| Use of salient features for the design of a multistage framework to extract roads from high-resolution multispectral satellite images S Das, TT Mirnalinee, K Varghese IEEE transactions on Geoscience and Remote sensing 49 (10), 3906-3931, 2011 | 279 | 2011 |
| Accelerometer-based activity recognition in construction L Joshua, K Varghese Journal of Computing in Civil Engineering 25 (5), 370-379, 2010 | 206 | 2010 |
| Collision free path planning of cooperative crane manipulators using genetic algorithm MSAD Ali, NR Babu, K Varghese Journal of computing in civil engineering 19 (2), 182-193, 2005 | 196 | 2005 |
| Computer vision-based construction progress monitoring VK Reja, K Varghese, QP Ha Automation in Construction 138, 104245, 2022 | 195 | 2022 |
| Automated path planning of cooperative crane lifts using heuristic search PL Sivakumar, K Varghese, NR Babu Journal of computing in civil engineering 17 (3), 197-207, 2003 | 149 | 2003 |
| Project scheduling using dependency structure matrix JU Maheswari, K Varghese International Journal of Project Management 23 (3), 223-230, 2005 | 141 | 2005 |
| Automated path planning for mobile crane lifts HR Reddy, K Varghese Computer‐Aided Civil and Infrastructure Engineering 17 (6), 439-448, 2002 | 110 | 2002 |
| Application of dependency structure matrix for activity sequencing in concurrent engineering projects JU Maheswari, K Varghese, T Sridharan Journal of construction engineering and management 132 (5), 482-490, 2006 | 90 | 2006 |
| Routing large vehicles on industrial construction sites K Varghese, JT O'Connor Journal of construction engineering and management 121 (1), 1-12, 1995 | 81 | 1995 |
| Automated recognition of construction labour activity using accelerometers in field situations L Joshua, K Varghese International Journal of Productivity and Performance Management 63 (7), 841-862, 2014 | 73 | 2014 |
| A web-based system for design interface management of construction projects V Senthilkumar, K Varghese, A Chandran Automation in Construction 19 (2), 197-212, 2010 | 59 | 2010 |
| A heavy lift planning system for crane lifts K Varghese, P Dharwadkar, J Wolfhope, JT O'Connor Computer‐Aided Civil and Infrastructure Engineering 12 (1), 31-42, 1997 | 52 | 1997 |
| Impact of 5G Technology on IoT Applications in Construction Project Management VK Reja, K Varghese ISARC. Proceedings of the International Symposium on Automation and Robotics …, 2019 | 51 | 2019 |
| Sustainability and human settlements: fundamental issues, modeling and simulations M Monto, LS Ganesh, K Varghese Sage, 2005 | 51 | 2005 |
| Identifying and Addressing Critical Issues in the Indian Construction Industry: Perspectives of Large Building Construction Clients S Loganathan, P Srinath, M Kumaraswamy, S Kalidindi, K Varghese Journal of Construction in Developing Countries 22, 121-144, 2017 | 48 | 2017 |
| Forecastng Engineering Manpower Requirements for Highway Preconstruction Activities KR Persad, JT O'Connor, K Varghese Journal of Management in Engineering 11 (3), 41-47, 1995 | 46 | 1995 |
| Formulating a coastal zone health metric for landuse impact management in urban coastal zones PP Anilkumar, K Varghese, LS Ganesh Journal of environmental management 91 (11), 2172-2185, 2010 | 43 | 2010 |
| Identifying critical variables for coastal profiling in ICZM planning—A systems approach K Varghese, LS Ganesh, M Mani, PP Anilkumar, R Murthy, ... Ocean & Coastal Management 51 (1), 73-94, 2008 | 43 | 2008 |
| Integrated model framework to simulate sustainability of human settlements M Mani, K Varghese, LS Ganesh Journal of urban planning and development 131 (3), 147-158, 2005 | 41 | 2005 |
| Selection of Accelerometer Location on Bricklayers Using Decision Trees L Joshua, K Varghese Computer‐Aided Civil and Infrastructure Engineering, 2013 | 39 | 2013 |