[go: up one dir, main page]

Follow
Harun Aydilek
Harun Aydilek
Associate Professor of Applied Math at Abdullah Al Salem University
Verified email at aasu.edu.kw - Homepage
Title
Cited by
Cited by
Year
The two stage assembly flowshop scheduling problem to minimize total tardiness
A Allahverdi, H Aydilek
Journal of Intelligent Manufacturing 26 (2), 225-237, 2015
862015
No-wait flowshop scheduling problem with two criteria; total tardiness and makespan
A Allahverdi, H Aydilek, A Aydilek
European Journal of Operational Research 269 (2), 590-601, 2018
742018
Total completion time with makespan constraint in no-wait flowshops with setup times
A Allahverdi, H Aydilek
European Journal of Operational Research 238 (3), 724-734, 2014
522014
Single machine scheduling problem with interval processing times to minimize mean weighted completion time
A Allahverdi, H Aydilek, A Aydilek
Computers & Operations Research 51, 200-207, 2014
502014
Heuristics for the two-machine flowshop scheduling problem to minimise makespan with bounded processing times
A Allahverdi, H Aydilek
International Journal of Production Research 48 (21), 6367-6385, 2010
502010
No-wait flowshop scheduling problem with separate setup times to minimize total tardiness subject to makespan
A Allahverdi, H Aydilek, A Aydilek
Applied Mathematics and Computation 365, 124688, 2020
482020
Production in a two-machine flowshop scheduling environment with uncertain processing and setup times to minimize makespan
A Aydilek, H Aydilek, A Allahverdi
International Journal of Production Research 53 (9), 2803-2819, 2015
482015
Heuristics for no-wait flowshops with makespan subject to mean completion time
H Aydilek, A Allahverdi
Applied Mathematics and Computation 219 (1), 351-359, 2012
402012
Increasing the profitability and competitiveness in a production environment with random and bounded setup times
A Aydilek, H Aydilek, A Allahverdi
International Journal of Production Research 51 (1), 106-117, 2013
382013
Two-stage assembly scheduling problem for minimizing total tardiness with setup times
A Allahverdi, H Aydilek, A Aydilek
Applied mathematical modelling 40 (17-18), 7796-7815, 2016
372016
Algorithms for no-wait flowshops with total completion time subject to makespan
A Allahverdi, H Aydilek
The International Journal of Advanced Manufacturing Technology 68 (9), 2237-2251, 2013
362013
Algorithms for minimizing the number of tardy jobs for reducing production cost with uncertain processing times
A Aydilek, H Aydilek, A Allahverdi
Applied mathematical modelling 45, 982-996, 2017
332017
A polynomial time heuristic for the two-machine flowshop scheduling problem with setup times and random processing times
H Aydilek, A Allahverdi
Applied Mathematical Modelling 37 (12-13), 7164-7173, 2013
262013
The efect of body weight on the knee joint biomechanics based on subject‑specifc fnite element‑musculoskeletal approach
RH Malek Adouni, HarunAydilek, Tanvir Faisal
Scientific Reports 14, 2024
242024
Heuristics for the two-machine flowshop scheduling problem to minimize maximum lateness with bounded processing times
A Allahverdi, H Aydilek
Computers & Mathematics with Applications 60 (5), 1374-1384, 2010
242010
Two-machine flowshop scheduling problem with bounded processing times to minimize total completion time
H Aydilek, A Allahverdi
Computers & mathematics with applications 59 (2), 684-693, 2010
232010
Minimising maximum tardiness in assembly flowshops with setup times
A Aydilek, H Aydilek, A Allahverdi
International Journal of Production Research 55 (24), 7541-7565, 2017
182017
Minimizing the number of tardy jobs on a two-stage assembly flowshop
A Allahverdi, A Aydilek, H Aydilek
Journal of Industrial and Production Engineering 33 (6), 391-403, 2016
182016
An algorithm for a no-wait flowshop scheduling problem for minimizing total tardiness with a constraint on total completion time
A Allahverdi, H Aydilek, A Aydilek
International Journal of Industrial Engineering Computations 13 (1), 43-50, 2022
152022
More effective heuristics for a two-machine no-wait flowshop to minimize maximum lateness
H Aydilek, A Aydilek, M Allahverdi, A Allahverdi
International Journal of Industrial Engineering Computations 13 (4), 2022
142022
The system can't perform the operation now. Try again later.
Articles 1–20