[go: up one dir, main page]

Follow
Baris Selcuk
Title
Cited by
Cited by
Year
The effect of updating lead times on the performance of hierarchical planning systems
B Selcuk, JC Fransoo, AG De Kok
International Journal of Production Economics 104 (2), 427-440, 2006
692006
Work-in-process clearing in supply chain operations planning
B Selçuk, JC Fransoo, AG De Kok
Iie Transactions 40 (3), 206-220, 2008
602008
Joint spare parts inventory and reliability decisions under a service constraint
B Selçuk, S Ağralı
Journal of the Operational Research Society 64 (3), 446-458, 2013
502013
An explicit analysis of the lead time syndrome: stability condition and performance evaluation
B Selçuk, IJBF Adan, TG De Kok, JC Fransoo
International journal of production Research 47 (9), 2507-2529, 2009
412009
Optimal keyword bidding in search-based advertising with target exposure levels
B Selçuk, Ö Özlük
European Journal of Operational Research 226 (1), 163-172, 2013
292013
Adaptive lead time quotation in a pull production system with lead time responsive demand
B Selçuk
Journal of Manufacturing Systems 32 (1), 138-146, 2013
292013
Dynamic performance of hierarchical planning systems: modeling and evaluation with dynamic planned lead times
B Selcuk
282007
An adaptive base stock policy for repairable item inventory control
B Selçuk
International Journal of Production Economics 143 (2), 304-315, 2013
212013
Sequential testing in batches
R Daldal, Ö Özlük, B Selçuk, Z Shahmoradi, T Ünlüyurt
Annals of Operations Research 253 (1), 97-116, 2017
152017
Optimal keyword bidding in search-based advertising with budget constraint and stochastic ad position
H Küçükaydin, B Selçuk, Ö Özlük
Journal of the Operational Research Society 71 (4), 566-578, 2020
112020
Sequential Testing in Batches
T Ünlüyurt, Z Shahmoradi, Ö Özluk, B Selcuk, R Daldal
Annals Of Operations Research, 2017
2017
The system can't perform the operation now. Try again later.
Articles 1–11