| A simple metaheuristic approach to the simultaneous scheduling of machines and automated guided vehicles L Deroussi, M Gourgand, N Tchernev International Journal of Production Research 46 (8), 2143-2164, 2008 | 171 | 2008 |
| Flexibility and robustness in scheduling JC Billaut, A Moukrim, E Sanlaville ISTE/John Wiley & Sons, 2008 | 150 | 2008 |
| A contribution to the stochastic flow shop scheduling problem M Gourgand, N Grangeon, S Norre European Journal of Operational Research 151 (2), 415-433, 2003 | 109 | 2003 |
| Particle swarm optimization: A study of particle displacement for solving continuous and combinatorial optimization problems SK Tchomté, M Gourgand International Journal of Production Economics 121 (1), 57-67, 2009 | 75 | 2009 |
| A new heuristic procedure for the single-row facility layout problem H Djellab, M Gourgand International Journal of computer integrated manufacturing 14 (3), 270-280, 2001 | 74 | 2001 |
| Conception d’un environnement de modélisation des systèmes de production M Gourgand, P Kellert Actes du troisieme congres international de génie industriel, Tours, France …, 1991 | 74 | 1991 |
| A review of tactical planning models M Comelli, M Gourgand, D Lemoine Journal of Systems Science and Systems Engineering 17 (2), 204-229, 2008 | 62 | 2008 |
| A new heuristic based on a hypergraph representation for the tool switching problem H Djellab, K Djellab, M Gourgand International Journal of Production Economics 64 (1-3), 165-176, 2000 | 57 | 2000 |
| A polynomial algorithm for multi-robot 2-cyclic scheduling in a no-wait robotic cell A Che, H Hu, M Chabrol, M Gourgand Computers & operations research 38 (9), 1275-1285, 2011 | 46 | 2011 |
| Scheduling multiple robots in a no-wait re-entrant robotic flowshop A Che, M Chabrol, M Gourgand, Y Wang International Journal of Production Economics 135 (1), 199-208, 2012 | 45 | 2012 |
| A review of the static stochastic flow-shop scheduling problem M Gourgand, N Grangeon, S Norre Journal of decision systems 9 (2), 1-31, 2000 | 37 | 2000 |
| Meta-heuristics for the deterministic hybrid flow shop problem M Gourgand, N Grangeon, S NORRE Journal européen des systèmes automatisés 34 (9), 1107-1135, 2000 | 36 | 2000 |
| Markovian analysis for performance evaluation and scheduling in m machine stochastic flow-shop with buffers of any capacity M Gourgand, N Grangeon, S Norre European Journal of Operational Research 161 (1), 126-147, 2005 | 35 | 2005 |
| Metaheuristics for the stochastic hoist scheduling problem (SHSP) G Fleury, M Gourgand, P Lacomme International Journal of Production Research 39 (15), 3419-3457, 2001 | 35 | 2001 |
| Genetic algorithms applied to workshop problems G Fleury, M Gourgand International Journal of Computer Integrated Manufacturing 11 (2), 183-192, 1998 | 32 | 1998 |
| Parallel genetic algorithms with migration for the hybrid flow shop scheduling problem. K Belkadi, M Gourgand, M Benyettou Adv. Decis. Sci. 2006, 65746:1-65746:17, 2006 | 31 | 2006 |
| An object-oriented methodology for manufacturing system modelling M Gourgand, P Kellert Summer Computer Simulation Conference, 1123-1123, 1992 | 31 | 1992 |
| A methodology for process evaluation and activity based costing in health care supply chain M Chabrol, J Chauvet, P Féniès, M Gourgand International Conference on Business Process Management, 375-384, 2005 | 30 | 2005 |
| A statistical approach to long-term monitoring of intracranial pressure P Janny, JP Jouan, L Janny, M Gourgand, UM Gueit Intracranial Pressure: Experimental and Clinical Aspects, 59-64, 1972 | 30 | 1972 |
| Une contribution à la mesure de la performance dans la supply chain hospitalière: L’exemple du processus opératoire P Féniès, M Gourgand, N Tchernev 2ème conférence francophone en Gestion et Ingénierie de Systèmes …, 2004 | 29 | 2004 |