Ezeokonkwo et al., 2014 - Google Patents
Review of Trenchless Technologies' Successes and their Dependence on Precise Geotechnical InvestigationEzeokonkwo et al., 2014
View PDF- Document ID
- 4061797236518198466
- Author
- Ezeokonkwo J
- Nwoji C
- Publication year
- Publication venue
- Nigerian Journal of Technology
External Links
Snippet
Geotechnical investigators are among the first to assess the physical setting of a project. Geotechnical investigations are performed to ascertain the character and variability of the strata underlying the site of the proposed structure and to assess those properties, which …
- 238000009114 investigational therapy 0 title description 34
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B7/00—Special methods or apparatus for drilling
- E21B7/04—Directional drilling
- E21B7/046—Directional drilling horizontal drilling
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D29/00—Independent underground or underwater structures; Retaining walls
- E02D29/045—Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B7/00—Special methods or apparatus for drilling
- E21B7/20—Driving or forcing casings or pipes into boreholes, e.g. sinking; Simultaneously drilling and casing boreholes
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B41/00—Equipment or details not covered by groups E21B15/00 - E21B40/00
- E21B41/0035—Apparatus or methods for multilateral well technology, e.g. for the completion of or workover on wells with one or more lateral branches
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B47/00—Survey of boreholes or wells
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D17/00—Excavations; Bordering of excavations; Making embankments
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02F—DREDGING; SOIL-SHIFTING
- E02F5/00—Dredgers or soil-shifting machines for special purposes
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D3/00—Improving or preserving soil or rock, e.g. preserving permafrost soil
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| Gierczak | The quantitative risk assessment of MINI, MIDI and MAXI horizontal directional drilling projects applying fuzzy fault tree analysis | |
| Mamaqani | Numerical modeling of ground movements associated with trenchless box jacking technique | |
| Woodroffe et al. | Cost and risk evaluation for horizontal directional drilling versus open cut in an urban environment | |
| Jo et al. | Field investigation and analysis of ground sinking development in a metropolitan city, Seoul, Korea | |
| Burden et al. | Synthesis of trenchless technologies. | |
| Bayer | HDD practice handbook | |
| Ezeokonkwo et al. | Review of Trenchless Technologies’ Successes and their Dependence on Precise Geotechnical Investigation | |
| Alimohammadi et al. | Comprehensive Sinkhole Mitigation: A Case Study and Application of Compaction Grouting in Karstic Environments in the State of Tennessee, USA | |
| Suleiman et al. | Identification of practices, design, construction, and repair using trenchless technology | |
| Kumar | Using Decision-making Criteria Approach for the Selection of Trenchless Construction Method: A Review Study | |
| West et al. | Rock mechanics review site investigation for tunnels | |
| Balasubramanian | Geotechnical investigations for tunnelling | |
| Oweis et al. | Directional Drilling in Glacial Deposits in Warren County, New Jersey | |
| Conway | An investigation of trenchless technologies and their interaction with native Iowa soils | |
| Mok et al. | Trenchless construction of Phase IIIA district cooling system (DCS) by TBM pipejacking and hand-dug tunnelling on Kai Tak Development: part I–design and construction considerations | |
| Ashoori | Comparison of ground movements during trenchless technology operations for pipe and box installations by numerical analysis | |
| Hashash et al. | Development of guidelines for implementation of horizontal directional drilling | |
| Goduto et al. | Design and Construction Cost of a Water Line Underneath I-75 in Bowling Green, Ohio | |
| Brown et al. | Karst risks—investigation, design, and construction with case studies from Pennsylvania | |
| Ganse et al. | Geotechnical Considerations for Tunnels under Highways and Other Features | |
| French Society for Trenchless Technology (FSTT) | Microtunneling and Horizontal Drilling: Recommendations | |
| Pipe Ramming Task Force | Pipe Ramming | |
| Shang et al. | Application of guided boring trenchless technology on pipeline cross railway | |
| Adamtey et al. | State Transportation Agencies Acquiring Trenchless Technologies for Their In-House Operations: A Case Study of ODOT Acquiring HAB Machine | |
| Vergara et al. | Extensive Pipeline Field Studies and Inspections Aid in Fastpaced CMAR Project |