[go: up one dir, main page]

Follow
Ricardo Fukasawa
Ricardo Fukasawa
Verified email at uwaterloo.ca - Homepage
Title
Cited by
Cited by
Year
Robust branch-and-cut-and-price for the capacitated vehicle routing problem
R Fukasawa, H Longo, J Lysgaard, MP Aragão, M Reis, E Uchoa, ...
Mathematical programming 106 (3), 491-511, 2006
8802006
The time dependent traveling salesman problem: polyhedra and algorithm
H Abeledo, R Fukasawa, A Pessoa, E Uchoa
Mathematical Programming Computation 5 (1), 27-55, 2013
158*2013
Robust branch-cut-and-price for the capacitated minimum spanning tree problem over a large extended formulation
E Uchoa, R Fukasawa, J Lysgaard, A Pessoa, MP De Aragao, D Andrade
Mathematical Programming 112 (2), 443-472, 2008
97*2008
Exact algorithms for the chance-constrained vehicle routing problem
T Dinh, R Fukasawa, J Luedtke
Mathematical Programming 172 (1), 105-138, 2018
942018
A branch-cut-and-price algorithm for the energy minimization vehicle routing problem
R Fukasawa, Q He, Y Song
Transportation Science 50 (1), 23-34, 2016
892016
A disjunctive convex programming approach to the pollution-routing problem
R Fukasawa, Q He, Y Song
Transportation Research Part B: Methodological 94, 61-79, 2016
752016
On the exact separation of mixed integer knapsack cuts
R Fukasawa, M Goycoolea
Mathematical programming 128 (1), 19-41, 2011
54*2011
Solving the freight car flow problem to optimality
R Fukasawa, MVP de Aragão, O Porto, E Uchoa
Electronic Notes in Theoretical Computer Science 66 (6), 42-52, 2002
542002
Numerically safe Gomory mixed-integer cuts
W Cook, S Dash, R Fukasawa, M Goycoolea
INFORMS Journal on Computing 21 (4), 641-649, 2009
502009
On the mixing set with a knapsack constraint
A Abdi, R Fukasawa
Mathematical Programming 157 (1), 191-217, 2016
432016
A joint vehicle routing and speed optimization problem
R Fukasawa, Q He, F Santos, Y Song
INFORMS Journal on Computing 30 (4), 694-709, 2018
292018
A computational study of continuous and discrete time formulations for a class of short-term scheduling problems for multipurpose plants
S Lagzi, DY Lee, R Fukasawa, L Ricardez-Sandoval
Industrial & Engineering Chemistry Research 56 (31), 8940-8953, 2017
252017
A multitasking continuous time formulation for short-term scheduling of operations in multipurpose plants
S Lagzi, R Fukasawa, L Ricardez-Sandoval
Computers & Chemical Engineering 97, 135-146, 2017
232017
Scheduling of operations in a large-scale scientific services facility via multicommodity flow and an optimization-based algorithm
BP Patil, R Fukasawa, LA Ricardez-Sandoval
Industrial & Engineering Chemistry Research 54 (5), 1628-1639, 2015
232015
Strengthening lattice-free cuts using non-negativity
R Fukasawa, O Günlük
Discrete Optimization 8 (2), 229-245, 2011
232011
Lifting, tilting and fractional programming revisited
D Espinoza, R Fukasawa, M Goycoolea
Operations research letters 38 (6), 559-563, 2010
232010
Evaluating periodic rescheduling policies using a rolling horizon framework in an industrial-scale multipurpose plant
Z Stevenson, R Fukasawa, L Ricardez-Sandoval
Journal of Scheduling 23 (3), 397-410, 2020
212020
A fast combinatorial algorithm for the bilevel knapsack problem with interdiction constraints
N Weninger, R Fukasawa
Mathematical Programming 210 (1), 847-879, 2025
192025
A joint routing and speed optimization problem
R Fukasawa, Q He, F Santos, Y Song
arXiv preprint arXiv:1602.08508, 2016
162016
Adjustable robust optimization for multi-tasking scheduling with reprocessing due to imperfect tasks
NH Lappas, LA Ricardez-Sandoval, R Fukasawa, CE Gounaris
Optimization and Engineering 20 (4), 1117-1159, 2019
152019
The system can't perform the operation now. Try again later.
Articles 1–20