| Deterministic order-up-to level policies in an inventory routing problem L Bertazzi, G Paletta, MG Speranza Transportation Science 36 (1), 119-132, 2002 | 322 | 2002 |
| A heuristic for the periodic vehicle routing problem M Gaudioso, G Paletta Transportation Science 26 (2), 86-92, 1992 | 219 | 1992 |
| Analysis of the maximum level policy in a production-distribution system C Archetti, L Bertazzi, G Paletta, MG Speranza Computers & Operations Research 38 (12), 1731-1746, 2011 | 207 | 2011 |
| Minimizing the total cost in an integrated vendor—Managed inventory system L Bertazzi, G Paletta, MG Speranza Journal of heuristics 11 (5), 393-419, 2005 | 170 | 2005 |
| Parallel machine scheduling to minimize the makespan with sequence dependent deteriorating effects AJ Ruiz-Torres, G Paletta, E Pérez Computers & Operations Research 40 (8), 2051-2061, 2013 | 74 | 2013 |
| The period traveling salesman problem: a new heuristic algorithm G Paletta Computers & Operations Research 29 (10), 1343-1352, 2002 | 65 | 2002 |
| A heuristic for the periodic rural postman problem G Ghiani, R Musmanno, G Paletta, C Triki Computers & operations research 32 (2), 219-228, 2005 | 50 | 2005 |
| An improved heuristic for the period traveling salesman problem L Bertazzi, G Paletta, MG Speranza Computers & Operations Research 31 (8), 1215-1222, 2004 | 50 | 2004 |
| A ship-truck intermodal transportation problem D Infante, G Paletta, F Vocaturo Maritime economics & logistics 11 (3), 247-259, 2009 | 47 | 2009 |
| A multiperiod traveling salesman problem: heuristic algorithms G Paletta Computers & operations research 19 (8), 789-795, 1992 | 46 | 1992 |
| Scheduling to maximise worker satisfaction and on-time orders AJ. Ruiz-Torres, N. Alomoto, G. Paletta, E. Perez International Journal of Production Research 53 (9), 2836-2852, 2015 | 43 | 2015 |
| Scheduling workers: A multi-criteria model considering their satisfaction AJ Ruiz-Torres, JH Ablanedo-Rosas, S Mukhopadhyay, G Paletta Computers & Industrial Engineering 128, 747-754, 2019 | 33 | 2019 |
| Solving the asymmetric traveling salesman problem with periodic constraints G Paletta, C Triki Networks: an International Journal 44 (1), 31-37, 2004 | 29 | 2004 |
| A new heuristic for workload balancing on identical parallel machines and a statistical perspective on the workload balancing criteria A Cossari, JC Ho, G Paletta, AJ Ruiz-Torres Computers & Operations Research 39 (7), 1382-1393, 2012 | 28 | 2012 |
| Stability analysis of PWM feedback control systems with PID regulators M La Cava, G Paletta, C Picardi International Journal of Control 39 (5), 987-1005, 1984 | 27 | 1984 |
| Makespan minimisation with sequence-dependent machine deterioration and maintenance events AJ Ruiz-Torres, G Paletta, R M’Hallah International Journal of Production Research 55 (2), 462-479, 2017 | 26 | 2017 |
| Optimization of join strategies in distributed databases P Legato, G Paletta, L Palopoli Information systems 16 (4), 363-374, 1991 | 18 | 1991 |
| A new approximation algorithm for the nonpreemptive scheduling of independent jobs on identical parallel processors G Paletta, P Pietramala SIAM Journal on Discrete Mathematics 21 (2), 313-328, 2007 | 17 | 2007 |
| Minimizing workload balancing criteria on identical parallel machines A Cossari, JC Ho, G Paletta, AJ Ruiz-Torres Journal of Industrial and Production Engineering 30 (3), 160-172, 2013 | 16 | 2013 |
| A composite algorithm for multiprocessor scheduling G Paletta, F Vocaturo Journal of Heuristics 17 (3), 281-301, 2011 | 14 | 2011 |