[go: up one dir, main page]

Follow
Hervé Camus
Hervé Camus
Centrale Lille Institut, CRIStal équipe OSL
Verified email at centralelille.fr
Title
Cited by
Cited by
Year
Optimal control of a nested-multiple-product assemble-to-order system
M ElHafsi, H Camus, E Craye
International Journal of Production Research 46 (19), 5367-5392, 2008
452008
FMS Cyclic Scheduling with Overlapping production cycles
O Korbaa, H Camus, JC Gentina
Proceedings of 18th International Conference on Application and Theory of …, 1997
421997
A new cyclic scheduling algorithm for flexible manufacturing systems
O Korbaa, H Camus, JC Gentina
International Journal of Flexible Manufacturing Systems 14 (2), 173-187, 2002
402002
Petri net modeling of ratio-driven flexible manufacturing systems and implications on the WIP for cyclic schedules
H Ohl, H Camus, E Castelain, JC Gentina
1995 IEEE International Conference on Systems, Man and Cybernetics …, 1995
401995
Cyclic schedules in flexible manufacturing systems with flexibilities in operating sequences
H Camus, H Ohl, O Korbaa, JC Gentina
Proceedings of the 17th International Conference on Application and Theory …, 1996
381996
Conduite de systèmes flexibles de production manufacturière par composition de régimes permanents cycliques: modélisation et évalution de performances à l'aide des réseaux de Petri
H Camus
Lille 1, 1997
271997
An assemble-to-order system with product and components demand with lost sales
M Elhafsi, L Zhi, H Camus, E Craye
International Journal of Production Research 53 (3), 718-735, 2015
252015
A heuristic algorithm for the computation of cyclic schedules and the necessary WIP to obtain optimal cycle time
H Ohl, H Camus, E Castelain, JC Gentina
Proceedings of the Fourth International Conference on Computer Integrated …, 1994
241994
Managing an integrated production inventory system with information on the production and demand status and multiple non-unitary demand classes
M ElHafsi, H Camus, E Craye
European Journal of Operational Research 207 (2), 986-1001, 2010
222010
Reducing the computational complexity of scheduling problems in Petri nets by means of transformation rules
JC Mugarza, H Camus, JC Gentina, E Teruel, M Silva
SMC'98 Conference Proceedings. 1998 IEEE International Conference on Systems …, 1998
141998
Optimal control of a continuous-time W-configuration assemble-to-order system
M ElHafsi, J Fang, H Camus
European Journal of Operational Research 267 (3), 917-932, 2018
132018
Heuristic for the resolution of the general fms cyclic scheduling problem
O Korbaa, H Camus, JC Gentina
1997 IEEE International Conference on Systems, Man, and Cybernetics …, 1997
121997
A mixed integer linear programming approach to schedule the operating room
F Maaroufi, H Camus, O Korbaa
2016 IEEE International Conference on Systems, Man, and Cybernetics (SMC …, 2016
112016
A new cycle scheduling algorithm for flexible manufacturing systems
O Korbaa, H Camus, JC Gentina
Flexible Services and Manufacturing Journal 14 (2), 177, 2002
102002
Transient state study for cyclic schedules: bounds and optimization
O Korbaa, H Camus, JC Gentina
Proceedings of the 1997 IEEE International Symposium on Assembly and Task …, 1997
101997
Business Process Optimization by Workflow Analysis.
AH Shraideh, HG Camus, PGM Yim
CAINE, 108-113, 2009
82009
Cyclic schedules in Flexible Manufacturing Systems with groups of identical machines
H Camus, H Ohl, O Korbaa, JC Gentina
Proceedings of CIMAT 96, 345-350, 1996
81996
Evolutionary Approach for Multi-Objective Scheduling in Surgical Unit
W Chandoul, S Hammadi, H Camus, H Zgaya, C Di Pompeo, F Trincaretto
Conférence Francophone Gestion et Ingénierie des Systèmes Hospitaliers …, 2012
72012
Two stages optimization problem: New variant of Bin Packing Problem for decision making
A Shraideh, H Camus, P Yim
Computer Science and Information Technology, 2008. IMCSIT 2008 …, 2008
52008
Short term planning of cyclic production in FMSs
I Chaieb, O Korbaa, H Camus
29th International Conference on Computers and Industrial Engineering …, 2001
52001
The system can't perform the operation now. Try again later.
Articles 1–20