| A particle swarm optimization based hyper-heuristic algorithm for the classic resource constrained project scheduling problem G Koulinas, L Kotsikas, K Anagnostopoulos Information Sciences 277, 680-693, 2014 | 262 | 2014 |
| Risk analysis and assessment in the worksites using the fuzzy-analytical hierarchy process and a quantitative technique–A case study for the Greek construction sector GK Koulinas, PK Marhavilas, OE Demesouka, AP Vavatsikos, ... Safety science 112, 96-104, 2019 | 140 | 2019 |
| Reinforcement learning for combined production-maintenance and quality control of a manufacturing system with deterioration failures PD Paraschos, GK Koulinas, DE Koulouriotis Journal of Manufacturing Systems 56, 470-483, 2020 | 124 | 2020 |
| The integration of HAZOP study with risk-matrix and the analytical-hierarchy process for identifying critical control-points and prioritizing risks in industry–A case study PK Marhavilas, M Filippidis, GK Koulinas, DE Koulouriotis Journal of Loss Prevention in the Process Industries 62, 103981, 2019 | 89 | 2019 |
| An expanded HAZOP-study with fuzzy-AHP (XPA-HAZOP technique): Application in a sour crude-oil processing plant PK Marhavilas, M Filippidis, GK Koulinas, DE Koulouriotis Safety science 124, 104590, 2020 | 80 | 2020 |
| A new tabu search-based hyper-heuristic algorithm for solving construction leveling problems with limited resource availabilities GK Koulinas, KP Anagnostopoulos Automation in Construction 31, 169-175, 2013 | 80 | 2013 |
| Schedule delay risk analysis in construction projects with a simulation-based expert system GK Koulinas, AS Xanthopoulos, TT Tsilipiras, DE Koulouriotis Buildings 10 (8), 134, 2020 | 65 | 2020 |
| Risk assessment using fuzzy TOPSIS and PRAT for sustainable engineering projects GK Koulinas, OE Demesouka, PK Marhavilas, AP Vavatsikos, ... Sustainability 11 (3), 615, 2019 | 65 | 2019 |
| A simulated annealing hyperheuristic for construction resource levelling KP Anagnostopoulos, GK Koulinas Construction management and economics 28 (2), 163-175, 2010 | 59 | 2010 |
| A HAZOP with MCDM based risk-assessment approach: Focusing on the deviations with economic/health/environmental impacts in a process industry PK Marhavilas, M Filippidis, GK Koulinas, DE Koulouriotis Sustainability 12 (3), 993, 2020 | 53 | 2020 |
| Construction resource allocation and leveling using a threshold accepting–Based hyperheuristic algorithm GK Koulinas, KP Anagnostopoulos Journal of Construction Engineering and Management 138 (7), 854-863, 2011 | 53 | 2011 |
| Energy unit cost assessment of six photovoltaic-battery configurations IE Kosmadakis, C Elmasides, G Koulinas, KP Tsagarakis Renewable Energy 173, 24-41, 2021 | 47 | 2021 |
| Safety-assessment by hybridizing the MCDM/AHP & HAZOP-DMRA techniques through safety’s level colored maps: Implementation in a petrochemical industry PK Marhavilas, M Filippidis, GK Koulinas, DE Koulouriotis Alexandria Engineering Journal 61 (9), 6959-6977, 2022 | 45 | 2022 |
| Project resources scheduling and leveling using Multi-Attribute Decision Models: Models implementation and case study C Markou, GK Koulinas, AP Vavatsikos Expert Systems with Applications 77, 160-169, 2017 | 42 | 2017 |
| Machine learning integrated design and operation management for resilient circular manufacturing systems PD Paraschos, AS Xanthopoulos, GK Koulinas, DE Koulouriotis Computers & Industrial Engineering 167, 107971, 2022 | 39 | 2022 |
| Resource-constrained critical path scheduling by a GRASP-based hyperheuristic K Anagnostopoulos, G Koulinas Journal of Computing in Civil Engineering 26 (2), 204-213, 2012 | 39 | 2012 |
| A joint stochastic/deterministic process with multi-objective decision making risk-assessment framework for sustainable constructions engineering projects—A case study PK Marhavilas, MG Tegas, GK Koulinas, DE Koulouriotis Sustainability 12 (10), 4280, 2020 | 35 | 2020 |
| A TOPSIS—risk matrix and Monte Carlo expert system for risk assessment in engineering projects GK Koulinas, OE Demesouka, KA Sidas, DE Koulouriotis Sustainability 13 (20), 11277, 2021 | 30 | 2021 |
| A Decision Trees-based knowledge mining approach for controlling a complex production system G Koulinas, P Paraschos, D Koulouriotis Procedia Manufacturing 51, 1439-1445, 2020 | 26 | 2020 |
| A genetic hyperheuristic algorithm for the resource constrained project scheduling problem KP Anagnostopoulos, GK Koulinas IEEE Congress on Evolutionary Computation, 1-6, 2010 | 25 | 2010 |