| Real-time decision-support system for high-mix low-volume production scheduling in industry 4.0 B Kocsi, MM Matonya, LP Pusztai, I Budai Processes 8 (8), 912, 2020 | 74 | 2020 |
| Potential connections of unique manufacturing and industry 4.0 B Kocsi, J Oláh LogForum 13 (4), 2017 | 43 | 2017 |
| A risk-based analysis approach to sustainable construction by environmental impacts N Erdenekhuu, B Kocsi, D Máté Energies 15 (18), 6736, 2022 | 20 | 2022 |
| Implementing quantitative techniques to improve decision making in construction projects: A case study O Abusalem, N Bertalan, B Kocsi Pollack Periodica 14 (3), 223-234, 2019 | 12 | 2019 |
| Making engineering projects more thoughtful with the use of fuzzy value-based project planning L Pusztai, B Kocsi, I Budai Pollack Periodica 14 (1), 25-34, 2019 | 12 | 2019 |
| Characterization of Clinical Vancomycin-Resistant Enterococcus faecium Isolated in Eastern Hungary D Franyó, B Kocsi, V Lesinszki, J Pászti, A Kozák, EE Bukta, J Szabó, ... Microbial Drug Resistance 24 (10), 1559-1567, 2018 | 9 | 2018 |
| Assessing the intestinal carriage rates of vancomycin-resistant enterococci (VRE) at a tertiary care hospital in Hungary D Franyó, B Kocsi, EE Bukta, J Szabó, Z Dombrádi Folia Microbiologica 65 (3), 483-490, 2020 | 7 | 2020 |
| Evaluation of Suppliers at A Steel Structure Manufacturer K Keller, B Kocsi, I Budai Műszaki Tudományos Közlemények 9 (1), 111-114, 2018 | 6 | 2018 |
| Real-Time Decision-Support System for High-Mix Low-Volume Production Scheduling in Industry 4.0. Processes, 8 (8), 912 B Kocsi, MM Matonya, LP Pusztai, I Budai | 5 | 2020 |
| Production planning, scheduling and risk analysis in manufacturing operations by robotic process automation MM Matonya, B Kocsi, LP Pusztai, I Budai | 4 | 2020 |
| Monte-Carlo szimuláción és kockázatértékelésen alapuló folyamat elemző keretrendszer B Kocsi PQDT-Global, 2020 | 2 | 2020 |
| New approach for resource allocation in digital healthcare 4.0 B Kocsi, L Pusztai, I Budai Proceedings 5th CARPE Conference: Horizon Europe and beyond, 244-251, 2019 | 2 | 2019 |
| Business process development with the application of simulation technique LP Pusztai, B Kocsi, I Budai | 2 | 2017 |
| Potential connections of unique manufacturing and industry. LogForum 13 (4): 389–400 B Kocsi, J Oláh | 2 | 2017 |
| Autóipari termelő vállalat gyártási folyamatának optimalizálása lean eszközökkel A Nyárádi, B Kocsi, I Tornyos, I Budai | 2 | 2016 |
| A Risk-Based Analysis Approach to Sustainable Construction by Environmental Impacts. Energies 2022, 15, 6736 N Erdenekhuu, B Kocsi, D Máté s Note: MDPI stays neutral with regard to jurisdictional claims in published …, 2022 | 1 | 2022 |
| Investigation of a production process under uncertainty L Pusztai, B Kocsi, I Budai, L Nagy Pollack Periodica 15 (2), 49-59, 2020 | 1 | 2020 |
| Kapacitásszámítási modell fejlesztése B Kocsi, I Budai International Journal of Engineering and Management Sciences 1 (1), 1-19, 2016 | 1 | 2016 |
| Model calculations on the use of mobile and stationary units for wood pellet production J Szendrei, G Grasseli, B Kocsi, I Budai, E Szűcs International Journal of Engineering and Management Sciences 1 (1), 1-8, 2016 | 1 | 2016 |
| Monte-Carlo szimulációval támogatott üzleti folyamatfejlesztés D Kósa, Z Kósáné Estefán, B Kocsi Mesterséges Intelligencia 3 (2), 97-104, 2021 | | 2021 |