“We are today testing all our equipment, putting our brine tanks on, putting our spreaders on, our plows on, making sure everything connects and hooks up and working properly." ... .
The NCDOT on Nov ... In presenting the update to the media at a news conference, NCDOT Division 3EngineerTrevor Carroll explained that the revised Alternative B would feature a large loop design that maintains access to Third Street.
N.C. 12, the only highway access to Hatteras Island, reopened at 4 p.m. Thursday to one-way traffic through the Pea Island National Wildlife Refuge, more than a week after a coastal storm forced the state to close the road for ... .
N.C. 12, the only highway access to Hatteras Island, will reopen at 4 p.m. Thursday to one-way traffic through the Pea Island National Wildlife Refuge, more than a week after a coastal storm forced the state to close the road ... .
The North Carolina Department of Transportation (NCDOT) is aiming to reopen N.C ... NCDOT emphasized that the Friday reopening is a goal rather than a confirmed date, as construction remains dependent on weather and tidal conditions ...Photo by NCDOT ....
The North Carolina Department of Transportation (NCDOT) has begun removing damaged pavement, rebuilding protective dunes, and grading the roadbed in preparation for eventually reopening a one-lane paved detour ... NCDOT image.