| Advanced research methods in the built environment A Knight, L Ruddock John Wiley & Sons, 2009 | 495 | 2009 |
| The professionals’ perspective on the causes of project delay in the construction industry G Agyekum-Mensah, AD Knight Engineering, construction and architectural management 24 (5), 828-841, 2017 | 181 | 2017 |
| 4Es and 4 Poles model of sustainability: Redefining sustainability in the built environment G Agyekum‐Mensah, A Knight, C Coffey Structural Survey 30 (5), 426-442, 2012 | 81 | 2012 |
| Epistemology AD Knight, N Turnbull Wiley Blackwell, 2008 | 62 | 2008 |
| The concept and development of supply chain management in the UK construction industry R Morledge, A Knight, M Grada Construction supply chain management: Concepts and case studies, 23-41, 2009 | 61 | 2009 |
| Causes of construction delays in Iran: project management, logistics, technology and environment E Asnaashari, A Knight, A Hurst, SS Farahani Procs 25th Annual ARCOM Conference, 7-9, 2009 | 58 | 2009 |
| Best practice tendering for design and build projects A Griffith, A Knight, A King Thomas Telford, 2003 | 34 | 2003 |
| Economic incentives to improve occupational safety and health: a review from the European perspective D Elsler Publications Office of the European Union, 2010 | 29 | 2010 |
| Digitalisation in construction report 2022 A Sawhney, A Knight, S Birch, K Pitman Royal institution of chartered surveyors (RICS). Parliament Square, 2023 | 22 | 2023 |
| Supply side short‐circuiting in design and build projects AD Knight, A Griffith, AP King Management decision 40 (7), 655-662, 2002 | 21 | 2002 |
| Developing a biophilic behavioural change design framework-A scoping study Y Xing, A Williams, A Knight Urban Forestry & Urban Greening 94, 128278, 2024 | 13 | 2024 |
| Understanding supply chain management from a main contractor's perspective E Manu, A Knight Successful construction supply chain management: Concepts and case studies …, 2020 | 12 | 2020 |
| Exploring biophilic building designs to promote wellbeing and stimulate inspiration Y Xing, N Stevenson, C Thomas, A Hardy, A Knight, N Heym, A Sumich PloS one 20 (3), e0317372, 2025 | 10 | 2025 |
| Advanced research methods in the built environment A Dainty, A Knight, L Ruddock Methodological Pluralism in Construction Management Research, Wiley …, 2008 | 10 | 2008 |
| Delays in the Iranian construction projects: Stakeholders and economy E Asnaashari, A Knight, A Hurst Challenges, opportunities and solutions in structural engineering and …, 2009 | 9 | 2009 |
| Professionalism and ethical decision making A Knight, R Morledge conference proceedings of the QUT Research Week, Brisbane, Australia, 4-5, 2005 | 9 | 2005 |
| Developing an AI-based digital biophilic art curation to enhance mental health in intelligent buildings Y Xing, P Kar, JJ Bird, A Sumich, A Knight, A Lotfi, ... Sustainability 16 (22), 9790, 2024 | 8 | 2024 |
| Adaption of structured analysis design techniques methodology for construction project planning G Agyekum-Mensah, A Knight, C Pasquire ARCOM, Association of Researchers in Construction Management 2, 1055-1065, 2012 | 8 | 2012 |
| Causes of delay in Iran construction projects E Asnaashari, S Farahani, A Hoseini, A Knight, A Hurst Proceedings of the 5th International Conference on Construction in the 21st …, 2009 | 7 | 2009 |
| Construction professional services: a process model M Hoxley, A Knight, A Grada RICS/Georgia Institute of Technology, 2007 | 7 | 2007 |