| An integer optimization approach to large-scale air traffic flow management D Bertsimas, G Lulli, A Odoni Operations research 59 (1), 211-227, 2011 | 393 | 2011 |
| The European air traffic flow management problem G Lulli, A Odoni Transportation science 41 (4), 431-443, 2007 | 248 | 2007 |
| A branch-and-price algorithm for multistage stochastic integer programming with application to stochastic batch-sizing problems G Lulli, S Sen Management Science 50 (6), 786-796, 2004 | 236 | 2004 |
| The air traffic flow management problem: An integer optimization approach D Bertsimas, G Lulli, A Odoni International conference on integer programming and combinatorial …, 2008 | 156 | 2008 |
| The time slot allocation problem under uncertain capacity L Corolli, G Lulli, L Ntaimo Transportation Research Part C: Emerging Technologies 46, 16-29, 2014 | 121 | 2014 |
| Ground delay programs: Optimizing over the included flight set based on distance MO Ball, G Lulli Air traffic control quarterly 12 (1), 1-25, 2004 | 121 | 2004 |
| A dynamic programming approach for the airport capacity allocation problem P Dell'Olmo, G Lulli IMA Journal of Management Mathematics 14 (3), 235-249, 2003 | 108 | 2003 |
| A new hierarchical architecture for Air Traffic Management: Optimisation of airway capacity in a Free Flight scenario P Dell'Olmo, G Lulli European Journal of Operational Research 144 (1), 179-193, 2003 | 86 | 2003 |
| A state transition MIP formulation for the unit commitment problem S Atakan, G Lulli, S Sen IEEE Transactions on Power Systems 33 (1), 736-748, 2017 | 74* | 2017 |
| Service network design for freight railway transportation: the Italian case G Lulli, U Pietropaoli, N Ricciardi Journal of the Operational Research Society 62 (12), 2107-2119, 2011 | 63* | 2011 |
| Dynamic resource allocation: A flexible and tractable modeling framework D Bertsimas, S Gupta, G Lulli European Journal of Operational Research 236 (1), 14-26, 2014 | 61 | 2014 |
| An aggregate stochastic programming model for air traffic flow management G Andreatta, P Dell’Olmo, G Lulli European Journal of Operational Research 215 (3), 697-704, 2011 | 59 | 2011 |
| Planning efficient 4D trajectories in Air Traffic Flow Management. V Dal Sasso, FD Fomeni, G Lulli, KG Zografos European Journal of Operational Research 276 (2), 676-687, 2019 | 56 | 2019 |
| The multimode covering location problem F Colombo, R Cordone, G Lulli Computers & operations research 67, 25-33, 2016 | 41 | 2016 |
| A hyper-heuristic approach based upon a hidden Markov model for the multi-stage nurse rostering problem A Kheiri, A Gretsista, E Keedwell, G Lulli, MG Epitropakis, EK Burke Computers & operations research 130, 105221, 2021 | 40 | 2021 |
| A model of inbound air traffic: The application to Heathrow airport MV Caccavale, A Iovanella, C Lancia, G Lulli, B Scoppola Journal of Air Transport Management 34, 116-122, 2014 | 33 | 2014 |
| Incorporating Stakeholders’ priorities and preferences in 4D trajectory optimization V Dal Sasso, FD Fomeni, G Lulli, KG Zografos Transportation Research Part B: Methodological 117, 594-609, 2018 | 32 | 2018 |
| A multi-period TSP with stochastic regular and urgent demands G Andreatta, G Lulli European Journal of Operational Research 185 (1), 122-132, 2008 | 32 | 2008 |
| A heuristic procedure for stochastic integer programs with complete recourse G Lulli, S Sen European Journal of Operational Research 171 (3), 879-890, 2006 | 32 | 2006 |
| Design of quality-based composite web services F De Paoli, G Lulli, A Maurino International Conference on Service-Oriented Computing, 153-164, 2006 | 27 | 2006 |