8000 Misinterpreted "Cap lists at 5 items" · Issue #96 · ayghri/i-have-adhd · GitHub
[go: up one dir, main page]

Skip to content

Misinterpreted "Cap lists at 5 items" #96

Open

Description

@nbali

Based on my experience the limitation can be followed too literally (literal 5 limit) and/or applied on lists it shouldn't be applied on (lists that influence further results and shouldn't be really limited, grouped, etc at that point as they might be relevant later on).

In multiple occasions it didn't do what IMO the original intention was. It doesn't just split a list - that is bigger than 5 items - into "do now" vs "later," or "must" vs "nice to have.". It just literally "capped the list at 5 items". It should be called more like "split up", "create sections", "group", etc.

Also on top of this not every question has 5 (or less) valid answer, and there are lists that must have all the actually relevant items, even if it means having more than 5. I totally agree that the endless lists some newer models produce are bad, but intentionally dropping very relevant findings aren't really better either - and with the current wording it did happen.

For my environment I completely removed that section, and it still brings most of the benefit - with better accuracy - so that is an option as well, but there might be less-nuclear options than completely removing that section:

  • the wording should be tweaked to drop anything barely resembling "limiting", and probably explicitly scoped to influence only the final output
  • the item count limit should be made dynamic to be adjusted by the LLM based on the context/task itself - or at least increasesed to 10 so cuts less by accident

My point is that - if I get it right - this skill should be about influencing the output the user gets, not the internal thought process. Sure burning tokens on something that won't be shown/used later on is a waste, but I doubt we can influence the internal workings of a thought process without affecting result/finding validity/completeness, so instructions that might be interpreted as such should be made less ambigous and more focused about the scope.

I wanted to talk about this before I do any PR - or you might take it yourself.

### 9. Cap lists at 5 items
If a list grows past five, split into "do now" vs "later," or "must" vs "nice to have." Five items ranked beats ten unranked.

Activity

  1. changed the title [-]Issue with "Cap lists at 5 items"[/-] [+]Misinterpreted "Cap lists at 5 items"[/+] on Aug 1, 2026
  2. ayghri commented on Aug 1, 2026

    @ayghri
    Owner

    That's a good point. I think the best approach would be to formulate the rule in a way that avoids setting a specific cap number.
    Let's try to come up with a clear solution in this direction.

  3. nbali commented on Aug 1, 2026

    @nbali
    Author

    @ayghri What was your original intention: to ignore/hide the "later"/"nice to have" section of the list or to have an emphasis difference between the two group?

  4. ayghri commented on Aug 4, 2026

    @ayghri
    Owner

    @nbali
    What do you think about this? it keeps the size task-specific and adds a backlog to prevent the model from interpreting 'cap at 5' as 'discard the rest':

    9. Cap active lists; backlog the rest

    Put the most important and immediate items in the active list. Choose the active-list size based on the task while minimizing the user’s working set. Retain other relevant items in a hidden backlog instead of discarding them. As active items are completed and more work remains in scope, promote the next relevant backlog item. You can expose the backlog when the user requests an exhaustive inventory and group the output for readability.

  5. Repository owner deleted a comment from on Aug 4, 2026
  6. Repository owner deleted a comment from on Aug 4, 2026
  7. Repository owner deleted a comment from on Aug 4, 2026
  8. Repository owner deleted a comment from on Aug 5, 2026
  9. nbali commented on Aug 5, 2026

    @nbali
    Author

    NGL I have no clue how the LLM will understand "active list". Anyway this feels like it's strictly for a TODO li 8000 st, but it influences a lof ot lists, not only "next action" lists.

    This is what I'm testing right now

    9. Split up lists over 5-10 items
    
    If a list grows past 5-10 items, split into "do now" vs "later," or "must" vs "nice to have." Fewer items ranked beats more unranked.
    

    Not perfect, but no loss so far.

  10. Repository owner deleted a comment from on Aug 5, 2026
  11. ayghri commented on Aug 5, 2026

    @ayghri
    Owner

    @nbali the main point is to avoid the rule being interpreted as "keep at most 5 and discard the rest", so suggesting the use of a backlog/"scratch pad" for the trimmed items should prevent that

  12. nbali commented on Aug 5, 2026

    @nbali
    Author

    What you suggested means is that:

    • we work with top X
    • the rest goes into some vaguely described background storage
    • the only way they will surface if we explicitly ask for them, or the top ones has been "completed"

    The problem is not every list contains completable items.

  13. ayghri commented on Aug 6, 2026

    @ayghri
    Owner

    not necessarily "completed", but more about keeping the top ones based on relevance. So if an item turned out to be "un-completable" we move to the next relevant one:

    1. Cap task lists at 5
      List up to 5 task items most relevant to the current request. Retain all other relevant items in reserve. As context changes, surface whichever reserved items become relevant. If the reader requests an exhaustive list, show the items grouped for readability.

    There was also a modification to "when to break the rules", rule 5:

    " A rule fights the task. When a rule would delete the answer itself, the task wins; the shape stays. Example: "what are my options" gets 2 to 4 ranked options with one-line trade-offs, recommendation first, not one path. The options are the answer."

    So if the task requires exhaustive list, the skill does not override the task (if the model is "smart" enough).

  14. nbali commented on Aug 10, 2026

    @nbali
    Author

    Well using "task list" instead of "list" should definitely narrow it down, as it most likely wouldn't consider most lists as "task lists", but other than that IMO it's still a rephrase and conceptually the same. One of the original 5 has to be considered less relevant as it was before for some reason. Apart from some explicit action - may it be called completion or not doesn't matter - I can't really see how would that happen. If the UI would support having a "X more" button that would reveal them in place it would be nice, but during my tests sometimes I didn't even get the info that there are more.

