Repository navigation
feat(planwright): let workers self-approve own-branch writes and use the Mac for gate runs - #236
Merged
Conversation
… gate runs to the Mac
This file contains hidden or bidirectional Unicode text that may be interpreted or compiled differently than what appears below. To review, open the file in an editor that reveals hidden Unicode characters.
Learn more about bidirectional Unicode characters
Sign up for free
to join this conversation on GitHub.
Already have an account?
Sign in to comment
Add this suggestion to a batch that can be applied as a single commit.This suggestion is invalid because no changes were made to the code.Suggestions cannot be applied while the pull request is closed.Suggestions cannot be applied while viewing a subset of changes.Only one suggestion per line can be applied in a batch.Add this suggestion to a batch that can be applied as a single commit.Applying suggestions on deleted lines is not supported.You must change the existing code in this line in order to create a valid suggestion.Outdated suggestions cannot be applied.This suggestion has been applied or marked resolved.Suggestions cannot be applied from pending reviews.Suggestions cannot be applied on multi-line comments.Suggestions cannot be applied while the pull request is queued to merge.Suggestion cannot be applied right now. Please check back later.
Dispatched planwright workers can now also write inside their own unit branch and worktree without a prompt (
worker_self_approval: scratch own-branch), and gate test and lint runs go to the Mac, falling back to this host when it is busy, in use or unreachable (fleet_compute_host: mac). Both keys are added to the rendered planwright overlay template.The overlay template check in
skill-contracts.shaccepted only a single bare word as a value, so it now accepts space-separated words, with a fixture for it.Bot review is skipped: cubic's monthly quota is reached (resumes 2 December 2026) and dotfiles has no PR-Agent workflow yet.
Step records
Polish and panel review (Gemini) ran in-session; panel review's two low findings (strict single-space matching is intended, and an extra negative fixture is gold-plating) were declined.
Steps at pre-implementation, pre-ci and pre-pr: none declared. Convergence (run
000001, ended one5af4612e3c3):Post-PR (run
000001): bot-review skipped (cubic quota reached, resumes 2 December 2026; no PR-Agent workflow yet).