[go: up one dir, main page]

Follow
Mariska de Wild-Scholten
Mariska de Wild-Scholten
SmartGreenScans
Verified email at smartgreenscans.nl - Homepage
Title
Cited by
Cited by
Year
Energy payback time and carbon footprint of commercial photovoltaic systems
MJM de Wild-Scholten
Solar Energy Materials and Solar Cells 119, 296-305, 2013
4492013
Life cycle inventories and life cycle assessments of photovoltaic systems
R Frischknecht, R Itten, P Sinha, M de Wild-Scholten, J Zhang, GA Heath, ...
National Renewable Energy Laboratory (NREL), Golden, CO (United States), 2014
3822014
Environmental impact of crystalline silicon photovoltaic module production
E Alsema, MJ De Wild
MRS Online Proceedings Library (OPL) 895, 0895-G03-05, 2005
362*2005
Environmental impacts of PV electricity generation-a critical comparison of energy supply options
EA Alsema, MJ de Wild-Scholten, VM Fthenakis
21st European photovoltaic solar energy conference, 3201-07, 2006
2682006
Methodology guidelines on life cycle assessment of photovoltaic electricity
V Fthenakis, R Frischknecht, M Raugei, HC Kim, E Alsema, M Held, ...
IEA PVPS Task 12, 2011
2622011
Methodology guidelines on life cycle assessment of photovoltaic electricity
R Frischknecht, G Heath, M Raugei, P Sinha, M de Wild-Scholten
NREL (National Renewable Energy Laboratory (NREL), Golden, CO (United States)), 2015
1872015
Energy Return on Energy Invested (ERoEI) for photovoltaic solar systems in regions of moderate insolation: A comprehensive response
M Raugei, S Sgouridis, D Murphy, V Fthenakis, R Frischknecht, C Breyer, ...
Energy Policy 102, 377-384, 2017
1482017
The energy payback time of advanced crystalline silicon PV modules in 2020: a prospective study
SA Mann, MJ de Wild‐Scholten, VM Fthenakis, WG Van Sark, WC Sinke
Progress in Photovoltaics: Research and Applications 22 (11), 1180-1194, 2014
1332014
A cost and environmental impact comparison of grid-connected rooftop and ground-based PV systems
MJ de Wild-Scholten, EA Alsema, EW Ter Horst, M Bächler, VM Fthenakis
21st European Photovoltaic Solar Energy Conference, 3167-73, 2006
872006
Life Cycle Assessment of Photovoltaics: update of ecoinvent data V2. 0
N Jungbluth, M Tuchschmid, M de Wild-Scholten
ESU-services Ltd 50, 22, 2008
822008
Reduction of the environmental impacts in crystalline silicon module manufacturing
EA Alsema, MJ de Wild-Schoten
22nd European Photovoltaic Solar Energy Conference, 829-836, 2007
712007
The real environmental impacts of crystalline silicon PV modules: an analysis based on up-to-date manufacturers data
EA Alsema, MJ de Wild-Scholten
Presented at the 20th European Photovoltaic Solar Energy Conference 6, 10, 2005
692005
21st European photovoltaic solar energy conference
EA Alsema, MJ De Wild-Scholten, VM Fthenakis
Dresden, Germany, 2006
582006
Energierücklaufzeiten für PV-module und systeme energy payback times of PV modules and systems
M de Wild-Scholten
Workshop Photovoltaik-Modultechnik 26, 27, 2009
572009
Methodology guidelines on life cycle assessment of photovoltaic electricity
E Alsema, D Fraile, R Frischknecht, V Fthenakis, M Held, HC Kim, W Pölz, ...
IEA PVPS Task 12, 2009
462009
Life cycle assessment of photovoltaics: Perceptions, needs, and challenges
VM Fthenakis, EA Alsema, MJ de Wild-Scholten
Conference Record of the Thirty-first IEEE Photovoltaic Specialists …, 2005
462005
Environmental life cycle assessment of advanced silicon solar cell technologies
EA Alsema, MJ de Wild-Scholten
Presented at the 19th European Photovoltaic Solar Energy Conference 7, 11, 2004
432004
Environmental profile of PV mass production: globalization
M de Wild-Scholten
26th European Photovoltaic Solar Energy Conference 5 (9), 2011
412011
Environmental life cycle analysis of dye sensitized solar devices; status and outlook
MJ de Wild-Scholten, AC Veltkamp, ES Energy
22nd European Photovoltaic Solar Energy Conference and Exhibition, 3-7, 2007
412007
Towards cleaner solar PV: Environmental and health impacts of crystalline silicon photovoltaics
M de Wild-Scholten, E Alsema
Refocus 5 (5), 46-49, 2004
382004
The system can't perform the operation now. Try again later.
Articles 1–20