    Meanwhile this rule should be occasionally applied on non-task lists as well. For example I have received non-task lists, where the over-eagerness of Fable/Opus was unbearable, so some kind of categorization/limiting/grouping would have been nice there as well.

  15. nbali commented on Aug 17, 2026

    @nbali
    Author

    @vcolombo

    IMO your prompt could be made more compact without losing anything meaningful:

    • we don't have to give an explanation or justification for the LLM why should it do something when the instructions can be as exact as here, then it will do it just by the instruction itself
    • the LLM wouldn't even consider dropping an item, or shortening a list, if we only tell it to group/rank them and we never use the word "limit"... so the instructions about "not dropping/deleting" something is unnecessary

    IMO your prompt would be pretty much identical like this:

    9. Rank and group long lists
    Group and rank: split into "do now" vs "later," or "must" vs "nice to have," strongest items first. Around five per group.
    This shapes the final message. It never applies to analysis, search results, or tool output — do not group what only you can look at.
    
  16. nbali commented on Aug 22, 2026

    @nbali
    Author

    I saw it happen. I had 0 doubt it happens. So can you tell me, what did exactly the agent have shown in those wall of texts?

  17. nbali commented on Aug 24, 2026

    @nbali
    Author

    @vcolombo It's so ironic, that you are contributing to this repo, yet you don't get what was the problem with the wall of texts you provided. This repo is literally about never having to see that anymore.

    Anyway about the original issue.

    If you think it through logically for a moment - you know without asking an LLM - then you will realize that you can't create deterministic tests for this use-case simply because various LLMs aren't deterministic either in such scenarios.

    The question was never if it happens consistently or not. The question was can it be interpreted by an LLM in a way that it does something other than what was originally intended?

    I reported it, because it has happened to me, and even if you couldn't reproduce it that would have meant nothing.

    In the end what matters is that if someone just reads the SKILL.md can he think of a possible misinterpretation or not.

    I could, that is why I thought this should be changed.. but every solution is opionated, that is why I wanted to start this dicussion.

  18. nbali commented on Aug 24, 2026

    @nbali
    Author

    Misclick, didn't intended to close it @ayghri, but can't reopen

  19. nbali commented on Aug 24, 2026

    @nbali
    Author

    @ayghri So getting back on track, I think the main difference between our concepts is keeping an invisible backlog or surfacing everything. More precisely if this could leak into other "lists" or not.

    Personally I'm not sure we can say with absolute certainty with any of the recommended alternatives that it will never influence something else, and if it could, then we shouldn't risk it. Structuring/grouping/ranking already does most of the tiring part IMHO. We shouldn't risk losing accuracy just to hide a few extra lines that would be visibly separated already.

    Of course it's only my personal experience, but usually it isn't the amount of information that has the worst effect on my ADHD, it's the extra sh.t that it has to be kept in mind to process an information, to get an overview, to make a decision, etc.

    Do I have to read through a paragraph to get the info (f.ck you Claude 5 models), or only a header/summary and simply skipping the paragraph itself if I don't need more details?

    Do I have to keep a 13 element list in my mind to compare them on-the-fly to figure out which ones are the most important, or can I do that with a much-smaller list (yet still being unbothered by the other group containing the less relevant entries)?

    So to sum things up - at least for me - it's not the amount of the info, it's about how much mental effort it takes to find what I need to know.

    ... and in my opinion the ranked group-split without any invisible backlog already does that.

  20. reopened this on Aug 26, 2026
  21. ayghri commented on Aug 26, 2026

    @ayghri
    Owner

    @nbali I'm running some benchmarks to see how the changes I'm testing affect the outputs. I'll get back to you ASAP

  22. added
    enhancement
    question
    Target:Rules
    on Aug 26, 2026
  23. ayghri commented on Aug 30, 2026

    @ayghri
    Owner

    I ran a simple controlled benchmark of five Rule 9 wordings.

    Method:

    • 300 scored responses across the four model families
    • Same surrounding skill, prompt, output cap, and model settings within each variant comparison
    • Exact-ID recall, precision, top-5 order, silent truncation, item retention, reasoning success, and output length scored programmatically
    • Total OpenRouter cost: $1.058857

    The presentation trade-offs:

    Wording Top-5 exactness Mean words Precision
    Current hard cap 0.667 63.7 0.791
    Group/rank only 1.000 61.5 0.763
    Reserve/backlog 0.667 63.4 0.774
    Presentation-only (best) 1.000 67.2 0.792
    Soft 5–10 grouping 0.833 64.2 0.781

    The wording I think is best:

    9. Rank and group long lists

    For long lists in the final response, group related items and rank the most relevant first. Keep the visible working set small when that improves readability.

    Never omit relevant items when completeness matters. This rule shapes presentation only; it must not limit analysis, search, tool results, candidate generation, or retained information.

    The idea is to restrict Rule 9's controls to presentation. I prefer the presentation-only wording because it protects the semantic distinction this issue is concerned with.

    These toy benchmarks and far from the level of complexity seen in real use. Examples of questions used:

    • “List every finding below, grouped by category. Do not omit any finding.”
    • “Give me exactly the five highest-priority findings, ranked from highest to lowest.”
    • “Identify all viable options and give one short trade-off for each.”
    • “From these results, identify every result satisfying the requirement. Group them if useful.”
    • “I need to make progress now. Give me the smallest useful set of next actions.”
    • “Give me the complete list of supported flags from the specification below. I need all of them.”
    • ....
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Assignees

No one assigned

    Labels

    Target:Rulesenhancementquestion

    Type

    No type

    Projects

    No projects

      Milestone

      No milestone

      Relationships

      None yet

      Development

      No branches or pull requests

      Issue actions

      0