| Designing a regional forest fuel supply network M Gronalt, P Rauch Biomass and Bioenergy 31 (6), 393-402, 2007 | 179 | 2007 |
| Securing home health care in times of natural disasters A Trautsamwieser, M Gronalt, P Hirsch OR spectrum 33 (3), 787-813, 2011 | 167 | 2011 |
| New savings based algorithms for time constrained pickup and delivery of full truckloads M Gronalt, RF Hartl, M Reimann European Journal of Operational Research 151 (3), 520-535, 2003 | 162 | 2003 |
| A decision support system for coordinated disaster relief distribution C Fikar, M Gronalt, P Hirsch Expert Systems with Applications 57, 104-116, 2016 | 148 | 2016 |
| Exact and heuristic algorithms for the vehicle routing problem with multiple interdependent time windows KF Doerner, M Gronalt, RF Hartl, G Kiechle, M Reimann Computers & Operations Research 35 (9), 3034-3048, 2008 | 148 | 2008 |
| Understanding the impact of cascade effects of natural disasters on disaster relief operations R Berariu, C Fikar, M Gronalt, P Hirsch International Journal of Disaster Risk Reduction 12, 350-356, 2015 | 136 | 2015 |
| SavingsAnts for the vehicle routing problem K Doerner, M Gronalt, RF Hartl, M Reimann, C Strauss, M Stummer Workshops on Applications of Evolutionary Computation, 11-20, 2002 | 111 | 2002 |
| Metaheuristics for the vehicle routing problem with loading constraints KF Doerner, G Fuellerer, RF Hartl, M Gronalt, M Iori Networks: An International Journal 49 (4), 294-307, 2007 | 102 | 2007 |
| A decision support system to investigate dynamic last-mile distribution facilitating cargo-bikes C Fikar, P Hirsch, M Gronalt International Journal of Logistics Research and Applications 21 (3), 300-317, 2018 | 97 | 2018 |
| Minimizing driving times and greenhouse gas emissions in timber transport with a near-exact solution approach M Oberscheider, J Zazgornik, CB Henriksen, M Gronalt, P Hirsch Scandinavian Journal of Forest Research 28 (5), 493-506, 2013 | 72 | 2013 |
| Log-truck scheduling with a tabu search strategy M Gronalt, P Hirsch Metaheuristics: Progress in Complex Systems Optimization, 65-88, 2007 | 70 | 2007 |
| Job sequencing and component set-up on a surface mount placement machine HO Gunther, M Gronalt, R Zeller Production Planning & Control 9 (2), 201-211, 1998 | 61 | 1998 |
| Modelling interrelationships between logistics and transportation operations–a system dynamics approach G Aschauer, M Gronalt, C Mandl Management research review 38 (5), 505-539, 2015 | 54 | 2015 |
| The terminal location problem in the forest fuels supply network P Rauch, M Gronalt International Journal of Forest Engineering 21 (2), 32-40, 2010 | 53 | 2010 |
| Vendor managed inventory in wood processing industries-a case study M Gronalt, P Rauch Silva Fennica 42 (1), 101, 2008 | 47 | 2008 |
| The train marshalling by a single shunting engine problem JA Adlbrecht, B Hüttler, J Zazgornik, M Gronalt Transportation Research Part C: Emerging Technologies 58, 56-72, 2015 | 41 | 2015 |
| Component kitting in semi-automated printed circuit board assembly HO Günther, M Gronalt, F Piller International Journal of Production Economics 43 (2-3), 213-226, 1996 | 41 | 1996 |
| A heuristic for component switching on SMT placement machines M Gronalt, M Grunow, HO Günther, R Zeller International Journal of Production Economics 53 (2), 181-190, 1997 | 39 | 1997 |
| Multilevel neighborhood search for solving full truckload routing problems arising in timber transportation U Derigs, M Pullmann, U Vogel, M Oberscheider, M Gronalt, P Hirsch Electronic Notes in Discrete Mathematics 39, 281-288, 2012 | 37 | 2012 |
| The effects of rising energy costs and transportation mode mix on forest fuel procurement costs P Rauch, M Gronalt Biomass and Bioenergy 35 (1), 690-699, 2011 | 36 | 2011 |