[go: up one dir, main page]

Follow
Issa Hanou
Issa Hanou
Verified email at tudelft.nl - Homepage
Title
Cited by
Cited by
Year
Moving trains like pebbles: A feasibility study on tree yards
IK Hanou, MM de Weerdt, J Mulderij
Proceedings of the International Conference on Automated Planning and …, 2023
42023
Increasing the Capacity of Shunting Yards within the Current Infrastructure: A Computational Perspective
IK Hanou, S Dumancic, M de Weerdt, P van der Voort, R van den Broek, ...
4*
Replanning in Advance for Instant Delay Recovery in Multi-Agent Applications: Rerouting Trains in a Railway Hub
IK Hanou, DW Thomas, W Ruml, M de Weerdt
Proceedings of the International Conference on Automated Planning and …, 2024
22024
Designing an escape room sensory system
I Hanou, G Smitskamp, M de Schipper
Designing, 2020
12020
Precomputing Multi-Agent Path Replanning using Temporal Flexibility: A Case Study on the Dutch Railway Network
I Hanou, E Kemmeren, DW Thomas, M de Weerdt
arXiv preprint arXiv:2601.04884, 2026
2026
Herb. jl: A Unifying Program Synthesis Library
T Hinnerichs, RG Reid, J de Jong, B Swinkels, P Wochner, N Filat, ...
arXiv preprint arXiv:2510.09726, 2025
2025
Revisiting Landmarks: Learning from Previous Plans to Generalize over Problem Instances
I Hanou, S Dumančić, M de Weerdt
arXiv preprint arXiv:2508.21564, 2025
2025
Multi-Agent Pathfinding for Railway Routing
I Hanou, M de Weerdt
RailDresden 2025: 11th International Conference on Railway Operations …, 2025
2025
Analysis of Shunting Yard Usage and Train Unit Clustering
I Yordanov
Delft University of Technology, 2024
2024
Replanning in Advance for Instant Delay Recovery in Multi-Agent Applications
IK Hanou, DW Thomas, W Ruml, MM de Weerdt
2024
Supplementary Material Moving Trains Like Pebbles: a Feasibility Study on Tree Yards
IK Hanou, MM de Weerdt, J Mulderij
2023
Herb. jl: A Fast and Efficient Program Synthesis Library
RG Reid, T Hinnerichs, P Wochner, I Hanou, S Dumancic
The 37th Benelux Conference on Artificial Intelligence and the 34th Belgian …, 0
Applying the Pebble Motion problem: studying the feasibility of the Train Unit Shunting Problem
IK Hanou
The system can't perform the operation now. Try again later.
Articles 1–13