[go: up one dir, main page]

Resolve "Acceptance Wave (RSVP based of acceptance date extensions)"

Pre-flight checklist

  • I have passed the pre-commit hooks and the pipeline
  • I have tested my code on both desktop and mobile (320px wide)
  • If I have performed multiple migrations, I have squashed all of them into a single migration

Description

  • changed color

  • finished rsvp functionality

  • added missed

Closes #124

Merge request reports

Loading