| Comparative life cycle assesment (LCA) and life cycle cost analysis (LCCA) of precast and cast–in–place buildings in United States T Vasishta, MH Mehany, J Killingsworth Journal of Building Engineering 67, 105921, 2023 | 97 | 2023 |
| Claims and project performance between traditional and alternative project delivery methods MS Hashem M. Mehany, G Bashettiyavar, B Esmaeili, G Gad Journal of Legal Affairs and Dispute Resolution in Engineering and …, 2018 | 71 | 2018 |
| Causes of road and bridge construction claims: Analysis of Colorado department of transportation projects MS Hashem M. Mehany, N Grigg Journal of Legal Affairs and Dispute Resolution in Engineering and …, 2015 | 41 | 2015 |
| A literature survey of the fracking economic and environmental implications in the United States MSHM Mehany, A Guggemos Procedia Engineering 118, 169-176, 2015 | 32 | 2015 |
| US construction industry managerial strategies for economic recession and recovery: A Delphi study M Tummalapudi, J Killingsworth, C Harper, M Mehaney Journal of Construction Engineering and Management 147 (11), 04021146, 2021 | 30 | 2021 |
| An evaluation of training delivery methods’ effects on construction safety training and knowledge retention-a foundational study MS Hashem M. Mehany, J Killingsworth, S Shah International Journal of Construction Education and Research 17 (1), 18-36, 2021 | 27 | 2021 |
| Knowledge, skills, and abilities for senior-level construction managers: a us industry-based Delphi study RT Pathuri, J Killingsworth, MSHM Mehany International Journal of Construction Education and Research 18 (3), 234-250, 2022 | 20 | 2022 |
| General contractors’ experience using off-site structural framing systems J Killingsworth, MH Mehany, H Ladhari Construction Innovation 21 (1), 40-63, 2021 | 19 | 2021 |
| Analyzing the feasibility of fracking in the US using macro level life cycle cost analysis and assessment approaches—A foundational study MSHM Mehany, S Kumar Sustainable Production and Consumption 20, 375-388, 2019 | 18 | 2019 |
| COVID-19 pandemic impacts on construction projects H Ataei, D Becker, JR Hellenbrand, MSHM Mehany, TE Mitchell, ... American Society of Civil Engineers, 2021 | 17 | 2021 |
| Implications of collection period variance in the construction industry J Killingsworth, MH Mehany Journal of financial management of property and construction 23 (3), 330-348, 2018 | 13 | 2018 |
| Integrating Building Information Models and Building Operation Information Exchange Systems in a Decision Support Framework for Facilities Management M Sadeghi, M Mehany, K Strong Construction Research Congress 2018, 770-779, 2018 | 13 | 2018 |
| Lean construction principles past and present–a business model consistency M Mehany 51st ASC Annual International Conference Proceedings, 371-377, 2015 | 13 | 2015 |
| Information-augmented exchange objects to inform facilities management BIM guidelines: introducing the level of semantics schema M Sadeghi, JW Elliott, MH Mehany Journal of Facilities Management 21 (2), 260-281, 2023 | 12 | 2023 |
| Delay claims in road construction: Best practices for a standard delay claims management system MS Hashem M. Mehany, N Grigg Journal of Legal Affairs and Dispute Resolution in Engineering and …, 2016 | 12 | 2016 |
| Automatic verification of facilities management handover building information models M Sadeghi, JW Elliott, MSHM Mehany Construction Research Congress 2020, 488-497, 2020 | 11 | 2020 |
| A standardized framework for quantitative assessment of cities’ socioeconomic resilience and its improvement measures S Kumar, MSHM Mehany Socio-Economic Planning Sciences 79, 101141, 2022 | 10 | 2022 |
| Dispute prevention and resolution methods used on public highway projects employing different project delivery methods MHM Mehany, GM Gad, B Esmaeili Transportation Research Board 96th Annual MeetingTransportation Research Board, 2017 | 10 | 2017 |
| Assessment of construction workers' mental health to improve wellbeing MSHM Mehany, GG Fisher, S Kumar | 8 | 2024 |
| Dispute resolution and contract incentives: Perceptions of project stakeholders A Marathe, MS Hashem M. Mehany, B Senior, K Strong Journal of legal affairs and dispute resolution in engineering and …, 2017 | 8 | 2017 |