| A new heuristic for the n-job, M-machine flow-shop problem JC Ho, YL Chang European journal of operational research 52 (2), 194-202, 1991 | 284 | 1991 |
| Opportunities in green supply chain management JC Ho, MK Shalishali, TLB Tseng, DS Ang The Coastal Business Journal 8 (1), 18-31, 2009 | 196 | 2009 |
| A new heuristic algorithm for the one-dimensional bin-packing problem JND Gupta, JC Ho Production Planning & Control 10 (6), 598-603, 1999 | 174 | 1999 |
| Minimizing the number of tardy jobs for m parallel machines JC Ho, YL Chang European Journal of Operational Research 84 (2), 343-355, 1995 | 149 | 1995 |
| Flowshop sequencing with mean flowtime objective JC Ho European journal of operational research 81 (3), 571-578, 1995 | 119 | 1995 |
| An integrated MRP and JIT framework JC Ho, YL Chang Computers & Industrial Engineering 41 (2), 173-185, 2001 | 100 | 2001 |
| Heuristics for minimizing mean tardiness for m parallel machines JC Ho, YL Chang Naval Research Logistics (NRL) 38 (3), 367-381, 1991 | 96 | 1991 |
| Flowshop scheduling with dominant machines JC Ho, JND Gupta Computers & Operations Research 22 (2), 237-246, 1995 | 91 | 1995 |
| Single machine hierarchical scheduling with customer orders and multiple job classes JND Gupta, JC Ho, JAA van der Veen Annals of Operations Research 70 (0), 127-143, 1997 | 64 | 1997 |
| Makespan minimization for m parallel identical processors JC Ho, JS Wong Naval Research Logistics (NRL) 42 (6), 935-948, 1995 | 63 | 1995 |
| Scheduling uniform parallel machines subject to a secondary resource to minimize the number of tardy jobs AJ Ruiz-Torres, FJ López, JC Ho European journal of operational research 179 (2), 302-315, 2007 | 59 | 2007 |
| The impacts of technology evolution on market structure for green products JCP Su, L Wang, JC Ho Mathematical and Computer Modelling 55 (3-4), 1381-1400, 2012 | 53 | 2012 |
| An evaluation of lot-sizing heuristics for deteriorating inventory in material requirements planning systems JC Ho, AO Solis, YL Chang Computers & Operations Research 34 (9), 2562-2575, 2007 | 50 | 2007 |
| Minimizing makespan subject to minimum flowtime on two identical parallel machines JND Gupta, JC Ho Computers & Operations Research 28 (7), 705-717, 2001 | 44 | 2001 |
| The impact of delayed differentiation in make-to-order environments JCP Su, YL Chang, M Ferguson, JC Ho International Journal of Production Research 48 (19), 5809-5829, 2010 | 38 | 2010 |
| Minimizing the normalized sum of square for workload deviations on m parallel processors JC Ho, TLB Tseng, AJ Ruiz-Torres, FJ López Computers & Industrial Engineering 56 (1), 186-192, 2009 | 38 | 2009 |
| A zero trust architecture for health information systems OC Edo, D Ang, P Billakota, JC Ho Health and Technology 14 (1), 189-199, 2024 | 36 | 2024 |
| A computational analysis of the impact of correlation and data translation on DEA efficiency scores FJ López, JC Ho, AJ Ruiz-Torres Journal of Industrial and Production Engineering 33 (3), 192-204, 2016 | 35 | 2016 |
| Generating Pareto schedules with outsource and internal parallel resources AJ Ruiz-Torres, JC Ho, FJ López International Journal of Production Economics 103 (2), 810-825, 2006 | 35 | 2006 |
| Applying a hybrid data-mining approach to prediction problems: a case of preferred suppliers prediction TL Tseng, CC Huang, F Jiang, JC Ho International Journal of Production Research 44 (14), 2935-2954, 2006 | 34 | 2006 |