentary rock distribution area and its treatment principle
Shifflett et al. Rough River Dam Safety Modification Project Evolution
Kalager Pre-Grouting in a TBM Bored Tunnel-Experience From the Follo Line Railway Tunnel