[go: up one dir, main page]

Follow
Leonas Ustinovičius
Leonas Ustinovičius
Other namesLeonas Ustinovichius, Leonas Ustinovicius
Professor of Vilnius Gediminas technical university, Bialystok University of Technology: Bialystok
Verified email at vgtu.lt
Title
Cited by
Cited by
Year
The benefits, obstacles and problems of practical BIM implementation
D Migilinskas, V Popov, V Juocevicius, L Ustinovichius
Procedia engineering 57, 767-774, 2013
6322013
The use of a virtual building design and construction model for developing an effective project concept in 5D environment
V Popov, V Juocevicius, D Migilinskas, L Ustinovichius, S Mikalauskas
Automation in construction 19 (3), 357-367, 2010
2492010
Application of a quantitative multiple criteria decision making (MCDM-1) approach to the analysis of investments in construction
L Ustinovichius, EK Zavadskas, V Podvezko
Control and cybernetics 36 (1), 251-268, 2007
2472007
Sensitivity analysis for multiple criteria decision making methods: TOPSIS and SAW
R Simanaviciene, L Ustinovichius
Procedia-Social and Behavioral Sciences 2 (6), 7743-7744, 2010
1432010
Development of software for multiple criteria evaluation
EK Zavadskas, L Ustinovichius, F Peldschus
Informatica 14 (2), 259-272, 2003
1362003
Multi‐attribute analysis of investments risk alternatives in construction
G Shevchenko, L Ustinovichius, A Andruškevičius
Technological and economic development of economy 14 (3), 428-443, 2008
1352008
Attributes weights determining peculiarities in multiple attribute decision making methods
EK Zavadskas, Z Turskis, L Ustinovičius, G Ševčenko
Technologija, 2010
1142010
Computer-aided decision-making in construction project development
MV Książek, PO Nowak, S Kivrak, JH Rosłon, L Ustinovichius
Journal of civil engineering and management 21 (2), 248-259, 2015
1102015
System of project multicriteria decision synthesis in construction
V Šarka, EK Zavadskas, L Ustinovičius, E Šarkiene, Č Ignatavičius
Technological and economic development of economy 14 (4), 546-565, 2008
1092008
Promoting sustainability through investment in Building Information Modeling (BIM) technologies: A design company perspective
M Reizgevičius, L Ustinovičius, D Cibulskienė, V Kutut, L Nazarko
Sustainability 10 (3), 600, 2018
1052018
Overview of risk allocation between construction parties
A Peckiene, A Komarovska, L Ustinovicius
Procedia Engineering 57, 889-894, 2013
1052013
Multicriteria valuation of commercial construction projects for investment purposes
EK Zavadskas, L Ustinovichius, A Stasiulionis
Journal of civil engineering and management 10 (2), 151-166, 2004
1002004
LEVI 3.0—multiple criteria evaluation program for construction solutions
EK Zavadskas, L Ustinovičius, Z Turskis, F Peldschus, D Messing
Journal of civil engineering and management 8 (3), 184-191, 2002
802002
Statybos investicijų efektyvumo sistemotechninis įvertinimas
L Ustinovičius, EK Zavadskas
Technika, 2004
782004
Evaluation of construction process safety solutions using the TOPSIS method
R Liaudanskienė, L Ustinovičius, A Bogdanovičius
Technologija, 2009
772009
Determination of efficiency of investments in construction
L Ustinovichius
International journal of strategic property management 8 (1), 25-43, 2004
662004
Innovative research projects in the field of building lifecycle management
L Ustinovičius, R Rasiulis, L Nazarko, T Vilutienė, M Reizgevicius
Procedia Engineering 122, 166-171, 2015
602015
Computer-aided modelling, evaluation and management of construction projects according to PLM concept
D Migilinskas, L Ustinovichius
International Conference on Cooperative Design, Visualization and …, 2006
572006
BIM-based process management model for building design and refurbishment
L Ustinovichius, V Popov, J Cepurnaite, T Vilutienė, M Samofalov, ...
Archives of Civil and Mechanical Engineering 18 (4), 1136-1149, 2018
522018
Crucial factors for improving the ISO 14001 environmental management system
J Ejdys, A Matuszak-Flejszman, M Szymanski, L Ustinovichius, ...
Journal of Business Economics and Management 17 (1), 52-73, 2016
502016
The system can't perform the operation now. Try again later.
Articles 1–20