[go: up one dir, main page]

Follow
byung cheon choi
byung cheon choi
Professor, School of Business, Chungnam National University
Verified email at cnu.ac.kr
Title
Cited by
Cited by
Year
Approximation algorithms for multi-agent scheduling to minimize total weighted completion time
K Lee, BC Choi, JYT Leung, ML Pinedo
Information Processing Letters 109 (16), 913-917, 2009
1142009
Two-stage production scheduling with an outsourcing option
K Lee, BC Choi
European Journal of Operational Research 213 (3), 489-497, 2011
822011
Two-machine flow shop scheduling problem with an outsourcing option
BC Choi, J Chung
European Journal of Operational Research 213 (1), 66-72, 2011
712011
Complexity of single machine scheduling subject to nonnegative inventory constraints
D Briskorn, BC Choi, K Lee, J Leung, M Pinedo
European Journal of Operational Research 207 (2), 605-619, 2010
692010
Maximizing the weighted number of just-in-time jobs in flow shop scheduling
BC Choi, SH Yoon
Journal of Scheduling 10 (4), 237-243, 2007
462007
Minimizing maximum completion time in a proportionate flow shop with one machine of different speed
BC Choi, SH Yoon, SJ Chung
European Journal of Operational Research 176 (2), 964-974, 2007
462007
Outsourcing and scheduling for two-machine ordered flow shop scheduling problems
DY Chung, BC Choi
European Journal of Operational Research 226 (1), 46-52, 2013
412013
Min–max regret version of a scheduling problem with outsourcing decisions under processing time uncertainty
BC Choi, K Chung
European Journal of Operational Research 252 (2), 367-375, 2016
332016
Flow shops with machine maintenance: Ordered and proportionate cases
BC Choi, K Lee, JYT Leung, ML Pinedo
European Journal of Operational Research 207 (1), 97-104, 2010
322010
An adaptive crashing policy for stochastic time-cost tradeoff problems
C Kang, BC Choi
Computers & Operations Research 63, 1-6, 2015
242015
Container scheduling: Complexity and algorithms
BC Choi, K Lee, JYT Leung, ML Pinedo, D Briskorn
Production and Operations Management 21 (1), 115-128, 2012
242012
Single machine scheduling problem with controllable processing times and resource dependent release times
BC Choi, SH Yoon, SJ Chung
European Journal of Operational Research 181 (2), 645-653, 2007
242007
A continuous time–cost tradeoff problem with multiple milestones and completely ordered jobs
BC Choi, MJ Park
European Journal of Operational Research 244 (3), 748-752, 2015
222015
A vector space approach to tag cloud similarity ranking
J Park, BC Choi, K Kim
Information Processing Letters 110 (12-13), 489-496, 2010
212010
Complexity results for the linear time–cost tradeoff problem with multiple milestones and completely ordered jobs
BC Choi, J Chung
European Journal of Operational Research 236 (1), 61-68, 2014
202014
Strong NP-hardness of minimizing total deviation with generalized and periodic due dates
BC Choi, Y Min, MJ Park
Operations Research Letters 47 (5), 433-437, 2019
172019
Just-in-time scheduling with generalized due dates and identical due date intervals
BC Choi, MJ Park
Asia-Pacific Journal of Operational Research 35 (06), 1850046, 2018
172018
Two-agent single-machine scheduling problem with just-in-time jobs
BC Choi, J Chung
Theoretical Computer Science 543, 37-45, 2014
162014
Minimizing the total weighted completion time in a two-machine proportionate flow shop with different machine speeds
BC Choi, SH Yoon, SJ Chung
International journal of production research 44 (4), 715-728, 2006
152006
Just-in-time scheduling with multiple competing agents
DY Chung, BC Choi
Journal of the Korean Operations Research and Management Science Society 37 …, 2012
142012
The system can't perform the operation now. Try again later.
Articles 1–20