Split your test suite into N buckets using past runtime data, so parallel CI shards finish at roughly the same time.

Topics

Resources

Code of conduct

Contributing

Security policy

Stars

1 star

Watchers

0 watching

Forks

Repository files navigation

shardfit

CI codecov License: MIT Go

Split your test suite into N buckets using past runtime data, so parallel CI shards finish at roughly the same time. One static binary, any framework — pytest, jest, JUnit, xunit, or anything that can emit a test list and JUnit XML. No SaaS, no DB: your timing data is one JSON file you keep wherever you want (CI cache, artifacts, GCS, S3).

How it works

Job 1: split                    Job 2: test (matrix 1..8)         Job 3: report (needs: test)
  restore timings.json           download bucket-$N.txt            download results-*.xml
  shardfit pytest split -n 8    pytest $(cat bucket-$N.txt)        shardfit pytest report \
    --timings timings.json        --junitxml=results-$N.xml          --junit-xml "results-*.xml" \
  upload buckets                 upload results-$N.xml                --timings timings.json
                                                                     upload timings.json → cache

The split phase reads the timing store, estimates each test's duration, and writes bucket-1.txt … bucket-N.txt (one test id per line). The report phase folds the JUnit XML your runner already produces back into the store. Buckets run tests completely normally — shardfit is never in the hot path.

Install

Download the latest binary from Releases, or build from source:

go install github.com/azhar9/shardfit/cmd/shardfit@latest

Quickstart (pytest)

  1. Split (one job, before your test matrix):
shardfit pytest split -n 8 --timings timings.json --out-dir buckets
# writes buckets/bucket-1.txt … bucket-8.txt
  1. Run (matrix job $SHARD), with JUnit XML enabled:
pytest $(cat buckets/bucket-$SHARD.txt) --junitxml=results-$SHARD.xml
  1. Report (one job, after the matrix):
shardfit pytest report --junit-xml "results-*.xml" --timings timings.json

First run is a cold start: buckets are balanced by test count, a warning says so, and from the second run on the split is duration-aware.

Adapters

Adapter discover granularity JUnit XML source
pytest pytest --collect-only -q (+ --filter) test --junitxml
jest jest --listTests (+ --filter) file jest-junit (classNameTemplate: {filepath})
junit --input list test surefire
xunit --input list test JUnitTestLogger
generic --input list test any

See docs/adapters/ for per-adapter setup and docs/ci/ for CI wiring (GitHub Actions, GitLab, CircleCI, Jenkins).

How the split works

Each test's expected duration is a recency-weighted median of its last 5 runs, dampened when the history is flaky, capped at the suite's P99. Tests with no history get the median of known tests. Buckets are filled longest-first into the least-loaded bucket (LPT — provably within ~33% of optimal). Deterministic for identical input.

Docs

MIT licensed.

About

Split your test suite into N buckets using past runtime data, so parallel CI shards finish at roughly the same time.

Topics

Resources

Code of conduct

Contributing

Security policy

Stars

1 star

Watchers

0 watching

Forks

Releases

Packages

Contributors

Languages

0