| Moving trains like pebbles: A feasibility study on tree yards IK Hanou, MM de Weerdt, J Mulderij Proceedings of the International Conference on Automated Planning and …, 2023 | 4 | 2023 |
| Increasing the Capacity of Shunting Yards within the Current Infrastructure: A Computational Perspective IK Hanou, S Dumancic, M de Weerdt, P van der Voort, R van den Broek, ... | 4* | |
| Replanning in Advance for Instant Delay Recovery in Multi-Agent Applications: Rerouting Trains in a Railway Hub IK Hanou, DW Thomas, W Ruml, M de Weerdt Proceedings of the International Conference on Automated Planning and …, 2024 | 2 | 2024 |
| Designing an escape room sensory system I Hanou, G Smitskamp, M de Schipper Designing, 2020 | 1 | 2020 |
| Precomputing Multi-Agent Path Replanning using Temporal Flexibility: A Case Study on the Dutch Railway Network I Hanou, E Kemmeren, DW Thomas, M de Weerdt arXiv preprint arXiv:2601.04884, 2026 | | 2026 |
| Herb. jl: A Unifying Program Synthesis Library T Hinnerichs, RG Reid, J de Jong, B Swinkels, P Wochner, N Filat, ... arXiv preprint arXiv:2510.09726, 2025 | | 2025 |
| Revisiting Landmarks: Learning from Previous Plans to Generalize over Problem Instances I Hanou, S Dumančić, M de Weerdt arXiv preprint arXiv:2508.21564, 2025 | | 2025 |
| Multi-Agent Pathfinding for Railway Routing I Hanou, M de Weerdt RailDresden 2025: 11th International Conference on Railway Operations …, 2025 | | 2025 |
| Analysis of Shunting Yard Usage and Train Unit Clustering I Yordanov Delft University of Technology, 2024 | | 2024 |
| Replanning in Advance for Instant Delay Recovery in Multi-Agent Applications IK Hanou, DW Thomas, W Ruml, MM de Weerdt | | 2024 |
| Supplementary Material Moving Trains Like Pebbles: a Feasibility Study on Tree Yards IK Hanou, MM de Weerdt, J Mulderij | | 2023 |
| Herb. jl: A Fast and Efficient Program Synthesis Library RG Reid, T Hinnerichs, P Wochner, I Hanou, S Dumancic The 37th Benelux Conference on Artificial Intelligence and the 34th Belgian …, 0 | | |
| Applying the Pebble Motion problem: studying the feasibility of the Train Unit Shunting Problem IK Hanou | | |