| Digital transformation priorities of India’s discrete manufacturing SMEs–a conceptual study in perspective of Industry 4.0 G Dutta, R Kumar, R Sindhwani, RK Singh Competitiveness Review: An International Business Journal 30 (3), 289-314, 2020 | 381 | 2020 |
| Can industry 5.0 revolutionize the wave of resilience and social value creation? A multi-criteria framework to analyze enablers R Sindhwani, S Afridi, A Kumar, A Banaitis, S Luthra, PL Singh Technology in Society 68, 101887, 2022 | 350 | 2022 |
| Digitalization priorities of quality control processes for SMEs: A conceptual study in perspective of Industry 4.0 adoption G Dutta, R Kumar, R Sindhwani, RK Singh Journal of intelligent manufacturing 32 (6), 1679-1698, 2021 | 219 | 2021 |
| A framework to enhance agile manufacturing system: A total interpretive structural modelling (TISM) approach R Sindhwani, V Malhotra Benchmarking: An International Journal 24 (2), 467-487, 2017 | 138 | 2017 |
| Modelling and analysis of barriers affecting the implementation of lean green agile manufacturing system (LGAMS) R Sindhwani, VK Mittal, PL Singh, A Aggarwal, N Gautam Benchmarking: An International Journal 26 (2), 498-529, 2019 | 130 | 2019 |
| Adoption of integrated lean-green-agile strategies for modern manufacturing systems VK Mittal, R Sindhwani, V Kalsariya, F Salroo, KS Sangwan, PL Singh Procedia Cirp 61, 463-468, 2017 | 115 | 2017 |
| Two-way assessment of barriers to Lean–Green Manufacturing System: insights from India VK Mittal, R Sindhwani, PK Kapur International Journal of System Assurance Engineering and Management 7 (4 …, 2016 | 111 | 2016 |
| Modelling and analysis of agile manufacturing system by ISM and MICMAC analysis R Sindhwani, V Malhotra International Journal of System Assurance Engineering and Management 8 (2 …, 2017 | 107 | 2017 |
| Modelling and analysing the enablers of digital resilience for small and medium enterprises V Kumar, R Sindhwani, A Behl, A Kaur, V Pereira Journal of enterprise information management 37 (5), 1677-1708, 2024 | 86 | 2024 |
| Agile system in health care: literature review R Sindhwani, PL Singh, DK Prajapati, A Iqbal, RK Phanden, V Malhotra Advances in industrial and production engineering: select proceedings of …, 2019 | 78 | 2019 |
| Overcoming the barriers of effective implementation of manufacturing execution system in pursuit of smart manufacturing in SMEs G Dutta, R Kumar, R Sindhwani, RK Singh Procedia Computer Science 200, 820-832, 2022 | 72 | 2022 |
| Machine learning: Best way to sustain the supply chain in the era of industry 4.0 D Nagar, S Raghav, A Bhardwaj, R Kumar, PL Singh, R Sindhwani Materials Today: Proceedings 47, 3676-3682, 2021 | 72 | 2021 |
| Knowledge development in non-fungible tokens (NFT): a scoping review A Behl, V Pereira, A Nigam, S Wamba, R Sindhwani Journal of Knowledge Management 28 (1), 232-267, 2024 | 60 | 2024 |
| Modeling the critical success factors of implementing net zero emission (NZE) and promoting resilience and social value creation R Sindhwani, PL Singh, A Behl, MS Afridi, D Sammanit, AK Tiwari Technological Forecasting and Social Change 181, 121759, 2022 | 57 | 2022 |
| Modelling and analysis of energy efficiency drivers by Fuzzy ISM and Fuzzy MICMAC approach F Sindhwani, R., Mittal, V.K.., Singh P.L., Kalsariya, V., Salroo International Journal of Productivity and Quality Management 25 (2), 225-244, 2018 | 57 | 2018 |
| Evaluation of common barriers to the combined lean-green-agile manufacturing system by two-way assessment method PL Singh, R Sindhwani, NK Dua, A Jamwal, A Aggarwal, A Iqbal, ... Advances in Industrial and Production Engineering: Select Proceedings of …, 2019 | 56 | 2019 |
| Exploring “what,”“why” and “how” of resilience in MSME sector: a m-TISM approach R Sindhwani, N Hasteer, A Behl, A Varshney, A Sharma Benchmarking: An International Journal 30 (6), 1884-1911, 2023 | 54 | 2023 |
| IIoT implementation challenges: analysis and mitigation by blockchain R Kumar, R Sindhwani, PL Singh Journal of Global Operations and Strategic Sourcing 15 (3), 363-379, 2022 | 54 | 2022 |
| Advances in industrial and production engineering K Shanker, R Shankar, R Sindhwani Select proceedings of FLAME 2018 book series, 2019 | 54 | 2019 |
| Fuzzy AHP model for challenges to thermal power plant establishment in India VK Mittal, R Sindhwani, H Shekhar, PL Singh International Journal of Operational Research 34 (4), 562-581, 2019 | 50 | 2019 |