| A review on integrated scheduling and outbound vehicle routing problems L Berghman, Y Kergosien, JC Billaut European Journal of Operational Research 311 (1), 1-23, 2023 | 82 | 2023 |
| Efficient solutions for Mastermind using genetic algorithms L Berghman, D Goossens, R Leus Computers & operations research 36 (6), 1880-1885, 2009 | 78 | 2009 |
| Optimal solutions for a dock assignment problem with trailer transportation L Berghman, R Leus, F Spieksma Annals of Operations Research 213 (1), 3-25, 2014 | 63* | 2014 |
| Solving an integrated scheduling and routing problem with inventory, routing and penalty costs H Chevroton, Y Kergosien, L Berghman, JC Billaut European Journal of Operational Research 294 (2), 571-589, 2021 | 40 | 2021 |
| Practical solutions for a dock assignment problem with trailer transportation L Berghman, R Leus European Journal of Operational Research 246 (3), 787-799, 2015 | 28 | 2015 |
| The truck scheduling problem at crossdocking terminals-exclusive versus mixed mode L Berghman, C Briand, R Leus, P Lopez 4th international conference on operations research and enterprise systems …, 2015 | 20 | 2015 |
| The truck scheduling problem at cross-docking terminals L Berghman HAL (Le Centre pour la Communication Scientifique Directe), 2012 | 19 | 2012 |
| Complexity of flow time minimization in a crossdock truck scheduling problem with asymmetric handover relations Q Fabry, A Agnetis, L Berghman, C Briand Operations Research Letters 50 (1), 50-56, 2022 | 13 | 2022 |
| Solving a time-indexed formulation by preprocessing and cutting planes L Berghman, F Spieksma, V t'Kindt Available at SSRN 2437371, 2014 | 10* | 2014 |
| Valid inequalities for a time-indexed formulation L Berghman, FCR Spieksma Operations Research Letters 43 (3), 268-272, 2015 | 8 | 2015 |
| Machine scheduling models for warehousing docking operations L Berghman KU Leuven, 2012 | 6 | 2012 |
| Using flexible crossdock schedules to face truck arrivals uncertainty Q Fabry, L Berghman, C Briand IFIP International Conference on Advances in Production Management Systems …, 2021 | 2 | 2021 |
| On the complexity of the crossdock truck-scheduling problem Q Fabry, A Agnetis, L Berghman, C Briand 17th International Workshop on Project Management and Scheduling (PMS 2020-2021), 2021 | 2 | 2021 |
| A Lagrangian heuristic for a dock assignment problem with trailer transportation L Berghman, R Leus 2010 IEEE International Conference on Industrial Engineering and Engineering …, 2010 | 2 | 2010 |
| Driver retention in logistics: A multi-objective approach L Kok, L Berghman, T Bruinink Journal of Supply Chain Management, Logistics and Procurement 7 (3), 250-259, 2025 | 1 | 2025 |
| Probleme de cross-docking en mode mixte L Berghman, C Briand, R Leus, P Lopez ROADEF 2012, congrès annuel de la Société française de Recherche …, 2012 | 1 | 2012 |
| Computational experiments with a cutting-plane algorithm for a time-indexed formulation L Berghman, F Spieksma Available at SSRN 2164223, 2012 | 1 | 2012 |
| Solving a dock assignment problem as a three-stage flexible flow-shop problem L Berghman, R Leus 2009 IEEE International Conference on Industrial Engineering and Engineering …, 2009 | 1 | 2009 |
| Beyond efficiency: Exploring the cost effects of prioritizing driver satisfaction in vehicle routing T Bruinink, L Berghman, T Dollevoet Operations Research Letters, 107344, 2025 | | 2025 |
| Integrated production and delivery problem: case of several manufacturers and one customer H Chevroton, Y Kergosien, L Berghman 17th International Workshop on Project Management and Scheduling, 2021 | | 2021 |