[go: up one dir, main page]

Follow
Erwin Pesch
Title
Cited by
Cited by
Year
Resource-constrained project scheduling: notation, classification, models and methods
P Brucker, A Drexl, R Möhring, K Neumann, E Pesch
European Journal of Operational Research 112 (1), 3-41, 1999
63191999
Scheduling computer and manufacturing processes
J Blazewicz, KH Ecker, E Pesch, G Schmidt, J Weglarz
springer science & Business media, 2013
1731*2013
Optimization approaches for civil applications of unmanned aerial vehicles (UAVs) or aerial drones: A survey
A Otto, N Agatz, J Campbell, B Golden, E Pesch
Networks 72 (4), 411-458, 2018
11262018
The job shop scheduling problem: Conventional and new solution techniques
J Błażewicz, W Domschke, E Pesch
European journal of operational research 93 (1), 1-33, 1996
8461996
Handbook on scheduling
J Blazewicz, K Ecker, E Pesch, G Schmidt, J Weglarz
Springer International Publishing, 2019
6202019
Evolution based learning in a job shop scheduling environment
U Dorndorf, E Pesch
Computers & Operations Research 22 (1), 25-40, 1995
5681995
Genetic local search algorithms for the traveling salesman problem
NLJ Ulder, EHL Aarts, HJ Bandelt, PJM Van Laarhoven, E Pesch
International conference on parallel problem solving from nature, 109-116, 1990
3681990
Flight gate scheduling: State-of-the-art and recent developments
U Dorndorf, A Drexl, Y Nikulin, E Pesch
Omega 35 (3), 326-334, 2007
2562007
Shunting yard operations: Theoretical aspects and applications
N Boysen, M Fliedner, F Jaehn, E Pesch
European Journal of Operational Research 220 (1), 1-14, 2012
2012012
Handbook on scheduling: from theory to applications
J Błażewicz, KH Ecker, E Pesch, G Schmidt, J Węglarz
Springer Berlin Heidelberg, 2007
1992007
Approaches to empty container repositioning problems in the context of Eurasian intermodal transportation
KA Kuzmicz, E Pesch
Omega 85, 194-213, 2019
1862019
A survey on container processing in railway yards
N Boysen, M Fliedner, F Jaehn, E Pesch
Transportation Science 47 (3), 312-329, 2013
1772013
A time-oriented branch-and-bound algorithm for resource-constrained project scheduling with generalised precedence constraints
U Dorndorf, E Pesch, T Phan-Huy
Management Science 46 (10), 1365-1384, 2000
1752000
A review of exact solution methods for the non-preemptive multiprocessor flowshop problem
T Kis, E Pesch
European Journal of Operational Research 164 (3), 592-608, 2005
1642005
Sequential competitive location on networks
D Kress, E Pesch
European Journal of Operational Research 217 (3), 483-499, 2012
1632012
Modelling robust flight-gate scheduling as a clique partitioning problem
U Dorndorf, F Jaehn, E Pesch
Transportation Science 42 (3), 292-301, 2008
1632008
Scheduling in computer and manufacturing systems
J Błazewicz, KH Ecker, G Schmidt, J Węglarz
Springer Berlin Heidelberg, 1994
1521994
The disjunctive graph machine representation of the job shop scheduling problem
J Błażewicz, E Pesch, M Sterna
European Journal of Operational Research 127 (2), 317-331, 2000
1502000
A truck scheduling problem arising in intermodal container transportation
J Nossack, E Pesch
European Journal of Operational Research 230 (3), 666-680, 2013
1452013
Fast clustering algorithms
U Dorndorf, E Pesch
ORSA Journal on Computing 6 (2), 141-153, 1994
1351994
The system can't perform the operation now. Try again later.
Articles 1–20