[go: up one dir, main page]

Follow
June S. Yi
June S. Yi
Verified email at ewha.ac.kr
Title
Cited by
Cited by
Year
Development of automatic-extraction model of poisonous clauses in international construction contracts using rule-based NLP
J Lee, JS Yi, JW Son
Journal of Computing in Civil Engineering 33 (3), 04019003, 2019
2192019
BIM-integrated construction operation simulation for just-in-time production management
WS Jeong, S Chang, JW Son, JS Yi
Sustainability 8 (11), 1106, 2016
1202016
Effective risk positioning through automated identification of missing contract conditions from the contractor’s perspective based on FIDIC contract cases
JH Lee, Y Ham, JS Yi, JW Son
Journal of Management in Engineering 36 (3), 05020003, 2020
1062020
A project manager's level of satisfaction in construction logistics
H Jang, JS Russell, JS Yi
Canadian Journal of Civil Engineering 30 (6), 1133-1142, 2003
942003
Construction workers’ awareness of safety information depending on physical and mental load
S Kim, H Lee, S Hwang, JS Yi, JW Son
Journal of Asian Architecture and Building Engineering 21 (3), 1067-1077, 2022
822022
Supply chain cost model for prefabricated building material based on time-driven activity-based costing
YW Kim, SH Han, JS Yi, SW Chang
Canadian Journal of Civil Engineering 43 (4), 287-293, 2016
812016
Predicting project’s uncertainty risk in the bidding process by integrating unstructured text data and structured numerical data using text mining
JH Lee, JS Yi
Applied Sciences 7 (11), 1141, 2017
802017
A suggested color scheme for reducing perception-related accidents on construction work sites
J Yi, Y Kim, K Kim, B Koo
Accident Analysis & Prevention 48, 185-192, 2012
782012
Establishment of growth strategies for international construction firms by exploring diversification-related determinants and their effects
YK Sung, JH Lee, JS Yi, JW Son
Journal of Management in Engineering 33 (5), 04017018, 2017
452017
Environmental impacts comparison between on-site vs. prefabricated Just-In-Time (prefab-JIT) rebar supply in construction projects
YW Kim, R Azari-N, JS Yi, J Bae
Journal of Civil Engineering and Management 19 (5), 647-655, 2013
322013
Construction disputes and associated contractual knowledge discovery using unstructured text-heavy data: Legal cases in the United Kingdom
JH Lee, Y Ham, JS Yi
Sustainability 13 (16), 9403, 2021
302021
Image generation of hazardous situations in construction sites using text-to-image generative model for training deep neural networks
H Kim, JS Yi
Automation in Construction 166, 105615, 2024
232024
Identifying critical risk factors and management activities for effective offsite construction projects during construction phase
SY Lee, YE Jang, JS Yi, JW Son
Journal of Management in Engineering 39 (4), 04023018, 2023
192023
BIM-based management system for off-site construction projects
YE Jang, JW Son, JS Yi
Applied Sciences 12 (19), 9878, 2022
192022
A suggestion of the direction of construction disaster document management through text data classification model based on deep learning
H Kim, YE Jang, HB Kang, JW Son, JS Yi
Korean Journal of Construction Engineering and Management 22 (5), 73-85, 2021
182021
Unstructured construction data analytics using R programming-focused on overseas construction adjudication cases
JH Lee, JS Yi, JW Son
Journal of the Architectural Institute of Korea Structure & Construction 32 …, 2016
172016
Insulation plan of aluminum curtain wall-fastening unit for high-rise residential complex
SY Song, JS Yi, BK Koo
Building and Environment 43 (7), 1310-1317, 2008
172008
Analyzing Patterns of Multi-cause Accidents From KOSHA’s Construction Injury Case Reports Utilizing Text Mining Methodology
K Hayoung, Y June-Seong, J Yeeun
Journal of the Architectural Institute of Korea 38 (4), 237-244, 2022
152022
Application of serious games for effective construction safety training
JW Son, SW Shin, JS Yi
Korean journal of construction engineering and management 15 (1), 20-27, 2014
142014
CTGAN-based model to mitigate data scarcity for cost estimation in green building projects
E Hong, JS Yi, D Lee
Journal of Management in Engineering 40 (4), 04024024, 2024
132024
The system can't perform the operation now. Try again later.
Articles 1–20