[go: up one dir, main page]

Follow
Noor Yasmin Zainun
Noor Yasmin Zainun
Verified email at uthm.edu.my
Title
Cited by
Cited by
Year
Proposed framework for the flood disaster management cycle in Malaysia
SAHBS Muzamil, NY Zainun, NN Ajman, N Sulaiman, SH Khahro, ...
Sustainability 14 (7), 4088, 2022
662022
Delay in decision-making affecting construction projects: a sustainable decision-making model for mega projects
SH Khahro, HH Shaikh, NY Zainun, B Sultan, QH Khahro
Sustainability 15 (7), 5872, 2023
622023
Low Cost House Demand Predictor
NY Zainun, MZA Majid
Universitas Teknologi Malaysia 107, 2003
602003
Risk severity matrix for sustainable public-private partnership projects in developing countries
SH Khahro, TH Ali, S Hassan, NY Zainun, Y Javed, SA Memon
Sustainability 13 (6), 3292, 2021
452021
Claims in construction projects: A comprehensive literature review
HH Shaikh, NY Zainun, SH Khahro
IOP Conference Series: Earth and Environmental Science 498 (1), 012095, 2020
442020
Web-based risk assessment technique for time and cost overrun (WRATTCO)–A framework
AH Memon, IA Rahman, NY Zainun, AT Abd Karim
Procedia-Social and Behavioral Sciences 129, 178-185, 2014
432014
Forecasting low-cost housing demand in Johor Bahru, Malaysia using artificial neural networks (ANN)
NYB Zainun, IA Rahman, M Eftekhari
Journal of Mathematics Research 2 (1), 14, 2010
432010
Mapping of construction waste illegal dumping using geographical information system (gis)
NY Zainun, IA Rahman, RA Rothman
IOP Conference Series: Materials Science and Engineering 160 (1), 012049, 2016
362016
Improving time performance in construction projects: Perspective of contractor
AH Memon, N Roslan, NY Zainun
Journal of American Science 10 (8), 46-50, 2014
272014
An overview of total Quality management (TQM) practice in construction sector
AJ Likita, NY Zainun, IA Rahman, ASMA Awal, AR Alias, MQA Rahman, ...
IOP Conference Series: Earth and Environmental Science 140 (1), 012115, 2018
222018
Assessing low-cost housing demand in Melaka: PLS-SEM approach
NY Zainun, N Roslan, AH Memon
Advanced Materials Research 838, 3156-3162, 2014
202014
Time management practices in large construction projects
AH Memon, IA Rahman, I Ismail, NY Zainun
Colloquium on Humanities (January), 61-65, 2014
202014
Comparison between ARIMA and DES methods of forecasting population for housing demand in Johor
AR Alias, NY Zainun, IA Rahman
MATEC Web of Conferences 81, 07002, 2016
192016
Measures for controlling time and cost overrun factors during execution stage
N Roslan, NY Zainun, AH Memon
International Journal of Construction Technology and Management 1 (1), 8-11, 2014
192014
Computerized model to forecast low-cost housing demand in urban area in Malaysia using artificial neural networks (ANN)
NYB Zainun
Loughborough University, 2011
162011
An integrated model to improve job satisfaction: A case for a sustainable construction industry
QH Khahro, NY Zainun, SH Khahro, B Sultan
Sustainability 15 (10), 8357, 2023
152023
General risks for tunnelling projects: An overview
LY Siang, FEM Ghazali, NY Zainun, R Ali
AIP Conference Proceedings 1892 (1), 080004, 2017
152017
Low cost housing demand factors in Malaysia
NY Zainun, SS Ismail
Applied Mechanics and Materials 773, 1037-1041, 2015
152015
Relevancy of factors and mitigation measures in controlling time and cost overrun towards Malaysian environment
N Roslan, NY Zainun, AH Memon
Applied Mechanics and Materials 773, 1007-1011, 2015
132015
Environmental Impact Assessment (EIA) Using Geographical Information System (GIS): An Integrated Land Suitability Analysis of Filling Stations
NN Ajman, NY Zainun, N Sulaiman, SH Khahro, FEM Ghazali, MH Ahmad
Sustainability 13 (17), 9859, 2021
122021
The system can't perform the operation now. Try again later.
Articles 1–20