| Approaches for the joint resolution of lot-sizing and scheduling with infeasibilities occurrences FF Alves, TH Nogueira, MC de Souza, MG Ravetti Computers & Industrial Engineering 155, 107176, 2021 | 18 | 2021 |
| Hybrid proactive approach for solving maintenance and planning problems in the scenario of Industry 4.0 FF Alves, MG Ravetti IFAC-PapersOnLine 53 (3), 216-221, 2020 | 13 | 2020 |
| Integrated lot sizing and production scheduling formulations: an application in a refractory cement industry FF Alves, TH Nogueira, RS Henriques, PV Castro Gestão & Produção 23, 204-218, 2016 | 8 | 2016 |
| Learning algorithms to deal with failures in production planning FF Alves, TH Nogueira, MG Ravetti Computers & Industrial Engineering 169, 108231, 2022 | 3 | 2022 |
| Efficiency comparison of proactive approaches to deal with machine failures FF Alves, MG Ravetti IFAC-PapersOnLine 55 (10), 767-772, 2022 | 2 | 2022 |
| A Hybrid Mixed-Integer Linear Programming and Reinforcement Learning Framework for Integrated Mineral Supply Chain Optimization T Costa, T Nogueira, G Bomtempo, E de Souza, B Pimentel, F Alves, ... Available at SSRN 5224700, 0 | 1 | |
| Production planning problems subject to machine failures considering characteristics of an industry 4.0 environment F de Freitas Alves Universidade Federal de Minas Gerais, 2022 | | 2022 |
| Modelos integrados de dimensionamento e sequenciamento da produção: aplicação em uma fábrica de cimento para refratário FF Alves, TH Nogueira, RS Henriques, PV Castro Gestão & Produção 23, 204-218, 2016 | | 2016 |
| Modelos integrados de dimensionamento e sequenciamento da produção: aplicação em uma fábrica de cimento para refratário F de Freitas Alves, TH Nogueira, R de Souza Henriques, PV de Castro | | |
| Comparison of different cuts to interactively solve production lot-sizing and scheduling problems in cases of infeasibilities FF Alves, MC de Souza, TH Nogueira, MG Ravetti Local Organizing Committee, 16, 0 | | |
| AN ALISE E PROPOSIC AO DE DIFERENTES ESTRAT EGIAS PARA RESOLUC AO CONJUNTA DE PROBLEMAS DE DIMENSIONAMENTO E SEQUENCIAMENTO DA PRODUC AO F de Freitas Alves, TH Nogueira, MC de Souza, MG Ravetti | | |