| Ant colony optimization algorithm to solve for the transportation problem of cross-docking network R Musa, JP Arnaout, H Jung Computers & Industrial Engineering 59 (1), 85-92, 2010 | 212 | 2010 |
| A two-stage ant colony optimization algorithm to minimize the makespan on unrelated parallel machines with sequence-dependent setup times JP Arnaout, G Rabadi, R Musa Journal of Intelligent Manufacturing 21 (6), 693-701, 2010 | 204 | 2010 |
| Exploring the effects of cooperative adaptive cruise control on highway traffic flow using microscopic traffic simulation GM Arnaout, JP Arnaout Transportation Planning and Technology 37 (2), 186-199, 2014 | 139 | 2014 |
| A two-stage Ant Colony optimization algorithm to minimize the makespan on unrelated parallel machines—part II: enhancements and experimentations JP Arnaout, R Musa, G Rabadi Journal of Intelligent Manufacturing 25 (1), 43-53, 2014 | 112 | 2014 |
| Optimization of quality and operational costs through improved scheduling of harvest operations JPM Arnaout, M Maatouk International Transactions in operational research 17 (5), 595-605, 2010 | 84 | 2010 |
| Ant colony optimization algorithm for the Euclidean location-allocation problem with unknown number of facilities JP Arnaout Journal of Intelligent Manufacturing 24 (1), 45-54, 2013 | 59 | 2013 |
| Maximizing the utilization of operating rooms with stochastic times using simulation JPM Arnaout, S Kulbashian 2008 Winter simulation conference, 1617-1623, 2008 | 52 | 2008 |
| A worm optimization algorithm to minimize the makespan on unrelated parallel machines with sequence-dependent setup times JP Arnaout Annals of Operations Research 285 (1), 273-293, 2020 | 50 | 2020 |
| ACO for the surgical cases assignment problem C Rizk, JP Arnaout Journal of Medical Systems 36 (3), 1891-1899, 2012 | 45 | 2012 |
| Ant colony optimization algorithm to parallel machine scheduling problem with setups JP Arnaout, R Musa, G Rabadi 2008 IEEE international conference on automation science and engineering …, 2008 | 38 | 2008 |
| Heuristics for the maximization of operating rooms utilization using simulation JP Arnaout Simulation 86 (8-9), 573-583, 2010 | 36 | 2010 |
| Solving the multiple level warehouse layout problem using ant colony optimization JP Arnaout, C ElKhoury, G Karayaz Operational Research 20 (1), 473-490, 2020 | 31 | 2020 |
| Rescheduling of unrelated parallel machines under machine breakdowns JP Arnaout, G Rabadi International Journal of Applied Management Science 1 (1), 75-89, 2008 | 30 | 2008 |
| Rescheduling of parallel machines with stochastic processing and setup times JP Arnaout Journal of Manufacturing Systems 33 (3), 376-384, 2014 | 29 | 2014 |
| A dynamic heuristic for the stochastic unrelated parallel machine scheduling problem JP Arnaout, G Rabadi, JH Mun International Journal of Operations Research 3 (2), 2006 | 27 | 2006 |
| A practical decentralized access protocol for autonomous vehicles at isolated under-saturated intersections J Khoury, J Khoury, G Zouein, JP Arnaout Journal of Intelligent Transportation Systems 23 (5), 427-440, 2019 | 26 | 2019 |
| What drives Kuwaiti consumers to purchase luxury brands? MM Mostafa, JP Arnaout The International Review of Retail, Distribution and Consumer Research 30 (1 …, 2020 | 19 | 2020 |
| Heuristics for the two‐machine scheduling problem with a single server JP Arnaout International Transactions in Operational Research 24 (6), 1347-1355, 2017 | 17 | 2017 |
| Worm optimization: a novel optimization algorithm inspired by C. Elegans JP Arnaout Proceedings of the 2014 International Conference on Industrial engineering …, 2014 | 17 | 2014 |
| Port Recovery from Security Incidents: A Simulation Approach, IN: Bichou, Bell & Evans: Risk Management in Port Operations, Logistics and Supply Chain Security. G Rabadi, CA Pinto, W Talley, JP Arnaout INFORMA/Lloyd’s List Publishing, London, UK., 2007 | 14* | 2007 |