| BIM in off-site manufacturing for buildings FH Abanda, JHM Tah, FKT Cheung Journal of building engineering 14, 89-102, 2017 | 357 | 2017 |
| Early stage multi-level cost estimation for schematic BIM models FKT Cheung, J Rihan, J Tah, D Duce, E Kurul Automation in construction 27, 67-77, 2012 | 275 | 2012 |
| A framework for the utilization of Building Management System data in building information models for building design and operation AH Oti, E Kurul, F Cheung, JHM Tah Automation in Construction 72, 195-210, 2016 | 201 | 2016 |
| Multi-criteria evaluation model for the selection of architectural consultants FKT Cheung, JLF Kuen, M Skitmore Construction Management & Economics 20 (7), 569-580, 2002 | 168 | 2002 |
| Mathematical modelling of embodied energy, greenhouse gases, waste, time–cost parameters of building projects: A review FH Abanda, JHM Tah, FKT Cheung Building and environment 59, 23-37, 2013 | 132 | 2013 |
| Demystifying the concept of offsite manufacturing method: Towards a robust definition and classification system AR Kudirat, O. A., Cheung, F. & Tawil Construction Innovation 20 (2), 223-246, 2019 | 68* | 2019 |
| Evaluation of lean off-site construction literature through the lens of industry 4.0 and 5.0 A Hadi, F Cheung, S Adjei, A Dulaimi Journal of Construction Engineering and Management 149 (12), 03123007, 2023 | 43 | 2023 |
| Application of cross validation techniques for modelling construction costs during the very early design stage FKT Cheung, M Skitmore Building and environment 41 (12), 1973-1990, 2006 | 36 | 2006 |
| Rethinking the build process for BIM adoption E Kurul, H Abanda, J Tah, F Cheung CIB World Building Congress Construction and Society. Australia, 2013 | 30 | 2013 |
| ifcOWL-DfMA a new ontology for the offsite construction domain EV Kalemi, F Cheung, ARH Tawil, P Patlakas, K Alyania LDAC 2020-Proceedings of the 8th Linked Data in Architecture and …, 2020 | 28 | 2020 |
| Exploring the relationships between linked open data and building information modelling FH Abanda, W Zhou, JHM Tah, F Cheung Sustainable Building Conference, 176-185, 2013 | 28 | 2013 |
| A study of clients' and estimators' tolerance towards estimating errors FKT Cheung, MWL Wong, M Skitmore Construction Management and Economics 26 (4), 349-362, 2008 | 27 | 2008 |
| A semantic offsite construction digital Twin-Offsite Manufacturing Production Workflow (OPW) ontology K Ayinla, E Vakaj, F Cheung, ARH Tawil second international workshop on semantic digital twins, 2021 | 26 | 2021 |
| Process waste analysis for offsite production methods for house construction: A case study of factory wall panel production K Ayinla, F Cheung, M Skitmore Journal of construction engineering and management 148 (1), 05021011, 2022 | 23 | 2022 |
| Does the UK built environment sector have the institutional capacity to deliver sustainable development? E Kurul, JHM Tah, F Cheung Architectural Engineering and Design Management 8 (1), 42-54, 2012 | 21 | 2012 |
| The utilization of BMS in BIM for facility management A Oti, E Kurul, F Cheung, J Tah Proceedings of the CIB World Building Congress, Tampere, Finland 30, 2016 | 18 | 2016 |
| An ontology-based cost estimation for offsite construction E Vakaj, F Cheung, J Cao, ARH Tawil, P Patlakas Journal of information technology in construction (ITcon) 28, 220-245, 2023 | 15 | 2023 |
| Measuring the embodied energy, waste, CO2 emissions, time and cost for building design and construction H Abanda, JHM Tah, F Cheung, W Zhou Computing in Civil and Building Engineering, Proc., Int. Conf., Jun, 2010 | 15 | 2010 |
| A modified storey enclosure model FKT Cheung, M Skitmore Construction Management and Economics 24 (4), 391-405, 2006 | 11 | 2006 |
| Towards a holistic modeling framework for embodied carbon and waste in the building lifecycle JHM Tah, W Zhou, FH Abanda, FKT Cheung Proceedings of the International Conference on Computing in Civil and …, 2010 | 10 | 2010 |