[go: up one dir, main page]

Skip to content

fix: correctly close ws connection in web3-eth-contract integration tests #10053

fix: correctly close ws connection in web3-eth-contract integration tests

fix: correctly close ws connection in web3-eth-contract integration tests #10053

Triggered via pull request November 5, 2024 12:27
Status Failure
Total duration 5m 43s
Artifacts

build.yml

on: pull_request
Matrix: Build CJS
Matrix: Integration
Fit to window
Zoom out
Zoom in

Annotations

3 errors
Integration (http)
Process completed with exit code 1.
Integration (ipc)
Process completed with exit code 1.
Integration (ws)
Process completed with exit code 1.