[go: up one dir, main page]

Follow
Dada, Joshua Oluwasuji
Dada, Joshua Oluwasuji
Professor of Quantity Surveying and Construction Project Management
Verified email at oauife.edu.ng - Homepage
Title
Cited by
Cited by
Year
Core skills requirement and competencies expected of quantity surveyors: perspectives from quantity surveyors, allied professionals and clients in Nigeria
JO Dada, GO Jagboro
Australasian Journal of Construction Economics and Building, The 12 (4), 78-90, 2012
1262012
An evaluation of the impact of risk on project cost overrun in the Nigerian construction industry
JO Dada, GO Jagboro
Journal of Financial Management of Property and Construction 12 (1), 37-44, 2007
762007
Assessment of academic stress and coping strategies among built environment undergraduate students in Nigerian higher education
JO Dada, SO Babatunde, RO Adeleye
Journal of Applied Research in Higher Education 11 (3), 367-378, 2019
632019
Training gaps in the adoption of building information modelling by Nigerian construction professionals
EO Oyewole, JO Dada
Built Environment Project and Asset Management 9 (3), 399-411, 2019
392019
An assessment of risk in construction in the Nigerian construction industry
HA Odeyinka, A Oladapo, JO Dada
International Symposium on Globalisation and Construction, 359-368, 2004
282004
Key factors affecting the competence of quantity surveyors: Evidence from construction industry stakeholders in Nigeria
JO Dada, NA Musa
Journal of Engineering, Design and Technology 14 (3), 461-474, 2016
252016
Strategies for militating risk in construction projects
JO Dada
proceedings of the 40th Annual general meeting/conference of the Nigerian …, 2010
242010
An Evaluation of Training Needs of the Nigerian Construction Professionals in Adopting Building Information Modelling.
OO Elijah, DJ Oluwasuji
Journal of Construction in Developing Countries 24 (2), 2019
222019
Evaluating quantity surveying firms’ performance: An application of balanced scorecard technique
HF Osunsanwo, JO Dada
International Journal of Productivity and Performance Management 69 (1), 134-152, 2020
192020
A framework for assessing quantity surveyors’ competence
JO Dada, GO Jagboro
Benchmarking: An International Journal 25 (7), 2390-2403, 2018
152018
An appraisal of paradigm shifts required of competence of the Nigerian quantity surveyors
JO Dada
Engineering, Construction and Architectural Management 24 (6), 1269-1280, 2017
142017
A principal component analysis of skills and competencies required of quantity surveyors: Nigerian perspective
J Oluwasuji Dada
Organization, technology & management in construction: an international …, 2014
132014
An evaluation of risk factors impacting construction cash flow forecast
JO Dada, GO Jagboro
Journal of Financial Management of Property and Construction 12 (1), 37-44, 2007
122007
An assessment of risk factors in the procurement of building projects in Lagos and Abuja
JO Dada
Unpublished MSc. thesis, Department of Quantity Surveying, Obafemi Awiolowo …, 2005
112005
Factors affecting women enrolment in construction education in Nigeria
JO Dada
Journal of Construction Project Management and Innovation 7 (Supplement 1 …, 2017
8*2017
State of university-industry collaboration in quantity surveying profession in Nigeria
MA Alli, JO Dada
Frontiers in Engineering and Built Environment 3 (3), 180-191, 2023
52023
Risk assessment and allocation in budgeting
HA Odeyinka, JO Dada
A paper delivered at the Nigerian Institute of Quantity Surveyors (NIQS …, 2016
52016
Developing Human potential within the Nigerian public sector
JO Dada
The 4th Pan-African Conference of Ministers of public service case studies, 2003
52003
An Assessment of influencing factors of Contract period of Construction projects in South Western Nigeria
GK Ojo, JO Dada
The Professional Builder, Journal of the Nigerian Institute of Building 12 …, 2005
42005
Impact of Contractors’ Bidding Strategies on Bid Success in the Nigeria Construction Industry
TS Fawale, JO Dada
International Journal of Built Environment and Sustainability 4 (1), 2017
22017
The system can't perform the operation now. Try again later.
Articles 1–20