| Time-cost-quality trade-off analysis for highway construction K El-Rayes, A Kandil Journal of construction Engineering and Management 131 (4), 477-486, 2005 | 544 | 2005 |
| Optimizing resource utilization for repetitive construction projects K El-Rayes, O Moselhi Journal of construction engineering and management 127 (1), 18-27, 2001 | 257 | 2001 |
| Change orders impact on labor productivity O Moselhi, I Assem, K El-Rayes Journal of Construction Engineering and Management 131 (3), 354-359, 2005 | 256 | 2005 |
| Optimal planning and scheduling for repetitive construction projects K Hyari, K El-Rayes Journal of Management in Engineering 22 (1), 11-19, 2006 | 213 | 2006 |
| Trade-off between safety and cost in planning construction site layouts K El-Rayes, A Khalafallah Journal of construction engineering and management 131 (11), 1186-1195, 2005 | 212 | 2005 |
| Optimizing resource leveling in construction projects K El-Rayes, DH Jun Journal of construction engineering and management 135 (11), 1172-1180, 2009 | 189 | 2009 |
| Impact of rainfall on the productivity of highway construction K El-Rayes, O Moselhi Journal of construction engineering and management 127 (2), 125-131, 2001 | 181 | 2001 |
| Scheduling of repetitive projects with cost optimization O Moselhi, K El-Rayes Journal of Construction Engineering and Management 119 (4), 681-697, 1993 | 178 | 1993 |
| Resource-driven scheduling of repetitive activities K El-Rayes, O Moselhi Construction management & economics 16 (4), 433-446, 1998 | 177 | 1998 |
| Optimizing material procurement and storage on construction sites H Said, K El-Rayes Journal of construction engineering and management 137 (6), 421-431, 2011 | 165 | 2011 |
| Automated multi-objective construction logistics optimization system H Said, K El-Rayes Automation in Construction 43, 110-122, 2014 | 140 | 2014 |
| Dynamic site layout planning using approximate dynamic programming K El-Rayes, H Said Journal of computing in civil engineering 23 (2), 119-127, 2009 | 132 | 2009 |
| Parallel genetic algorithms for optimizing resource utilization in large-scale construction projects A Kandil, K El-Rayes Journal of Construction engineering and Management 132 (5), 491-498, 2006 | 118 | 2006 |
| Estimating weather impact on the duration of construction activities O Moselhi, D Gong, K El-Rayes Canadian Journal of Civil Engineering 24 (3), 359-366, 1997 | 116 | 1997 |
| Multiobjective optimization of resource leveling and allocation during construction scheduling D Heon Jun, K El-Rayes Journal of construction engineering and management 137 (12), 1080-1088, 2011 | 110 | 2011 |
| Optimizing postdisaster reconstruction planning for damaged transportation networks W Orabi, K El-Rayes, AB Senouci, H Al-Derham Journal of Construction Engineering and Management 135 (10), 1039-1048, 2009 | 110 | 2009 |
| Performance of global optimization models for dynamic site layout planning of construction projects H Said, K El-Rayes Automation in Construction 36, 71-78, 2013 | 109 | 2013 |
| Scan2BIM-NET: Deep learning method for segmentation of point clouds for scan-to-BIM Y Perez-Perez, M Golparvar-Fard, K El-Rayes Journal of Construction Engineering and Management 147 (9), 04021107, 2021 | 104 | 2021 |
| Optimizing resource utilization during the recovery of civil infrastructure systems W Orabi, AB Senouci, K El-Rayes, H Al-Derham Journal of management in engineering 26 (4), 237-246, 2010 | 92 | 2010 |
| Optimal utilization of interior building spaces for material procurement and storage in congested construction sites H Said, K El-Rayes Automation in construction 31, 292-306, 2013 | 91 | 2013 |