| Inventory management under random supply disruptions and partial backorders A Arreola‐Risa, GA DeCroix Naval Research Logistics (NRL) 45 (7), 687-703, 1998 | 245 | 1998 |
| Optimal production and inventory policy for multiple products under resource constraints GA DeCroix, A Arreola-Risa Management Science 44 (7), 950-961, 1998 | 158 | 1998 |
| Note on “Future supply uncertainty in EOQ models” E Berk, A Arreola‐Risa Naval Research Logistics (NRL) 41 (1), 129-132, 1994 | 129 | 1994 |
| Make-to-order versus make-to-stock in a production–inventory system with general production times A Arreola-Risa, GA DeCroix IIE transactions 30 (8), 705-713, 1998 | 122 | 1998 |
| A worker-based approach for modeling variability in task completion times KH Doerr, A Arreola-Risa IIE transactions 32 (7), 625-636, 2000 | 71 | 2000 |
| On offering economic incentives to backorder GA DeCROIX, A Arreola-Risa IIE transactions 30 (8), 715-721, 1998 | 40 | 1998 |
| Financial risk, inventory decision and process improvement for a firm with random capacity B Li, A Arreola-Risa European Journal of Operational Research 260 (1), 183-194, 2017 | 39 | 2017 |
| Integrated multi-item production-inventory systems A Arreola-Risa European Journal of Operational Research 89 (2), 326-340, 1996 | 35 | 1996 |
| Optimizing stochastic production-inventory systems: A heuristic based on simulation and regression analysis A Arreola-Risa, VM Giménez-García, JL Martínez-Parra European Journal of Operational Research 213 (1), 107-118, 2011 | 31 | 2011 |
| Programación lineal JA Risa, AA Risa | 30 | 2003 |
| Economic lot scheduling with lost sales and setup times BH Faaland, TG Schmitt, A Arreola-Risa IIE Transactions 36 (7), 629-640, 2004 | 24 | 2004 |
| Optimizing a production-inventory system under a cost target B Li, Q Ji, A Arreola-Risa Computers & Operations Research 123, 105015, 2020 | 18 | 2020 |
| Design of stockless production systems A Arreola‐Risa, MF Keblis Production and Operations Management 22 (1), 203-215, 2013 | 14 | 2013 |
| Minimizing conditional value‐at‐risk under a modified basestock policy B Li, A Arreola‐Risa Production and Operations Management 31 (4), 1822-1838, 2022 | 11 | 2022 |
| On minimizing downside risk in make‐to‐stock, risk‐averse firms B Li, A Arreola‐Risa Naval Research Logistics (NRL) 68 (2), 199-213, 2021 | 11 | 2021 |
| On the improvement of uncertain cloud service capacity B Li, Z Tan, A Arreola-Risa, Y Huang International Journal of Production Economics 258, 108779, 2023 | 9 | 2023 |
| Integrated production-distribution systems with capacitated manufacturing facilities A Arreola-Risa Stanford University, 1989 | 7 | 1989 |
| Optimizing a single-product production-inventory system under constant absolute risk aversion S Lin, B Li, A Arreola-Risa, Y Huang Top 31 (3), 510-537, 2023 | 4 | 2023 |
| On inventory abatement via manufacturing randomness reductions A Arreola‐Risa Decision Sciences 29 (4), 983-1004, 1998 | 2 | 1998 |
| Managing a bone marrow transplant centre to maximise patients' health benefits B Li, A Arreola-Risa International Journal of Production Research 61 (6), 1771-1795, 2023 | 1 | 2023 |