| Nurse rostering problems––a bibliographic survey B Cheang, H Li, A Lim, B Rodrigues European journal of operational research 151 (3), 447-460, 2003 | 759 | 2003 |
| A metaheuristic for the pickup and delivery problem with time windows H Li, A Lim Proceedings 13th IEEE international conference on tools with artificial …, 2001 | 678 | 2001 |
| Local search with annealing-like restarts to solve the VRPTW H Li, A Lim European journal of operational research 150 (1), 115-127, 2003 | 214 | 2003 |
| Order scheduling in an environment with dedicated resources in parallel JYT Leung, H Li, M Pinedo Journal of Scheduling 8 (5), 355-386, 2005 | 127 | 2005 |
| Scheduling orders for multiple product types to minimize total weighted completion time JYT Leung, H Li, M Pinedo Discrete Applied Mathematics 155 (8), 945-970, 2007 | 104 | 2007 |
| Scheduling orders for multiple product types with due date related objectives JYT Leung, H Li, M Pinedo European Journal of Operational Research 168 (2), 370-389, 2006 | 72 | 2006 |
| A hybrid AI approach for nurse rostering problem H Li, A Lim, B Rodrigues Proceedings of the 2003 ACM symposium on Applied computing, 730-735, 2003 | 65 | 2003 |
| Order scheduling models: an overview JYT Leung, H Li, M Pinedo Multidisciplinary Scheduling: Theory and Applications: 1st International …, 2005 | 62 | 2005 |
| Approximation algorithms for minimizing total weighted completion time of orders on identical machines in parallel JYT Leung, H Li, M Pinedo Naval Research Logistics (NRL) 53 (4), 243-260, 2006 | 46 | 2006 |
| Scheduling orders on either dedicated or flexible machines in parallel to minimize total weighted completion time JYT Leung, H Li, M Pinedo Annals of Operations Research 159 (1), 107-123, 2008 | 39 | 2008 |
| Minimizing total weighted completion time when scheduling orders in a flexible environment with uniform machines JYT Leung, H Li, M Pinedo, J Zhang Information Processing Letters 103 (3), 119-129, 2007 | 39 | 2007 |
| Open shops with jobs overlap––revisited JYT Leung, H Li, M Pinedo, C Sriskandarajah European Journal of Operational Research 163 (2), 569-571, 2005 | 31 | 2005 |
| Scheduling coupled-tasks on a single machine H Li, H Zhao 2007 IEEE Symposium on Computational Intelligence in Scheduling, 137-142, 2007 | 23 | 2007 |
| Scheduling two-machine flow shops with exact delays JYT Leung, H Li, H Zhao International Journal of Foundations of Computer Science 18 (02), 341-359, 2007 | 21 | 2007 |
| Minimizing total completion time in two-machine flow shops with exact delays Y Huo, H Li, H Zhao Computers & operations research 36 (6), 2018-2030, 2009 | 19 | 2009 |
| Local search with annealing-like restarts to solve the vehicle routing problem with time windows H Li, A Lim Proceedings of the 2002 ACM symposium on Applied Computing, 560-565, 2002 | 14 | 2002 |
| Order scheduling in dedicated and flexible machine environments H Li New Jersey Institute of Technology, 2005 | 3 | 2005 |
| Minimizing the number of late multi-task jobs on identical machines in parallel L Li, H Li, H Zhao 2016 Federated Conference on Computer Science and Information Systems …, 2016 | 1 | 2016 |