[go: up one dir, main page]

schedule_event

Pre-flight checklist

  • I have passed the pre-commit hooks and the pipeline
  • I have tested my code on both desktop and mobile (320px wide)
  • If I have performed multiple migrations, I have squashed all of them into a single migration

Description

  • update seed data with 2025 HackTX schedule

  • status to color dictionary

  • 75-hackerStatus

  • hacker-label

Closes #123

Merge request reports

Loading