[go: up one dir, main page]

Follow
Lukas Barner
Lukas Barner
Verified email at tu-berlin.de
Title
Cited by
Cited by
Year
Repurposing natural gas pipelines for hydrogen: Limits and options from a case study in Germany
K Télessy, L Barner, F Holz
International Journal of Hydrogen Energy 80, 821-831, 2024
442024
A multi-commodity partial equilibrium model of imperfect competition in future global hydrogen markets
L Barner
Energy 311, 133284, 2024
142024
LNG Import Capacity Expansion in Germany--Short-term Relief Likely to Turn into Medium-term Stranded Assets.
F Holz, L Barner, K Hainsch, C Kemfert, K Loffler, B Steigerwald, ...
IAEE Energy Forum, 12-18, 2023
102023
Is Russian gas still needed in the European Union? Model-based analysis of long-term scenarios
L Barner, F Holz, C von Hirschhausen, C Kemfert
Energy Strategy Reviews 58, 101646, 2025
72025
Electricity Access, Decarbonization, and Integration of Renewables: Insights and Lessons from the Energy Transformation in Bangladesh, South Asia, and Sub-Sahara Africa
S Groh, L Barner, G Heinemann, C von Hirschhausen
Springer Nature, 2023
62023
Deutschlands Gasversorgung ein Jahr nach russischem Angriff auf Ukraine gesichert, kein weiterer Ausbau von LNG-Terminals nötig
F Holz, CR von Hirschhausen, R Sogalla, L Barner, B Steigerwald, ...
Berlin: Deutsches Institut für Wirtschaftsforschung (DIW), 2023
62023
On the impact of imperfect competition in global hydrogen markets
R Dupke, L Dux, S Bitny-Szlachto, NL Schwald, L Barner
Zeitschrift für Energiewirtschaft 47 (Suppl 1), 56-69, 2024
42024
Gasversorgung in Deutschland stabil: Ausbau von LNG-Infrastruktur nicht notwendig
C von Hirschhausen, L Barner, F Holz, C Kemfert, N Kunz, F Präger, ...
DIW aktuell, 2024
42024
Energiewirtschaftliche und industriepolitische Bewertung des Energie-und Industrieprojekts Mukran mit dem Bau von LNG-Infrastruktur und Pipelineanbindung nach Lubmin. Endbericht
F Präger, L Barner, F Hoffart, C Kemfert, B Steigerwald, ...
DIW Berlin: Politikberatung kompakt, 2023
42023
The global hydrogen market 2050–A model-based comparison of pathways and policy constraints
L Barner, F Holz, L Rathje, R Sogalla, TU Christian von Hirschhausen
32021
On strategic behavior in electricity markets during the 2022 energy crisis: An ex-post analysis for the German power sector
M Krzywnicka, L Barner
Energy Reports 13, 5474-5485, 2025
22025
Ensuring low-emission electricity purchasing requires a broader systems perspective
L Langer, K Bruninx, A Bjørn, L Barner, J Lavalley, HV Ghadim, ...
iScience 28 (5), 2025
22025
Sanctions against Russian gas would not endanger EU or German gas supply
F Holz, L Barner, C Kemfert, CR von Hirschhausen
DIW Weekly Report 14 (21), 149-156, 2024
22024
Sanktionen gegen russisches Erdgas würden Versorgung in EU und Deutschland nicht gefährden
F Holz, L Barner, C Kemfert, CR von Hirschhausen
DIW Wochenbericht 91 (21), 307-315, 2024
12024
Electricity markets stabilized following the energy crisis: 80 percent renewable energy and coal phase-out by 2030 are possible
M Kendziorski, L Barner, C Kemfert, CR von Hirschhausen, E Wiebrow
DIW Weekly Report 14 (16/17/18), 129-136, 2024
12024
„Long-Term Development of European Natural Gas Markets–Scenario Analysis Using the Global Gas Model (GGM)“
L Barner, R Egging-Bratseth, F Holz, C Kemfert, B Steigerwald, ...
Gehalten auf der Economics of Natural Gas, Paris, France, Mai 22, 2023
12023
ON SENSITIVITIES IN A FUTURE GLOBAL HYDROGEN MARKET
L Barner, R Dupke, F Holz
Energy Solutions for a Sustainable and Inclusive Future, 46th IAEE …, 2025
2025
On strategic behavior in electricity markets during the 2022 energy crisis
M Krzywnicka, L Barner
Elsevier BV, 2025
2025
Strommärkte nach Energiekrise stabilisiert: 80 Prozent erneuerbare Energien und Kohleausstieg bis 2030 erreichbar
M Kendziorski, L Barner, C Kemfert, CR von Hirschhausen, E Wiebrow
DIW Wochenbericht 91 (18), 267-274, 2024
2024
Gasversorgung in Deutschland stabil: Ausbau von LNG-Infrastruktur nicht notwendig
N Kunz, C Kemfert, F Präger, B Steigerwald, CR von Hirschhausen, ...
Berlin: Deutsches Institut für Wirtschaftsforschung (DIW), 2024
2024
The system can't perform the operation now. Try again later.
Articles 1–20