[go: up one dir, main page]

Follow
Marc Goerigk
Title
Cited by
Cited by
Year
Algorithm engineering in robust optimization
M Goerigk, A Schöbel
Algorithm engineering: selected results and surveys, 245-279, 2016
1852016
A comprehensive evacuation planning model and genetic solution algorithm
M Goerigk, K Deghdak, P Heßler
Transportation research part E: logistics and transportation review 71, 82-97, 2014
1632014
Branch and bound algorithms for the bus evacuation problem
M Goerigk, B Grün, P Heßler
Computers & Operations Research 40 (12), 3010-3020, 2013
1022013
Line planning with user-optimal route choice
M Goerigk, M Schmidt
European Journal of Operational Research 259 (2), 424-436, 2017
992017
Improving the modulo simplex algorithm for large-scale periodic timetabling
M Goerigk, A Schöbel
Computers & Operations Research 40 (5), 1363-1370, 2013
982013
A robust bus evacuation model with delayed scenario information
M Goerigk, B Grün
Or Spectrum 36 (4), 923-948, 2014
96*2014
Evaluating line concepts using travel times and robustness: Simulations with the lintim toolbox
M Goerigk, M Schachtebeck, A Schöbel
Public Transport 5 (3), 267-284, 2013
902013
A two-stage robustness approach to evacuation planning with buses
M Goerigk, K Deghdak, V T’Kindt
Transportation Research Part B: Methodological 78, 66-82, 2015
872015
Algorithms and uncertainty sets for data-driven robust shortest path problems
A Chassein, T Dokka, M Goerigk
European Journal of Operational Research 274 (2), 671-686, 2019
802019
Recovery-to-optimality: A new two-stage approach to robustness with an application to aperiodic timetabling
M Goerigk, A Schöbel
Computers & Operations Research 52, 1-15, 2014
782014
An experimental comparison of periodic timetabling models
M Siebert, M Goerigk
Computers & Operations Research 40 (10), 2251-2259, 2013
742013
Data-driven robust optimization using deep neural networks
M Goerigk, J Kurtz
Computers & Operations Research 151, 106087, 2023
64*2023
The price of strict and light robustness in timetable information
M Goerigk, M Schmidt, A Schöbel, M Knoth, M Müller-Hannemann
Transportation Science 48 (2), 225-242, 2014
642014
Combining bus evacuation with location decisions: A branch-and-price approach
M Goerigk, B Grün, P Heßler
Transportation Research Procedia 2, 783-791, 2014
622014
Robust load planning of trains in intermodal transportation
F Bruns, M Goerigk, S Knust, A Schöbel
OR spectrum 36 (3), 631-668, 2014
602014
An empirical analysis of robustness concepts for timetabling
M Goerigk, A Schöbel
10th Workshop on Algorithmic Approaches for Transportation Modelling …, 2010
602010
The quadratic shortest path problem: complexity, approximability, and solution methods
B Rostami, A Chassein, M Hopf, D Frey, C Buchheim, F Malucelli, ...
European Journal of Operational Research 268 (2), 473-485, 2018
552018
The robust knapsack problem with queries
M Goerigk, M Gupta, J Ide, A Schöbel, S Sen
Computers & Operations Research 55, 12-22, 2015
492015
A scenario-based approach for robust linear optimization
M Goerigk, A Schöbel
International conference on theory and practice of algorithms in (computer …, 2011
482011
The price of robustness in timetable information
M Goerigk, M Knoth, M Müller-Hannemann, M Schmidt, A Schöbel
11th Workshop on Algorithmic Approaches for Transportation Modelling …, 2011
482011
The system can't perform the operation now. Try again later.
Articles 1–20